Hierarchical Stochastic Production Planning with Delay Interaction
Author
Abstract
Suggested Citation
DOI: 10.1023/A:1004645827172
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Robert L. Schmidt, 1996. "A Stochastic Optimization Model to Improve Production Planning and R&D Resource Allocation in Biopharmaceutical Production Processes," Management Science, INFORMS, vol. 42(4), pages 603-617, April.
- Gabriel R. Bitran & Elizabeth A. Haas & Arnoldo C. Hax, 1981. "Hierarchical Production Planning: A Single Stage System," Operations Research, INFORMS, vol. 29(4), pages 717-743, August.
- Gabriel R. Bitran & Thin-Yin Leong, 1992. "Deterministic Approximations to Co-Production Problems with Service Constraints and Random Yields," Management Science, INFORMS, vol. 38(5), pages 724-742, May.
- Y. Bassok & R. Akella, 1991. "Ordering and Production Decisions with Supply Quality and Demand Uncertainty," Management Science, INFORMS, vol. 37(12), pages 1556-1574, December.
- Julia L. Higle & Wing W. Lowe & Ronald Odio, 1994. "Conditional Stochastic Decomposition: An Algorithmic Interface for Optimization and Simulation," Operations Research, INFORMS, vol. 42(2), pages 311-322, April.
- John M. Mulvey & Andrzej Ruszczyński, 1995. "A New Scenario Decomposition Method for Large-Scale Stochastic Optimization," Operations Research, INFORMS, vol. 43(3), pages 477-490, June.
- Frank W. Ciarallo & Ramakrishna Akella & Thomas E. Morton, 1994. "A Periodic Review, Production Planning Model with Uncertain Capacity and Uncertain Demand---Optimality of Extended Myopic Policies," Management Science, INFORMS, vol. 40(3), pages 320-332, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Y. Boulaksil & J. C. Fransoo & T. Tan, 2017. "Capacity reservation and utilization for a manufacturer with uncertain capacity and demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(3), pages 689-709, July.
- Protopappa-Sieke, Margarita & Seifert, Ralf W., 2010. "Interrelating operational and financial performance measurements in inventory control," European Journal of Operational Research, Elsevier, vol. 204(3), pages 439-448, August.
- Helga Meier & Nicos Christofides & Gerry Salkin, 2001. "Capital Budgeting Under Uncertainty---An Integrated Approach Using Contingent Claims Analysis and Integer Programming," Operations Research, INFORMS, vol. 49(2), pages 196-206, April.
- Yan, Xiaoming & Zhang, Minghui & Liu, Ke, 2010. "A note on coordination in decentralized assembly systems with uncertain component yields," European Journal of Operational Research, Elsevier, vol. 205(2), pages 469-478, September.
- Gahm, Christian & Uzunoglu, Aykut & Wahl, Stefan & Ganschinietz, Chantal & Tuma, Axel, 2022. "Applying machine learning for the anticipation of complex nesting solutions in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 296(3), pages 819-836.
- Jing Wu & Lijie Su & Gongshu Wang & Yang Yang, 2024. "Approximated Dynamic Programming for Production and Inventory Planning Problem in Cold Rolling Process of Steel Production," Mathematics, MDPI, vol. 12(24), pages 1-17, December.
- Kutzner, Sarah C. & Kiesmüller, Gudrun P., 2013. "Optimal control of an inventory-production system with state-dependent random yield," European Journal of Operational Research, Elsevier, vol. 227(3), pages 444-452.
- István Deák, 2011. "Testing successive regression approximations by large-scale two-stage problems," Annals of Operations Research, Springer, vol. 186(1), pages 83-99, June.
- Gullu, Refik, 1998. "Base stock policies for production/inventory problems with uncertain capacity levels," European Journal of Operational Research, Elsevier, vol. 105(1), pages 43-51, February.
- Deishin Lee, 2012. "Turning Waste into By-Product," Manufacturing & Service Operations Management, INFORMS, vol. 14(1), pages 115-127, January.
- V.I. Norkin & G.C. Pflug & A. Ruszczynski, 1996. "A Branch and Bound Method for Stochastic Global Optimization," Working Papers wp96065, International Institute for Applied Systems Analysis.
- Golenko-Ginzburg, Dimitri & Sinuany-Stern, Zilla & Kats, Vladimir, 1996. "A multilevel decision-making system with multiple resources for controlling cotton harvesting," International Journal of Production Economics, Elsevier, vol. 46(1), pages 55-63, December.
- Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
- Maher, Stephen J., 2021. "Implementing the branch-and-cut approach for a general purpose Benders’ decomposition framework," European Journal of Operational Research, Elsevier, vol. 290(2), pages 479-498.
- Serel, Doğan A., 2017. "A single-period stocking and pricing problem involving stochastic emergency supply," International Journal of Production Economics, Elsevier, vol. 185(C), pages 180-195.
- Jeff Linderoth & Alexander Shapiro & Stephen Wright, 2006. "The empirical behavior of sampling methods for stochastic programming," Annals of Operations Research, Springer, vol. 142(1), pages 215-241, February.
- Hongmin Li & Stephen C. Graves & Woonghee Tim Huh, 2014. "Optimal Capacity Conversion for Product Transitions Under High Service Requirements," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 46-60, February.
- Gel, Esma S. & Salman, F. Sibel, 2022. "Dynamic ordering decisions with approximate learning of supply yield uncertainty," International Journal of Production Economics, Elsevier, vol. 243(C).
- Jian Yang & Zhaoqiong Qin, 2007. "Capacitated Production Control with Virtual Lateral Transshipments," Operations Research, INFORMS, vol. 55(6), pages 1104-1119, December.
- Jakšič, M. & Fransoo, J.C., 2018. "Dual sourcing in the age of near-shoring: Trading off stochastic capacity limitations and long lead times," European Journal of Operational Research, Elsevier, vol. 267(1), pages 150-161.
More about this item
Keywords
flexible automated workshops; flexible manufacturing systems; hierarchical stochastic production planning; stochastic interaction/prediction method;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:joptap:v:104:y:2000:i:3:d:10.1023_a:1004645827172. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.