IDEAS home Printed from https://ideas.repec.org/a/spr/flsman/v31y2019i2d10.1007_s10696-018-9310-5.html
   My bibliography  Save this article

Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)

Author

Listed:
  • K. C. Bhosale

    (Savitribai Phule Pune University)

  • P. J. Pawar

    (Savitribai Phule Pune University)

Abstract

In a loading problem of flexible manufacturing system (FMS), part type selection and operations allocation are two critical problems. The total completion time of a product for the selected process plan in the system can be minimum for the loading problem. But, in a real time scheduling system, this process plan may not be optimum because of consideration of waiting time of product and machine. So, the total completion time and thereby the material flow of the selected process plan in the FMS may be high. Due to this problem an integrated approach of part type selection and an operation allocation problem i.e. production planning problem and scheduling problem is considered to optimise material flow in FMS. Loading and scheduling problems are NP-hard in nature. So, to solve complex problems like this, real coded genetic algorithm (RCGA) is used which overcomes some limitations of genetic algorithm. It is observed that, the results of optimisation using RCGA outperforms those obtained by earlier researchers.

Suggested Citation

  • K. C. Bhosale & P. J. Pawar, 2019. "Material flow optimisation of production planning and scheduling problem in flexible manufacturing system by real coded genetic algorithm (RCGA)," Flexible Services and Manufacturing Journal, Springer, vol. 31(2), pages 381-423, June.
  • Handle: RePEc:spr:flsman:v:31:y:2019:i:2:d:10.1007_s10696-018-9310-5
    DOI: 10.1007/s10696-018-9310-5
    as

    Download full text from publisher

    File URL: http://link.springer.com/10.1007/s10696-018-9310-5
    File Function: Abstract
    Download Restriction: Access to the full text of the articles in this series is restricted.

    File URL: https://libkey.io/10.1007/s10696-018-9310-5?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
    2. Sujono, Sienny & Lashkari, R.S., 2007. "A multi-objective model of operation allocation and material handling system selection in FMS design," International Journal of Production Economics, Elsevier, vol. 105(1), pages 116-133, January.
    3. Christoph Schmidt, 2016. "Agile Software Development," Progress in IS, in: Agile Software Development Teams, chapter 0, pages 7-35, Springer.
    4. Khayat, Ghada El & Langevin, Andre & Riopel, Diane, 2006. "Integrated production and material handling scheduling using mathematical programming and constraint programming," European Journal of Operational Research, Elsevier, vol. 175(3), pages 1818-1832, December.
    5. Carlos Paternina-Arboleda & Jairo Montoya-Torres & Milton Acero-Dominguez & Maria Herrera-Hernandez, 2008. "Scheduling jobs on a k-stage flexible flow-shop," Annals of Operations Research, Springer, vol. 164(1), pages 29-40, November.
    6. Stecke, Kathryn E., 1986. "A hierarchical approach to solving machine grouping and loading problems of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 24(3), pages 369-378, March.
    7. Varadharajan, T.K. & Rajendran, Chandrasekharan, 2005. "A multi-objective simulated-annealing algorithm for scheduling in flowshops to minimize the makespan and total flowtime of jobs," European Journal of Operational Research, Elsevier, vol. 167(3), pages 772-795, December.
    8. Chengbin Chu & Marie‐Claude Portmann, 1993. "Job‐shop scheduling to minimize total waiting time," Applied Stochastic Models and Data Analysis, John Wiley & Sons, vol. 9(2), pages 177-185, June.
    9. Stecke, Kathryn E. & Morin, Thomas L., 1985. "The optimality of balancing workloads in certain types of flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 20(1), pages 68-82, April.
    10. Kumar, Akhilesh & Prakash & Tiwari, M.K. & Shankar, Ravi & Baveja, Alok, 2006. "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1043-1069, December.
    11. Ronconi, Débora P. & Henriques, Luís R.S., 2009. "Some heuristic algorithms for total tardiness minimization in a flowshop with blocking," Omega, Elsevier, vol. 37(2), pages 272-281, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Andrea Maria Zanchettin, 2022. "Robust scheduling and dispatching rules for high-mix collaborative manufacturing systems," Flexible Services and Manufacturing Journal, Springer, vol. 34(2), pages 293-316, June.
    2. Panagiotis D. Paraschos & Georgios K. Koulinas & Dimitrios E. Koulouriotis, 2024. "A reinforcement learning/ad-hoc planning and scheduling mechanism for flexible and sustainable manufacturing systems," Flexible Services and Manufacturing Journal, Springer, vol. 36(3), pages 714-736, September.
    3. Davide Mezzogori & Giovanni Romagnoli & Francesco Zammori, 2021. "Defining accurate delivery dates in make to order job-shops managed by workload control," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 956-991, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Koltai, Tamas & Lozano, Sebastian, 1998. "Sensitivity calculation of the throughput of an FMS with respect to the routing mix using perturbation analysis," European Journal of Operational Research, Elsevier, vol. 105(3), pages 483-493, March.
    2. Mohamed, Zubair M., 1996. "A flexible approach to (re)configure Flexible Manufacturing Cells," European Journal of Operational Research, Elsevier, vol. 95(3), pages 566-576, December.
    3. Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
    4. Bennett, Derek P. & Yano, Candace A., 2004. "A decomposition approach for an equipment selection and multiple product routing problem incorporating environmental factors," European Journal of Operational Research, Elsevier, vol. 156(3), pages 643-664, August.
    5. Suman Gothwal & Tilak Raj, 2017. "Analyzing the factors affecting the flexibility in FMS using weighted interpretive structural modeling (WISM) approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 408-422, June.
    6. Yumin He & Kathryn E. Stecke & Milton L. Smith, 2016. "Robot and machine scheduling with state-dependent part input sequencing in flexible manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 54(22), pages 6736-6746, November.
    7. J. Smith, 2015. "Optimal workload allocation in closed queueing networks with state dependent queues," Annals of Operations Research, Springer, vol. 231(1), pages 157-183, August.
    8. Pokharel, Shaligram, 2008. "A two objective model for decision making in a supply chain," International Journal of Production Economics, Elsevier, vol. 111(2), pages 378-388, February.
    9. David D. Yao & Sung Chul Kim, 1987. "Some order relations in closed networks of queues with multiserver stations," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(1), pages 53-66, February.
    10. Gupta, Manjul & George, Joey F. & Xia, Weidong, 2019. "Relationships between IT department culture and agile software development practices: An empirical investigation," International Journal of Information Management, Elsevier, vol. 44(C), pages 13-24.
    11. Kumar, Akhilesh & Prakash & Tiwari, M.K. & Shankar, Ravi & Baveja, Alok, 2006. "Solving machine-loading problem of a flexible manufacturing system with constraint-based genetic algorithm," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1043-1069, December.
    12. Nouha Nouri & Talel Ladhari, 2018. "Evolutionary multiobjective optimization for the multi-machine flow shop scheduling problem under blocking," Annals of Operations Research, Springer, vol. 267(1), pages 413-430, August.
    13. Mohamed, Zubair M. & Kumar, Ashok & Motwani, Jaideep, 1999. "An improved part grouping model for minimizing makespan in FMS," European Journal of Operational Research, Elsevier, vol. 116(1), pages 171-182, July.
    14. Lemos, R.F. & Ronconi, D.P., 2015. "Heuristics for the stochastic single-machine problem with E/T costs," International Journal of Production Economics, Elsevier, vol. 168(C), pages 131-142.
    15. Delorme, Xavier & Dolgui, Alexandre & Kovalyov, Mikhail Y., 2012. "Combinatorial design of a minimum cost transfer line," Omega, Elsevier, vol. 40(1), pages 31-41, January.
    16. Berghman, Lotte & Leus, Roel, 2015. "Practical solutions for a dock assignment problem with trailer transportation," European Journal of Operational Research, Elsevier, vol. 246(3), pages 787-799.
    17. Florin DUMITRIU & Gabriela MESNITA & Laura Diana RADU, 2019. "Challenges and Solutions of Applying Large-Scale Agile at Organization-al Level," Informatica Economica, Academy of Economic Studies - Bucharest, Romania, vol. 23(3), pages 61-71.
    18. Berea Cristi, 2018. "Negotiation Analysis. The Context," Ovidius University Annals, Economic Sciences Series, Ovidius University of Constantza, Faculty of Economic Sciences, vol. 0(1), pages 284-288, July.
    19. Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
    20. C. J. Torrecilla-Salinas & O. Troyer & M. J. Escalona & M. Mejías, 2019. "A Delphi-based expert judgment method applied to the validation of a mature Agile framework for Web development projects," Information Technology and Management, Springer, vol. 20(1), pages 9-40, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:flsman:v:31:y:2019:i:2:d:10.1007_s10696-018-9310-5. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.