IDEAS home Printed from https://ideas.repec.org/a/spr/jcomop/v38y2019i4d10.1007_s10878-019-00442-w.html
   My bibliography  Save this article

On the approximability of the two-phase knapsack problem

Author

Listed:
  • Kameng Nip

    (Sun Yat-sen University)

  • Zhenbo Wang

    (Tsinghua University)

Abstract

We consider a natural generalization of the knapsack problem and the multiple knapsack problem, which has two phases of packing decisions. In this problem, we have a set of items, several small knapsacks called boxes, and a large knapsack called container. Each item has a size and profit, each box has a size and the container has a capacity. The first phase is to select some items to pack into the boxes, and the second phase is to select the boxes (each includes some packed items) to pack into the container. The total profit of the problem is determined by the items that are selected and packed into the container within some packed box, and the objective is to maximize the total profit. This problem is motivated by various practical applications, e.g., in logistics. It is a generalization of the multiple knapsack problem, and hence is strongly NP-hard. We mainly propose three approximation algorithms for it. Particularly, the first one is a $$\frac{1}{4}$$ 1 4 -approximation algorithm based on its linear programming relaxation; the second one is based on applying the algorithms for the multiple knapsack problem and the knapsack problem, and has an approximation ratio $$\frac{1}{3} - \epsilon $$ 1 3 - ϵ for any small enough $$\epsilon >0$$ ϵ > 0 . We finally provide a polynomial time approximation scheme for this problem.

Suggested Citation

  • Kameng Nip & Zhenbo Wang, 2019. "On the approximability of the two-phase knapsack problem," Journal of Combinatorial Optimization, Springer, vol. 38(4), pages 1155-1179, November.
  • Handle: RePEc:spr:jcomop:v:38:y:2019:i:4:d:10.1007_s10878-019-00442-w
    DOI: 10.1007/s10878-019-00442-w
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10878-019-00442-w
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10878-019-00442-w?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bruce H. Faaland, 1981. "Technical Note—The Multiperiod Knapsack Problem," Operations Research, INFORMS, vol. 29(3), pages 612-616, June.
    2. Dudzinski, Krzysztof & Walukiewicz, Stanislaw, 1987. "Exact methods for the knapsack problem and its generalizations," European Journal of Operational Research, Elsevier, vol. 28(1), pages 3-21, January.
    3. Lisa Fleischer & Michel X. Goemans & Vahab S. Mirrokni & Maxim Sviridenko, 2011. "Tight Approximation Algorithms for Maximum Separable Assignment Problems," Mathematics of Operations Research, INFORMS, vol. 36(3), pages 416-431, August.
    4. Johnston, Robert E. & Khan, Lutfar R., 1995. "Bounds for nested knapsack problems," European Journal of Operational Research, Elsevier, vol. 81(1), pages 154-165, February.
    5. Eugene L. Lawler, 1979. "Fast Approximation Algorithms for Knapsack Problems," Mathematics of Operations Research, INFORMS, vol. 4(4), pages 339-356, November.
    6. A. M. A. Hariri & C. N. Potts & L. N. Van Wassenhove, 1995. "Single Machine Scheduling to Minimize Total Weighted Late Work," INFORMS Journal on Computing, INFORMS, vol. 7(2), pages 232-242, May.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Malgorzata Sterna & Kateryna Czerniachowska, 2017. "Polynomial Time Approximation Scheme for Two Parallel Machines Scheduling with a Common Due Date to Maximize Early Work," Journal of Optimization Theory and Applications, Springer, vol. 174(3), pages 927-944, September.
    2. Yuan Zhang & Jinjiang Yuan, 2019. "A note on a two-agent scheduling problem related to the total weighted late work," Journal of Combinatorial Optimization, Springer, vol. 37(3), pages 989-999, April.
    3. Yunqiang Yin & Jianyou Xu & T. C. E. Cheng & Chin‐Chia Wu & Du‐Juan Wang, 2016. "Approximation schemes for single‐machine scheduling with a fixed maintenance activity to minimize the total amount of late work," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(2), pages 172-183, March.
    4. Chung‐Yee Lee & Zhi‐Long Chen, 2000. "Scheduling jobs and maintenance activities on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(2), pages 145-165, March.
    5. Ruyan He & Jinjiang Yuan, 2020. "Two-Agent Preemptive Pareto-Scheduling to Minimize Late Work and Other Criteria," Mathematics, MDPI, vol. 8(9), pages 1-18, September.
    6. Edward Y H Lin & Chung-Min Wu, 2004. "The multiple-choice multi-period knapsack problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(2), pages 187-197, February.
    7. Sterna, Małgorzata, 2021. "Late and early work scheduling: A survey," Omega, Elsevier, vol. 104(C).
    8. Ruyan He & Jinjiang Yuan & C. T. Ng & T. C. E. Cheng, 2021. "Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work," Journal of Combinatorial Optimization, Springer, vol. 41(2), pages 504-525, February.
    9. Shi-Sheng Li & Jin-Jiang Yuan, 2020. "Single-machine scheduling with multi-agents to minimize total weighted late work," Journal of Scheduling, Springer, vol. 23(4), pages 497-512, August.
    10. J. M. van den Akker & J. A. Hoogeveen & S. L. van de Velde, 1999. "Parallel Machine Scheduling by Column Generation," Operations Research, INFORMS, vol. 47(6), pages 862-872, December.
    11. Dvir Shabtay, 2023. "A new perspective on single-machine scheduling problems with late work related criteria," Annals of Operations Research, Springer, vol. 322(2), pages 947-966, March.
    12. Gasparini, Gaia & Brunelli, Matteo & Chiriac, Marius Dan, 2022. "Multi-period portfolio decision analysis: A case study in the infrastructure management sector," Operations Research Perspectives, Elsevier, vol. 9(C).
    13. Sang, Yao-Wen & Wang, Jun-Qiang & Sterna, Małgorzata & Błażewicz, Jacek, 2023. "Single machine scheduling with due date assignment to minimize the total weighted lead time penalty and late work," Omega, Elsevier, vol. 121(C).
    14. Shabtay, Dvir & Mosheiov, Gur & Oron, Daniel, 2022. "Single machine scheduling with common assignable due date/due window to minimize total weighted early and late work," European Journal of Operational Research, Elsevier, vol. 303(1), pages 66-77.
    15. Mosheiov, Gur & Oron, Daniel & Shabtay, Dvir, 2021. "Minimizing total late work on a single machine with generalized due-dates," European Journal of Operational Research, Elsevier, vol. 293(3), pages 837-846.
    16. Zhang, Xingong, 2021. "Two competitive agents to minimize the weighted total late work and the total completion time," Applied Mathematics and Computation, Elsevier, vol. 406(C).
    17. Yuan Zhang & Zhichao Geng & Jinjiang Yuan, 2020. "Two-Agent Pareto-Scheduling of Minimizing Total Weighted Completion Time and Total Weighted Late Work," Mathematics, MDPI, vol. 8(11), pages 1-17, November.
    18. Gerhard J. Woeginger, 2000. "When Does a Dynamic Programming Formulation Guarantee the Existence of a Fully Polynomial Time Approximation Scheme (FPTAS)?," INFORMS Journal on Computing, INFORMS, vol. 12(1), pages 57-74, February.
    19. Chen, Rubing & Geng, Zhichao & Lu, Lingfa & Yuan, Jinjiang & Zhang, Yuan, 2022. "Pareto-scheduling of two competing agents with their own equal processing times," European Journal of Operational Research, Elsevier, vol. 301(2), pages 414-431.
    20. Chen, Xin & Liang, Yage & Sterna, Małgorzata & Wang, Wen & Błażewicz, Jacek, 2020. "Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date," European Journal of Operational Research, Elsevier, vol. 284(1), pages 67-74.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:jcomop:v:38:y:2019:i:4:d:10.1007_s10878-019-00442-w. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.