IDEAS home Printed from https://ideas.repec.org/a/spr/opsear/v54y2017i1d10.1007_s12597-016-0267-4.html
   My bibliography  Save this article

Optimal inventory modeling of supply chain system involving quality inspection errors and fuzzy defective rate

Author

Listed:
  • S. Priyan

    (Mepco Schlenk Engineering College)

  • P. Manivannan

    (Mepco Schlenk Engineering College)

Abstract

In this paper an integrated vendor–buyer supply chain model is designed for a defective inventory product. We provide a simple mathematical model for determining an optimal vendor–buyer inventory policy by accounting for fuzzy defective rate and quality inspection errors at the buyer’s end. In this study we fuzzify the defective rate to the triangular fuzzy number in the expected total cost of the entire supply chain. We then used the signed distance method to defuzzify the fuzzy total cost of the system and a methodology has been proposed to minimize this cost. We frame an iterative algorithm procedure to achieve the optimal solution of delivery lot-size, the total number of deliveries from the vendor to the buyer in one production batch, and it has been illustrated by way of a numerical example. Also sensitivity analysis are given to demonstrate the performance of the proposed methodology. Our results indicate that the optimal solutions of the fuzzy case slightly fluctuate from the solutions of the crisp case.

Suggested Citation

  • S. Priyan & P. Manivannan, 2017. "Optimal inventory modeling of supply chain system involving quality inspection errors and fuzzy defective rate," OPSEARCH, Springer;Operational Research Society of India, vol. 54(1), pages 21-43, March.
  • Handle: RePEc:spr:opsear:v:54:y:2017:i:1:d:10.1007_s12597-016-0267-4
    DOI: 10.1007/s12597-016-0267-4
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s12597-016-0267-4
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s12597-016-0267-4?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Yao, Jing-Shing & Chiang, Jershan, 2003. "Inventory without backorder with fuzzy total cost and fuzzy storing cost defuzzified by centroid and signed distance," European Journal of Operational Research, Elsevier, vol. 148(2), pages 401-409, July.
    2. Salameh, M. K. & Jaber, M. Y., 2000. "Economic production quantity model for items with imperfect quality," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 59-64, March.
    3. Maddah, Bacel & Jaber, Mohamad Y., 2008. "Economic order quantity for items with imperfect quality: Revisited," International Journal of Production Economics, Elsevier, vol. 112(2), pages 808-815, April.
    4. Wee, Hui Ming & Widyadana, Gede Agus, 2013. "A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule," Omega, Elsevier, vol. 41(6), pages 941-954.
    5. Goyal, Suresh Kumar & Cardenas-Barron, Leopoldo Eduardo, 2002. "Note on: Economic production quantity model for items with imperfect quality - a practical approach," International Journal of Production Economics, Elsevier, vol. 77(1), pages 85-87, May.
    6. Berthaut, F. & Gharbi, A. & Dhouib, K., 2011. "Joint modified block replacement and production/inventory control policy for a failure-prone manufacturing cell," Omega, Elsevier, vol. 39(6), pages 642-654, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Muhammad Tayyab & Biswajit Sarkar & Misbah Ullah, 2018. "Sustainable Lot Size in a Multistage Lean-Green Manufacturing Process under Uncertainty," Mathematics, MDPI, vol. 7(1), pages 1-18, December.
    2. Makoena Sebatjane & Olufemi Adetunji, 2022. "Optimal inventory replenishment and shipment policies in a three-echelon supply chain for growing items with expiration dates," OPSEARCH, Springer;Operational Research Society of India, vol. 59(3), pages 809-838, September.
    3. Uoseph Hamdi Salemi & Esmaile Khorram & Yuancheng Si & Saralees Nadarajah, 2020. "Sensitivity analysis of censoring schemes in progressively type-II right censored order statistics," OPSEARCH, Springer;Operational Research Society of India, vol. 57(1), pages 163-189, March.
    4. Sudipta Sinha & Nikunja Mohan Modak & Shib Sankar Sana, 2020. "An entropic order quantity inventory model for quality assessment considering price sensitive demand," OPSEARCH, Springer;Operational Research Society of India, vol. 57(1), pages 88-103, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Harun Öztürk, 2019. "Modeling an inventory problem with random supply, inspection and machine breakdown," OPSEARCH, Springer;Operational Research Society of India, vol. 56(2), pages 497-527, June.
    2. Hauck, Zsuzsanna & Vörös, József, 2015. "Lot sizing in case of defective items with investments to increase the speed of quality control," Omega, Elsevier, vol. 52(C), pages 180-189.
    3. Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
    4. Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
    5. Nasr, Walid W. & Maddah, Bacel & Salameh, Moueen K., 2013. "EOQ with a correlated binomial supply," International Journal of Production Economics, Elsevier, vol. 144(1), pages 248-255.
    6. Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
    7. Anuraag Gutgutia & J. K. Jha, 2018. "A closed-form solution for the distribution free continuous review integrated inventory model," Operational Research, Springer, vol. 18(1), pages 159-186, April.
    8. Leopoldo Eduardo Cárdenas-Barrón & María José Lea Plaza-Makowsky & María Alejandra Sevilla-Roca & José María Núñez-Baumert & Buddhadev Mandal, 2021. "An Inventory Model for Imperfect Quality Products with Rework, Distinct Holding Costs, and Nonlinear Demand Dependent on Price," Mathematics, MDPI, vol. 9(12), pages 1-20, June.
    9. Kevin Hsu, Wen-Kai & Yu, Hong-Fwu, 2009. "EOQ model for imperfective items under a one-time-only discount," Omega, Elsevier, vol. 37(5), pages 1018-1026, October.
    10. Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
    11. Sraboni Mandal & Danish Ali Khan, 2015. "Integrated inventory model with uniform demand for one vendor one customer," International Journal of Business Performance and Supply Chain Modelling, Inderscience Enterprises Ltd, vol. 7(1), pages 36-52.
    12. Maddah, Bacel & Moussawi, Lama & Jaber, Mohamad Y., 2010. "Lot sizing with a Markov production process and imperfect items scrapped," International Journal of Production Economics, Elsevier, vol. 124(2), pages 340-347, April.
    13. Nasr, Walid W. & Jaber, Mohamad Y., 2019. "Supplier development in a two-level lot sizing problem with non-conforming items and learning," International Journal of Production Economics, Elsevier, vol. 216(C), pages 349-363.
    14. Sebatjane, Makoena & Adetunji, Olufemi, 2019. "Economic order quantity model for growing items with imperfect quality," Operations Research Perspectives, Elsevier, vol. 6(C).
    15. Rezaei, Jafar & Salimi, Negin, 2012. "Economic order quantity and purchasing price for items with imperfect quality when inspection shifts from buyer to supplier," International Journal of Production Economics, Elsevier, vol. 137(1), pages 11-18.
    16. Yassine, Ali & Maddah, Bacel & Salameh, Moueen, 2012. "Disaggregation and consolidation of imperfect quality shipments in an extended EPQ model," International Journal of Production Economics, Elsevier, vol. 135(1), pages 345-352.
    17. Khan, M. & Jaber, M.Y. & Wahab, M.I.M., 2010. "Economic order quantity model for items with imperfect quality with learning in inspection," International Journal of Production Economics, Elsevier, vol. 124(1), pages 87-96, March.
    18. Jaber, Mohamad Y. & Zanoni, Simone & Zavanella, Lucio E., 2014. "Economic order quantity models for imperfect items with buy and repair options," International Journal of Production Economics, Elsevier, vol. 155(C), pages 126-131.
    19. Mehmood Khan & Matloub Hussain & Leopoldo Eduardo Cárdenas-Barrón, 2017. "Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4816-4832, August.
    20. Sana, Shib Sankar, 2010. "An economic production lot size model in an imperfect production system," European Journal of Operational Research, Elsevier, vol. 201(1), pages 158-170, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:opsear:v:54:y:2017:i:1:d:10.1007_s12597-016-0267-4. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.