IDEAS home Printed from https://ideas.repec.org/a/spr/topjnl/v3y1995i1p69-95.html
   My bibliography  Save this article

On solving stochastic production planning problems via scenario modelling

Author

Listed:
  • L. Escudero
  • P. Kamesam

Abstract

No abstract is available for this item.

Suggested Citation

  • L. Escudero & P. Kamesam, 1995. "On solving stochastic production planning problems via scenario modelling," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 3(1), pages 69-95, June.
  • Handle: RePEc:spr:topjnl:v:3:y:1995:i:1:p:69-95
    DOI: 10.1007/BF02574804
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1007/BF02574804
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1007/BF02574804?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. M. Alvarez & C. Cuevas & L. Escudero & J. Escudero & C. García & F. Prieto, 1994. "Network planning under uncertainty with an application to hydropower generation," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 2(1), pages 25-58, June.
    2. Gary D. Eppen & R. Kipp Martin & Linus Schrage, 1989. "OR Practice—A Scenario Approach to Capacity Planning," Operations Research, INFORMS, vol. 37(4), pages 517-527, August.
    3. Bitran, G. R. & Sarkar, D., 1988. "On upper bounds of sequential stochastic production planning problems," European Journal of Operational Research, Elsevier, vol. 34(2), pages 191-207, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mula, J. & Poler, R. & Garcia-Sabater, J.P. & Lario, F.C., 2006. "Models for production planning under uncertainty: A review," International Journal of Production Economics, Elsevier, vol. 103(1), pages 271-285, September.
    2. Wilhelm, Wilbert E. & Xu, Kaihong, 2002. "Prescribing product upgrades, prices and production levels over time in a stochastic environment," European Journal of Operational Research, Elsevier, vol. 138(3), pages 601-621, May.
    3. Escudero, L. F. & Galindo, E. & Garcia, G. & Gomez, E. & Sabau, V., 1999. "Schumann, a modeling framework for supply chain management under uncertainty," European Journal of Operational Research, Elsevier, vol. 119(1), pages 14-34, November.
    4. Lusa, Amaia & Corominas, Albert & Muñoz, Norberto, 2008. "A multistage scenario optimisation procedure to plan annualised working hours under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 113(2), pages 957-968, June.
    5. Jing Wu & Dan Zhang & Yang Yang & Gongshu Wang & Lijie Su, 2022. "Multi-Stage Multi-Product Production and Inventory Planning for Cold Rolling under Random Yield," Mathematics, MDPI, vol. 10(4), pages 1-21, February.
    6. Hu, Zhengyang & Hu, Guiping, 2016. "A two-stage stochastic programming model for lot-sizing and scheduling under uncertainty," International Journal of Production Economics, Elsevier, vol. 180(C), pages 198-207.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Elena Katok & William Tarantino & Terry P. Harrison, 2003. "Investment in production resource flexibility: An empirical investigation of methods for planning under uncertainty," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(2), pages 105-129, March.
    2. Francisco Barahona & Stuart Bermon & Oktay Günlük & Sarah Hood, 2005. "Robust capacity planning in semiconductor manufacturing," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 459-468, August.
    3. Sabet, Ehsan & Yazdani, Baback & Kian, Ramez & Galanakis, Kostas, 2020. "A strategic and global manufacturing capacity management optimisation model: A Scenario-based multi-stage stochastic programming approach," Omega, Elsevier, vol. 93(C).
    4. Arbrie Jashari & Victor Tiberius & Marina Dabić, 2022. "Tracing the progress of scenario research in business and management," Futures & Foresight Science, John Wiley & Sons, vol. 4(2), June.
    5. Hongmin Li & Stephen C. Graves & Woonghee Tim Huh, 2014. "Optimal Capacity Conversion for Product Transitions Under High Service Requirements," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 46-60, February.
    6. Jaume Belles‐Sampera & Montserrat Guillén & Miguel Santolino, 2014. "Beyond Value‐at‐Risk: GlueVaR Distortion Risk Measures," Risk Analysis, John Wiley & Sons, vol. 34(1), pages 121-134, January.
    7. Kai Huang & Shabbir Ahmed, 2009. "The Value of Multistage Stochastic Programming in Capacity Planning Under Uncertainty," Operations Research, INFORMS, vol. 57(4), pages 893-904, August.
    8. Zhouchun Huang & Qipeng P. Zheng & Andrew L. Liu, 2022. "A Nested Cross Decomposition Algorithm for Power System Capacity Expansion with Multiscale Uncertainties," INFORMS Journal on Computing, INFORMS, vol. 34(4), pages 1919-1939, July.
    9. Z Degraeve & F Roodhooft & B van Doveren, 2005. "The use of total cost of ownership for strategic procurement: a company-wide management information system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(1), pages 51-59, January.
    10. Bex George Thomas & Srinivas Bollapragada, 2010. "General Electric Uses an Integrated Framework for Product Costing, Demand Forecasting, and Capacity Planning of New Photovoltaic Technology Products," Interfaces, INFORMS, vol. 40(5), pages 353-367, October.
    11. Janne Gustafsson & Ahti Salo, 2005. "Contingent Portfolio Programming for the Management of Risky Projects," Operations Research, INFORMS, vol. 53(6), pages 946-956, December.
    12. Hosseini-Motlagh, Seyyed-Mahdi & Govindan, Kannan & Nematollahi, Mohammadreza & Jokar, Abbas, 2019. "An adjustable bi-level wholesale price contract for coordinating a supply chain under scenario-based stochastic demand," International Journal of Production Economics, Elsevier, vol. 214(C), pages 175-195.
    13. Van-Anh Truong & Robin O. Roundy, 2011. "Multidimensional Approximation Algorithms for Capacity-Expansion Problems," Operations Research, INFORMS, vol. 59(2), pages 313-327, April.
    14. Mojtaba Farrokh & Ehsan Ahmadi & Minghe Sun, 2023. "A robust stochastic possibilistic programming model for dynamic supply chain network design with pricing and technology selection decisions," OPSEARCH, Springer;Operational Research Society of India, vol. 60(3), pages 1082-1120, September.
    15. S Mudchanatongsuk & F Ordóñez & J Liu, 2008. "Robust solutions for network design under transportation cost and demand uncertainty," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(5), pages 652-662, May.
    16. Song, Sangcheol, 2021. "When do multinational corporations adjust production volume flexibly among in-network subsidiaries?," Journal of Business Research, Elsevier, vol. 135(C), pages 532-542.
    17. Shabbir Ahmed & Nikolaos V. Sahinidis, 2003. "An Approximation Scheme for Stochastic Integer Programs Arising in Capacity Expansion," Operations Research, INFORMS, vol. 51(3), pages 461-471, June.
    18. C A Poojari & C Lucas & G Mitra, 2008. "Robust solutions and risk measures for a supply chain planning problem under uncertainty," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(1), pages 2-12, January.
    19. Escudero, L. F. & Galindo, E. & Garcia, G. & Gomez, E. & Sabau, V., 1999. "Schumann, a modeling framework for supply chain management under uncertainty," European Journal of Operational Research, Elsevier, vol. 119(1), pages 14-34, November.
    20. Metin Çakanyıldırım & Robin O. Roundy & Samuel C. Wood, 2004. "Optimal machine capacity expansions with nested limitations under stochastic demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 51(2), pages 217-241, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:topjnl:v:3:y:1995:i:1:p:69-95. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.