IDEAS home Printed from https://ideas.repec.org/a/spr/ijsaem/v14y2023i1d10.1007_s13198-021-01097-9.html
   My bibliography  Save this article

Performability and maintenance decisions for coal ash handling system of a subcritical thermal power plant

Author

Listed:
  • Subhash Malik

    (NIT Kurukshetra
    MMDU)

  • P. C. Tewari

    (NIT Kurukshetra)

Abstract

The current paper reveals the performability and maintenance decisions for the Coal Ash Handling System (CAHS) of a subcritical Thermal Power Plant (TPP). This system comprises of five subsystems i.e. Furnace, Electro Static Precipitator (ESP), Vessel, Compressor Transportation Line (CTL) and Ash Silo. Transition diagram was formulated on the basis of probabilistic approach for various subsystems. Performability model was developed through the summation of state probabilities by using the normalizing condition. Performability matrices were obtained by the numerous actions of repair and failure rates for all five subsystems. The performance for all five subsystems was estimated in the form of availability given in performability matrices. The maintenance decisions of various subsystems for CAHS are specified with the help of repair rate. It is clearly predicited from this study that ESP is most critical and ash silo is a least critical subsystem. ESP will be held on uppermost position and ash silo on lowermost position, whenever compelling the maintenance priority. The implementation of both performability and maintenance decisions by the administration of a subcritical TPP will lead to improve the system performability and reduce the total maintenance cost.

Suggested Citation

  • Subhash Malik & P. C. Tewari, 2023. "Performability and maintenance decisions for coal ash handling system of a subcritical thermal power plant," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 45-54, February.
  • Handle: RePEc:spr:ijsaem:v:14:y:2023:i:1:d:10.1007_s13198-021-01097-9
    DOI: 10.1007/s13198-021-01097-9
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s13198-021-01097-9
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s13198-021-01097-9?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Savita Garg & Jai Singh & D.V. Singh, 2010. "Availability and maintenance scheduling of a repairable block-board manufacturing system," International Journal of Reliability and Safety, Inderscience Enterprises Ltd, vol. 4(1), pages 104-118.
    2. Monika Gahlot & V.V. Singh & Hamisu Ismial Ayagi & C.K. Goel, 2018. "Performance assessment of repairable system in series configuration under different types of failure and repair policies using copula linguistics," International Journal of Reliability and Safety, Inderscience Enterprises Ltd, vol. 12(4), pages 348-363.
    3. Amit Kumar & Vinod Kumar & Vikas Modgil, 2018. "Performance optimisation for ethanol manufacturing system of distillery plant using particle swarm optimisation algorithm," International Journal of Intelligent Enterprise, Inderscience Enterprises Ltd, vol. 5(4), pages 345-364.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Parveen Kumari & Mukender Singh Kadyan & Jitender Kumar, 2019. "Profit analysis of butter-oil (ghee) producing system of milk plant using supplementary variable technique," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(6), pages 1627-1638, December.
    2. Deepak Sinwar & Monika Saini & Dilbag Singh & Drishty Goyal & Ashish Kumar, 2021. "Availability and performance optimization of physical processing unit in sewage treatment plant using genetic algorithm and particle swarm optimization," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 12(6), pages 1235-1246, December.
    3. Muhammad Idris Abubakar & Vijay Vir Singh, 2019. "Performance assessment of industrial system (African Textile Manufacturers, LTD) through copula linguistic approach," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 29(4), pages 5-22.
    4. M. S. Kadyan & Ramesh Kumar, 2017. "Availability based operational behavior of B-Pan crystallization system in the sugar industry," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1450-1460, November.
    5. Praveen Kumar Poonia, 2024. "Exact reliability formula for precision agriculture through copula repair approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 15(8), pages 3725-3736, August.
    6. Wang, Naichao & Li, Mingyuan & Xiao, Boping & Ma, Lin, 2019. "Availability analysis of a general time distribution system with the consideration of maintenance and spares," Reliability Engineering and System Safety, Elsevier, vol. 192(C).
    7. M. S. Kadyan & Ramesh Kumar, 2017. "Availability and profit analysis of a feeding system in sugar industry," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 301-316, January.
    8. Ajay Kumar & Reena Garg & M. S. Barak, 2023. "Reliability measures of a cold standby system subject to refreshment," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 14(1), pages 147-155, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ijsaem:v:14:y:2023:i:1:d:10.1007_s13198-021-01097-9. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.