IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v20y2002i2p179-192.html
   My bibliography  Save this article

A process approach in measuring quality costs of construction projects: model development

Author

Listed:
  • Raymond Aoieong
  • S. L. Tang
  • Syed Ahmed

Abstract

One of the most effective tools for evaluating the success of a quality management programme is the measurement of quality costs (prevention, appraisal and failure costs). The application of the concept of quality costs originated in the manufacturing industry in the early 1950s. As increasing attention has been given to improving the overall quality in the construction process since the early 1980s, the application of total quality management (TQM) practices in the construction industry has gained much popularity. A systematic approach is needed for measuring quality costs, especially in the construction industry, due to the great number and complexity of activities involved in a typical project. This paper describes how a simple methodology can be used to capture quality costs in construction projects. Pre-existing models for capturing construction quality costs, by Davis, by Abdul-Rahman, by Low and Yeo and by others, recognize quality cost components but do not address the causes or sources of unwanted deviations. This paper proposes an alternative approach, based on the process cost model and in conformance with BS6143 (1992), which is thought to better facilitate the fundamental goal of TQM, i.e. continual process improvement. A number of professionals involved in construction quality management were interviewed and responded favourably to the practicality of the proposed framework in the construction context.

Suggested Citation

  • Raymond Aoieong & S. L. Tang & Syed Ahmed, 2002. "A process approach in measuring quality costs of construction projects: model development," Construction Management and Economics, Taylor & Francis Journals, vol. 20(2), pages 179-192.
  • Handle: RePEc:taf:conmgt:v:20:y:2002:i:2:p:179-192
    DOI: 10.1080/01446190110109157
    as

    Download full text from publisher

    File URL: http://www.tandfonline.com/doi/abs/10.1080/01446190110109157
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446190110109157?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Porter, Leslie J. & Rayner, Paul, 1992. "Quality costing for total quality management," International Journal of Production Economics, Elsevier, vol. 27(1), pages 69-81, April.
    2. Peter Love & Heng Li, 2000. "Quantifying the causes and costs of rework in construction," Construction Management and Economics, Taylor & Francis Journals, vol. 18(4), pages 479-490.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yehiel Rosenfeld, 2009. "Cost of quality versus cost of non-quality in construction: the crucial balance," Construction Management and Economics, Taylor & Francis Journals, vol. 27(2), pages 107-117.
    2. Markus Hoppe & Avner Engel & Shalom Shachar, 2007. "SysTest: Improving the verification, validation, and testing process— Assessing six industrial pilot projects," Systems Engineering, John Wiley & Sons, vol. 10(4), pages 323-347, December.
    3. Rodney Stewart & Clinton Spencer, 2006. "Six-sigma as a strategy for process improvement on construction projects: a case study," Construction Management and Economics, Taylor & Francis Journals, vol. 24(4), pages 339-348.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Hosang Hyun & Hyunsoo Kim & Hyun-Soo Lee & Moonseo Park & Jeonghoon Lee, 2020. "Integrated Design Process for Modular Construction Projects to Reduce Rework," Sustainability, MDPI, vol. 12(2), pages 1-19, January.
    2. Raphael N. Milion & Thaís da C. L. Alves & José Carlos Paliari & Luisa H. B. Liboni, 2021. "CBA-Based Evaluation Method of the Impact of Defects in Residential Buildings: Assessing Risks towards Making Sustainable Decisions on Continuous Improvement Activities," Sustainability, MDPI, vol. 13(12), pages 1-20, June.
    3. Kudrekodlu V. Prasad & Venkatesan Vasugi, 2023. "Readiness Factors for Sustainable Lean Transformation of Construction Organizations," Sustainability, MDPI, vol. 15(8), pages 1-23, April.
    4. Kheira Anissa Tabet Aoul & Rahma Hagi & Rahma Abdelghani & Monaya Syam & Boshra Akhozheya, 2021. "Building Envelope Thermal Defects in Existing and Under-Construction Housing in the UAE; Infrared Thermography Diagnosis and Qualitative Impacts Analysis," Sustainability, MDPI, vol. 13(4), pages 1-23, February.
    5. Fatemeh Mostofi & Vedat Toğan & Yunus Emre Ayözen & Onur Behzat Tokdemir, 2022. "Predicting the Impact of Construction Rework Cost Using an Ensemble Classifier," Sustainability, MDPI, vol. 14(22), pages 1-19, November.
    6. De Toni, A. & Nassimbeni, G. & Tonchia, S., 1995. "An instrument for quality performance measurement," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 199-207, March.
    7. Šepetienė Ramunė & Čiubrinskienė Rasa & Ruževičius Juozas, 2017. "Systemic Improvement of Management: Case Analysis of a Company Evaluating Quality Costs," Management of Organizations: Systematic Research, Sciendo, vol. 77(1), pages 153-167, June.
    8. Quigley, John & Walls, Lesley & Demirel, Güven & MacCarthy, Bart L. & Parsa, Mahdi, 2018. "Supplier quality improvement: The value of information under uncertainty," European Journal of Operational Research, Elsevier, vol. 264(3), pages 932-947.
    9. Othman Ayman Ahmed Ezzat & AlNassar Nooran, 2021. "A framework for achieving sustainability by overcoming the challenges of the construction supply chain during the design process," Organization, Technology and Management in Construction, Sciendo, vol. 13(1), pages 2391-2415, January.
    10. Yuting Qi & Queena K. Qian & Frits M. Meijer & Henk J. Visscher, 2019. "Identification of Quality Failures in Building Energy Renovation Projects in Northern China," Sustainability, MDPI, vol. 11(15), pages 1-23, August.
    11. Hazen, Benjamin T. & Weigel, Fred K. & Ezell, Jeremy D. & Boehmke, Bradley C. & Bradley, Randy V., 2017. "Toward understanding outcomes associated with data quality improvement," International Journal of Production Economics, Elsevier, vol. 193(C), pages 737-747.
    12. PrzemysEaw Niewiadomski & Bogdan Nogalski, 2021. "Quality costs in the companyb," Zeszyty Naukowe Małopolskiej Wyższej Szkoły Ekonomicznej w Tarnowie / The Malopolska School of Economics in Tarnow Research Papers Collection, Malopolska School of Economics in Tarnow, vol. 51(3), pages 87-105, September.
    13. Chantelle Brink & Sangwon Han, 2015. "Application of Social Network Analysis for Analyzing the Relationships between Root and Direct Causes of Defects," Modern Applied Science, Canadian Center of Science and Education, vol. 9(12), pages 1-12, November.
    14. Li, Dong & Nagurney, Anna, 2015. "A general multitiered supply chain network model of quality competition with suppliers," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 336-356.
    15. Roman Trach & Yuliia Trach & Marzena Lendo-Siwicka, 2021. "Using ANN to Predict the Impact of Communication Factors on the Rework Cost in Construction Projects," Energies, MDPI, vol. 14(14), pages 1-15, July.
    16. Alencastro, João & Fuertes, Alba & de Wilde, Pieter, 2018. "The relationship between quality defects and the thermal performance of buildings," Renewable and Sustainable Energy Reviews, Elsevier, vol. 81(P1), pages 883-894.
    17. Yehiel Rosenfeld, 2009. "Cost of quality versus cost of non-quality in construction: the crucial balance," Construction Management and Economics, Taylor & Francis Journals, vol. 27(2), pages 107-117.
    18. Mark Hall & Cyril Tomkins, 2001. "A cost of quality analysis of a building project: towards a complete methodology for design and build," Construction Management and Economics, Taylor & Francis Journals, vol. 19(7), pages 727-740.
    19. Guofeng Ma & Shan Jiang & Tiancheng Zhu & Jianyao Jia, 2019. "A Novel Method of Developing Construction Projects Schedule under Rework Scenarios," Sustainability, MDPI, vol. 11(20), pages 1-25, October.
    20. Shahid Hussain & Wang Xuetong & Talib Hussain, 2020. "Impact of Skilled and Unskilled Labor on Project Performance Using Structural Equation Modeling Approach," SAGE Open, , vol. 10(1), pages 21582440209, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:20:y:2002:i:2:p:179-192. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.