Scheduling with earliness and tardiness penalties
Author
Abstract
Suggested Citation
DOI: 10.1002/1520-6750(199203)39:23.0.CO;2-Z
Download full text from publisher
References listed on IDEAS
- John J. Kanet, 1981. "Minimizing the average deviation of job completion times about a common due date," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 28(4), pages 643-651, December.
- Sankaran Lakshminarayan & Ram Lakshmanan & Robert L. Papineau & Rene Rochette, 1978. "Technical Note—Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties," Operations Research, INFORMS, vol. 26(6), pages 1079-1082, December.
- Alan G. Merten & Mervin E. Muller, 1972. "Variance Minimization in Single Machine Sequencing Problems," Management Science, INFORMS, vol. 18(9), pages 518-528, May.
- Jeffrey B. Sidney, 1977. "Optimal Single-Machine Scheduling with Earliness and Tardiness Penalties," Operations Research, INFORMS, vol. 25(1), pages 62-69, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yeong‐Dae Kim & Candace Arai Yano, 1994. "Minimizing mean tardiness and earliness in single‐machine scheduling problems with unequal due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(7), pages 913-933, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Uttarayan Bagchi & Yih‐Long Chang & Robert S. Sullivan, 1987. "Minimizing absolute and squared deviations of completion times with different earliness and tardiness penalties and a common due date," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(5), pages 739-751, October.
- Yeong‐Dae Kim & Candace Arai Yano, 1994. "Minimizing mean tardiness and earliness in single‐machine scheduling problems with unequal due dates," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(7), pages 913-933, December.
- J. Steve Davis & John J. Kanet, 1993. "Single‐machine scheduling with early and tardy completion costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(1), pages 85-101, February.
- Joseph Y.‐T. Leung, 2002. "A dual criteria sequencing problem with earliness and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(4), pages 422-431, June.
- Chung‐Lun Li & T. C. E. Cheng, 1994. "The parallel machine min‐max weighted absolute lateness scheduling problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 33-46, February.
- Awi Federgruen & Gur Mosheiov, 1997. "Heuristics for multimachine minmax scheduling problems with general earliness and tardiness costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(3), pages 287-299, April.
- John J. Kanet & V. Sridharan, 2000. "Scheduling with Inserted Idle Time: Problem Taxonomy and Literature Review," Operations Research, INFORMS, vol. 48(1), pages 99-110, February.
- Gur Mosheiov, 2000. "Minimizing mean absolute deviation of job completion times from the mean completion time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(8), pages 657-668, December.
- G A Álvarez-Pérez & J L González-Velarde & J W Fowler, 2009. "Crossdocking— Just in Time scheduling: an alternative solution approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(4), pages 554-564, April.
- Missaoui, Ahmed & Ruiz, Rubén, 2022. "A parameter-Less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows," European Journal of Operational Research, Elsevier, vol. 303(1), pages 99-113.
- Ganesan, Viswanath Kumar & Sivakumar, Appa Iyer, 2006. "Scheduling in static jobshops for minimizing mean flowtime subject to minimum total deviation of job completion times," International Journal of Production Economics, Elsevier, vol. 103(2), pages 633-647, October.
- Ng, C. T. & Cai, X. & Cheng, T. C. E., 1996. "A tight lower bound for the completion time variance problem," European Journal of Operational Research, Elsevier, vol. 92(1), pages 211-213, July.
- Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
- Y. P. Aneja & S. N. Kabadi & A. Nagar, 1998. "Minimizing weighted mean absolute deviation of flow times in single machine systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(3), pages 297-311, April.
- N. V. R. Mahadev & Aleksandar Pekeč & Fred S. Roberts, 1998. "On the Meaningfulness of Optimal Solutions to Scheduling Problems: Can an Optimal Solution be Nonoptimal?," Operations Research, INFORMS, vol. 46(3-supplem), pages 120-134, June.
- Cai, X., 1995. "Minimization of agreeably weighted variance in single machine systems," European Journal of Operational Research, Elsevier, vol. 85(3), pages 576-592, September.
- Feng Li & Zhi-Long Chen & Zhi-Long Chen, 2017. "Integrated Production, Inventory and Delivery Problems: Complexity and Algorithms," INFORMS Journal on Computing, INFORMS, vol. 29(2), pages 232-250, May.
- Nessah, Rabia & Chu, Chengbin, 2010.
"A lower bound for weighted completion time variance,"
European Journal of Operational Research, Elsevier, vol. 207(3), pages 1221-1226, December.
- R. Nessah & C. Chu, 2010. "A lower bound for weighted completion time variance," Post-Print hal-00572982, HAL.
- Andreas C. Nearchou & Sotiris L. Omirou, 2024. "Self-Adaptive Biased Differential Evolution for Scheduling Against Common Due Dates," SN Operations Research Forum, Springer, vol. 5(2), pages 1-29, June.
- Michael X. Weng & Jose A. Ventura, 1994. "Scheduling about a large common due date with tolerance to minimize mean absolute deviation of completion times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(6), pages 843-851, October.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:39:y:1992:i:2:p:229-245. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.