IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v53y2015i9p2590-2604.html
   My bibliography  Save this article

Single-machine two-agent scheduling involving a just-in-time criterion

Author

Listed:
  • Dvir Shabtay
  • Omri Dover
  • Moshe Kaspi

Abstract

We study a set of single-machine two-agent scheduling problems where the performance measure of the first agent, F1$ F_{1} $, is the weighted number of jobs completed exactly at the due date, i.e. completed in a just-in-time mode. The performance measure of the second agent, F2$ F_{2} $, is either the makespan, the total completion times or the weighted number of jobs completed exactly at the due date. For each combination of performance measures of the two agents, we study four different variations of the problem. We show that all four-problem variations are strongly NP$ \mathcal NP $-hard for when the performance measure of the second agent is either the makespan or the total completion time, even if all of the first agent’s weights are equal. We also study the special case of these problems where the job processing times of the second agent are all equal. For this special case, we prove that three variations of this problem are ordinary NP$ \mathcal NP $-hard with respect to the instance size, while all four problem variations are polynomial solvable with respect to the number of jobs. For the problem where the performance measure of both agents is the weighted number of jobs completed at the due date, we show that one problem variation is solvable in polynomial time, while all other three variations are ordinary NP$ \mathcal NP $-hard.

Suggested Citation

  • Dvir Shabtay & Omri Dover & Moshe Kaspi, 2015. "Single-machine two-agent scheduling involving a just-in-time criterion," International Journal of Production Research, Taylor & Francis Journals, vol. 53(9), pages 2590-2604, May.
  • Handle: RePEc:taf:tprsxx:v:53:y:2015:i:9:p:2590-2604
    DOI: 10.1080/00207543.2014.970706
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2014.970706
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2014.970706?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Baruch Mor & Gur Mosheiov, 2016. "Minimizing maximum cost on a single machine with two competing agents and job rejection," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(12), pages 1524-1531, December.
    2. Hermelin, Danny & Kubitza, Judith-Madeleine & Shabtay, Dvir & Talmon, Nimrod & Woeginger, Gerhard J., 2019. "Scheduling two agents on a single machine: A parameterized analysis of NP-hard problems," Omega, Elsevier, vol. 83(C), pages 275-286.
    3. Shabtay, Dvir, 2022. "Single-machine scheduling with machine unavailability periods and resource dependent processing times," European Journal of Operational Research, Elsevier, vol. 296(2), pages 423-439.
    4. Omri Dover & Dvir Shabtay, 2016. "Single machine scheduling with two competing agents, arbitrary release dates and unit processing times," Annals of Operations Research, Springer, vol. 238(1), pages 145-178, March.
    5. Omri Dover & Dvir Shabtay, 2016. "Single machine scheduling with two competing agents, arbitrary release dates and unit processing times," Annals of Operations Research, Springer, vol. 238(1), pages 145-178, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:53:y:2015:i:9:p:2590-2604. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.