Automated Petri-net modelling based on production management data

Author

Listed:
  • D. Gradišar
  • G. Mušič

Abstract

Timed Petri nets can be used for the modelling and analysis of a wide range of concurrent discrete-event systems, e.g. production systems. The present paper describes how to do so while starting from the information about the structure of a production facility and about the products usually given in production-data management systems. We describe a method for using these data to algorithmically build a Petri-net model. The timed Petri-net simulator, which was built in Matlab®, is also described. This simulator makes it possible to introduce heuristics, and in this way production operations can be scheduled. To demonstrate the applicability of our approach, we applied it to a scheduling problem in a multi-product batch plant.

Suggested Citation

  • D. Gradišar & G. Mušič, 2007. "Automated Petri-net modelling based on production management data," Mathematical and Computer Modelling of Dynamical Systems, Taylor & Francis Journals, vol. 13(3), pages 267-290, June.
  • Handle: RePEc:taf:nmcmxx:v:13:y:2007:i:3:p:267-290
    DOI: 10.1080/13873950600834082
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/13873950600834082
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/13873950600834082?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. S. S. Panwalkar & Wafik Iskander, 1977. "A Survey of Scheduling Rules," Operations Research, INFORMS, vol. 25(1), pages 45-61, February.
    2. Yeh, Chung-Hsing, 1997. "Schedule based production," International Journal of Production Economics, Elsevier, vol. 51(3), pages 235-242, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Drexl, Andreas & Kolisch, Rainer, 1991. "Produktionsplanung und -steuerung bei Einzel- und Kleinserienfertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 281, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    2. Anurag Agarwal & Varghese S. Jacob & Hasan Pirkul, 2006. "An Improved Augmented Neural-Network Approach for Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 18(1), pages 119-128, February.
    3. Binzi Xu & Kai Xu & Baolin Fei & Dengchao Huang & Liang Tao & Yan Wang, 2024. "Automatic Design of Energy-Efficient Dispatching Rules for Multi-Objective Dynamic Flexible Job Shop Scheduling Based on Dual Feature Weight Sets," Mathematics, MDPI, vol. 12(10), pages 1-24, May.
    4. Parlakturk, Ali & Kumar, Sunil, 2004. "Self-Interested Routing in Queueing Networks," Research Papers 1782r, Stanford University, Graduate School of Business.
    5. Bierwirth, C. & Kuhpfahl, J., 2017. "Extended GRASP for the job shop scheduling problem with total weighted tardiness objective," European Journal of Operational Research, Elsevier, vol. 261(3), pages 835-848.
    6. Mobin, Mohammadsadegh & Li, Zhaojun & Cheraghi, S. Hossein & Wu, Gongyu, 2019. "An approach for design Verification and Validation planning and optimization for new product reliability improvement," Reliability Engineering and System Safety, Elsevier, vol. 190(C), pages 1-1.
    7. M. Vimala Rani & M. Mathirajan, 2020. "Performance evaluation of due-date based dispatching rules in dynamic scheduling of diffusion furnace," OPSEARCH, Springer;Operational Research Society of India, vol. 57(2), pages 462-512, June.
    8. P Chen & C-C Wu & W-C Lee, 2006. "A bi-criteria two-machine flowshop scheduling problem with a learning effect," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(9), pages 1113-1125, September.
    9. Chauvet, Fabrice & Levner, Eugene & Meyzin, Leonid K. & Proth, Jean-Marie, 2000. "On-line scheduling in a surface treatment system," European Journal of Operational Research, Elsevier, vol. 120(2), pages 382-392, January.
    10. Zoghby, Jeriad & Wesley Barnes, J. & Hasenbein, John J., 2005. "Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches," European Journal of Operational Research, Elsevier, vol. 167(2), pages 336-348, December.
    11. Valls, Vicente & Angeles Perez, M. & Sacramento Quintanilla, M., 1998. "A tabu search approach to machine scheduling," European Journal of Operational Research, Elsevier, vol. 106(2-3), pages 277-300, April.
    12. Alejandra Duenas & Dobrila Petrovic, 2008. "An approach to predictive-reactive scheduling of parallel machines subject to disruptions," Annals of Operations Research, Springer, vol. 159(1), pages 65-82, March.
    13. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    14. Guinet, Alain & Legrand, Marie, 1998. "Reduction of job-shop problems to flow-shop problems with precedence constraints," European Journal of Operational Research, Elsevier, vol. 109(1), pages 96-110, August.
    15. Monaci, Marta & Agasucci, Valerio & Grani, Giorgio, 2024. "An actor-critic algorithm with policy gradients to solve the job shop scheduling problem using deep double recurrent agents," European Journal of Operational Research, Elsevier, vol. 312(3), pages 910-926.
    16. Chen, Haoxun & Luh, Peter B., 2003. "An alternative framework to Lagrangian relaxation approach for job shop scheduling," European Journal of Operational Research, Elsevier, vol. 149(3), pages 499-512, September.
    17. Qingmiao Liao & Jianjun Yang & Yong Zhou, 2019. "Sustainable Scheduling of an Automatic Pallet Changer System by Multi-Objective Evolutionary Algorithm with First Piece Inspection," Sustainability, MDPI, vol. 11(5), pages 1-24, March.
    18. Land, Martin & Gaalman, Gerard, 1996. "Workload control concepts in job shops A critical assessment," International Journal of Production Economics, Elsevier, vol. 46(1), pages 535-548, December.
    19. Drexl, Andreas & Salewski, Frank, 1996. "Distribution Requirements and Compactness Constraints in School Timetabling. Part II: Methods," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 384, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    20. G-C Lee & Y-D Kim & J-G Kim & S-H Choi, 2003. "A dispatching rule-based approach to production scheduling in a printed circuit board manufacturing system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(10), pages 1038-1049, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:nmcmxx:v:13:y:2007:i:3:p:267-290. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/NMCM20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.