A simple approximation for a multistage capacitated production‐inventory system
Author
Abstract
Suggested Citation
DOI: 10.1002/(SICI)1520-6750(199602)43:13.0.CO;2-N
Download full text from publisher
References listed on IDEAS
- Yong-Joo Lee & Paul Zipkin, 1992. "Tandem Queues with Planned Inventories," Operations Research, INFORMS, vol. 40(5), pages 936-947, October.
- Tayur, S.R., 1992. "Computing the Optimal Policy for Capacitated Inventory Models," GSIA Working Papers 1992-07, Carnegie Mellon University, Tepper School of Business.
- Pierre L'Ecuyer & Peter W. Glynn, 1994. "Stochastic Optimization by Simulation: Convergence Proofs for the GI/G/1 Queue in Steady-State," Management Science, INFORMS, vol. 40(11), pages 1562-1578, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Opher Baron, 2008. "Regulated Random Walks and the LCFS Backlog Probability: Analysis and Application," Operations Research, INFORMS, vol. 56(2), pages 471-486, April.
- Robert N. Boute & Marc R. Lambrecht & Benny Van Houdt, 2007. "Performance evaluation of a production/inventory system with periodic review and endogenous lead times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(4), pages 462-473, June.
- Stephen C. Graves & Tor Schoenmeyr, 2016. "Strategic Safety-Stock Placement in Supply Chains with Capacity Constraints," Manufacturing & Service Operations Management, INFORMS, vol. 18(3), pages 445-460, July.
- Woonghee Tim Huh & Ganesh Janakiraman & Mahesh Nagarajan, 2016. "Capacitated Multiechelon Inventory Systems: Policies and Bounds," Manufacturing & Service Operations Management, INFORMS, vol. 18(4), pages 570-584, October.
- Fangruo Chen & Rungson Samroengraja, 2004. "Order Volatility and Supply Chain Costs," Operations Research, INFORMS, vol. 52(5), pages 707-722, October.
- Hernan Caceres & Dongchen Yu & Alexander Nikolaev, 2018. "Evaluating shortfall distributions in periodic inventory systems with stochastic endogenous demands and lead-times," Annals of Operations Research, Springer, vol. 271(2), pages 405-427, December.
- Woonghee Tim Huh & Ganesh Janakiraman & Mahesh Nagarajan, 2010. "Technical Note ---Capacitated Serial Inventory Systems: Sample Path and Stability Properties Under Base-Stock Policies," Operations Research, INFORMS, vol. 58(4-part-1), pages 1017-1022, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
- Xiuli Chao & Xiting Gong & Cong Shi & Chaolin Yang & Huanan Zhang & Sean X. Zhou, 2018. "Approximation Algorithms for Capacitated Perishable Inventory Systems with Positive Lead Times," Management Science, INFORMS, vol. 64(11), pages 5038-5061, November.
- van Houtum, G. J. & Inderfurth, K. & Zijm, W. H. M., 1996. "Materials coordination in stochastic multi-echelon systems," European Journal of Operational Research, Elsevier, vol. 95(1), pages 1-23, November.
- Jian Yang & Zhaoqiong Qin, 2007. "Capacitated Production Control with Virtual Lateral Transshipments," Operations Research, INFORMS, vol. 55(6), pages 1104-1119, December.
- Almehdawe, Eman & Jewkes, Elizabeth, 2013. "Performance analysis and optimization of hybrid manufacturing systems under a batch ordering policy," International Journal of Production Economics, Elsevier, vol. 144(1), pages 200-208.
- Sumit Kunnumkal & Huseyin Topaloglu, 2009. "A stochastic approximation method for the single-leg revenue management problem with discrete demand distributions," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 70(3), pages 477-504, December.
- Papadopoulos, H. T. & Heavey, C., 1996. "Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines," European Journal of Operational Research, Elsevier, vol. 92(1), pages 1-27, July.
- Yang, Jian & Qi, Xiangtong & Xia, Yusen & Yu, Gang, 2006. "Inventory control with Markovian capacity and the option of order rejection," European Journal of Operational Research, Elsevier, vol. 174(1), pages 622-645, October.
- Tito Homem-de-Mello, 2001. "Estimation of Derivatives of Nonsmooth Performance Measures in Regenerative Systems," Mathematics of Operations Research, INFORMS, vol. 26(4), pages 741-768, November.
- Caldentey, René. & Wein, Lawrence M., 1999. "Analysis of decentralized production-inventory system," Working papers WP 4099-99., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Bo Li & Antonio Arreola‐Risa, 2022. "Minimizing conditional value‐at‐risk under a modified basestock policy," Production and Operations Management, Production and Operations Management Society, vol. 31(4), pages 1822-1838, April.
- Uday Rao & Alan Scheller-Wolf & Sridhar Tayur, 2000. "Development of a Rapid-Response Supply Chain at Caterpillar," Operations Research, INFORMS, vol. 48(2), pages 189-204, April.
- Rubinstein, Reuven Y., 1997. "Optimization of computer simulation models with rare events," European Journal of Operational Research, Elsevier, vol. 99(1), pages 89-112, May.
- A. B. Dieker & S. Ghosh & M. S. Squillante, 2017. "Optimal Resource Capacity Management for Stochastic Networks," Operations Research, INFORMS, vol. 65(1), pages 221-241, February.
- Woonghee Tim Huh & Ganesh Janakiraman & Mahesh Nagarajan, 2010. "Technical Note ---Capacitated Serial Inventory Systems: Sample Path and Stability Properties Under Base-Stock Policies," Operations Research, INFORMS, vol. 58(4-part-1), pages 1017-1022, August.
- Leyuan Shi & Sigurdur O´lafsson, 2000. "Nested Partitions Method for Stochastic Optimization," Methodology and Computing in Applied Probability, Springer, vol. 2(3), pages 271-291, September.
- Guillermo Gallego & Paul Zipkin, 1999. "Stock Positioning and Performance Estimation in Serial Production-Transportation Systems," Manufacturing & Service Operations Management, INFORMS, vol. 1(1), pages 77-88.
- Gupta, Diwakar & Weerawat, Waressara, 2006. "Supplier-manufacturer coordination in capacitated two-stage supply chains," European Journal of Operational Research, Elsevier, vol. 175(1), pages 67-89, November.
- René Caldentey & Lawrence M. Wein, 2003. "Analysis of a Decentralized Production-Inventory System," Manufacturing & Service Operations Management, INFORMS, vol. 5(1), pages 1-17, November.
- Vanteddu, Gangaraju & Chinnam, Ratna Babu & Gushikin, Oleg, 2011. "Supply chain focus dependent supplier selection problem," International Journal of Production Economics, Elsevier, vol. 129(1), pages 204-216, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:43:y:1996:i:1:p:41-58. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.