A GRASP based on DE to solve single machine scheduling problem with SDST
Author
Abstract
Suggested Citation
DOI: 10.1007/s10589-010-9333-7
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Tan, Keah-Choon & Narasimhan, Ram & Rubin, Paul A. & Ragatz, Gary L., 2000. "A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times," Omega, Elsevier, vol. 28(3), pages 313-326, June.
- Hansen, Pierre & Mladenovic, Nenad, 2001. "Variable neighborhood search: Principles and applications," European Journal of Operational Research, Elsevier, vol. 130(3), pages 449-467, May.
- C Gagné & M Gravel & W L Price, 2005. "Using metaheuristic compromise programming for the solution of multiple-objective scheduling problems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(6), pages 687-698, June.
- Choobineh, F. Fred & Mohebbi, Esmail & Khoo, Hansen, 2006. "A multi-objective tabu search for a single-machine scheduling problem with sequence-dependent setup times," European Journal of Operational Research, Elsevier, vol. 175(1), pages 318-337, November.
- C Gagné & W L Price & M Gravel, 2002. "Comparing an ACO algorithm with other heuristics for the single machine scheduling problem with sequence-dependent setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(8), pages 895-906, August.
- Tan, K. C. & Narasimhan, R., 1997. "Minimizing tardiness on a single processor with sequence-dependent setup times: a simulated annealing approach," Omega, Elsevier, vol. 25(6), pages 619-634, December.
- Chris N. Potts & Luk N. Van Wassenhove, 1985. "A Branch and Bound Algorithm for the Total Weighted Tardiness Problem," Operations Research, INFORMS, vol. 33(2), pages 363-377, April.
- Liao, C. J. & Yu, W. C., 1996. "Sequencing heuristics for dependent setups in a continuous process industry," Omega, Elsevier, vol. 24(6), pages 649-659, December.
- Franca, Paulo M. & Mendes, Alexandre & Moscato, Pablo, 2001. "A memetic algorithm for the total tardiness single machine scheduling problem," European Journal of Operational Research, Elsevier, vol. 132(1), pages 224-242, July.
- Franca, Paulo M. & Gendreau, Michel & Laporte, Gilbert & Muller, Felipe M., 1996. "A tabu search heuristic for the multiprocessor scheduling problem with sequence dependent setup times," International Journal of Production Economics, Elsevier, vol. 43(2-3), pages 79-89, June.
- Gupta, Skylab R. & Smith, Jeffrey S., 2006. "Algorithms for single machine total tardiness scheduling with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 175(2), pages 722-739, December.
- Ozgur, C. O. & Brown, J. R., 1995. "A two-stage traveling salesman procedure for the single machine sequence-dependent scheduling problem," Omega, Elsevier, vol. 23(2), pages 205-219, April.
- Luo, Xiaochuan & Chu, Chengbin, 2007. "A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness," European Journal of Operational Research, Elsevier, vol. 180(1), pages 68-81, July.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- S-W Lin & K-C Ying, 2008. "A hybrid approach for single-machine tardiness problems with sequence-dependent setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(8), pages 1109-1119, August.
- Edward Sewell & Jason Sauppe & David Morrison & Sheldon Jacobson & Gio Kao, 2012. "A BB&R algorithm for minimizing total tardiness on a single machine with sequence dependent setup times," Journal of Global Optimization, Springer, vol. 54(4), pages 791-812, December.
- Arthur Kramer & Anand Subramanian, 2019. "A unified heuristic and an annotated bibliography for a large class of earliness–tardiness scheduling problems," Journal of Scheduling, Springer, vol. 22(1), pages 21-57, February.
- Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
- Gupta, Skylab R. & Smith, Jeffrey S., 2006. "Algorithms for single machine total tardiness scheduling with sequence dependent setups," European Journal of Operational Research, Elsevier, vol. 175(2), pages 722-739, December.
- J. E. Beasley & M. Krishnamoorthy & Y. M. Sharaiha & D. Abramson, 2000. "Scheduling Aircraft Landings—The Static Case," Transportation Science, INFORMS, vol. 34(2), pages 180-197, May.
- Pierre Hansen & Nenad Mladenović & José Moreno Pérez, 2010. "Variable neighbourhood search: methods and applications," Annals of Operations Research, Springer, vol. 175(1), pages 367-407, March.
- C Gagné & M Gravel & W L Price, 2005. "Using metaheuristic compromise programming for the solution of multiple-objective scheduling problems," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(6), pages 687-698, June.
- Og[breve]uz, Ceyda & Sibel Salman, F. & Bilgintürk YalçIn, Zehra, 2010. "Order acceptance and scheduling decisions in make-to-order systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 200-211, May.
- G I Zobolas & C D Tarantilis & G Ioannou, 2009. "A hybrid evolutionary algorithm for the job shop scheduling problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(2), pages 221-235, February.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Ferretti, Ivan & Zanoni, Simone & Zavanella, Lucio, 2006. "Production-inventory scheduling using Ant System metaheuristic," International Journal of Production Economics, Elsevier, vol. 104(2), pages 317-326, December.
- Yiyo Kuo & Sheng-I Chen & Yen-Hung Yeh, 2020. "Single machine scheduling with sequence-dependent setup times and delayed precedence constraints," Operational Research, Springer, vol. 20(2), pages 927-942, June.
- Allahverdi, Ali, 2015. "The third comprehensive survey on scheduling problems with setup times/costs," European Journal of Operational Research, Elsevier, vol. 246(2), pages 345-378.
- Zhang, Yi & Li, Xiaoping & Wang, Qian, 2009. "Hybrid genetic algorithm for permutation flowshop scheduling problems with total flowtime minimization," European Journal of Operational Research, Elsevier, vol. 196(3), pages 869-876, August.
- Luo, Xiaochuan & Chu, Chengbin, 2007. "A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness," European Journal of Operational Research, Elsevier, vol. 180(1), pages 68-81, July.
- Tan, Keah-Choon & Narasimhan, Ram & Rubin, Paul A. & Ragatz, Gary L., 2000. "A comparison of four methods for minimizing total tardiness on a single processor with sequence dependent setup times," Omega, Elsevier, vol. 28(3), pages 313-326, June.
- Anzanello, Michel J. & Fogliatto, Flavio S. & Santos, Luana, 2014. "Learning dependent job scheduling in mass customized scenarios considering ergonomic factors," International Journal of Production Economics, Elsevier, vol. 154(C), pages 136-145.
- Maenhout, Broos & Vanhoucke, Mario, 2010.
"A hybrid scatter search heuristic for personalized crew rostering in the airline industry,"
European Journal of Operational Research, Elsevier, vol. 206(1), pages 155-167, October.
- B. Maenhout & M. Vanhoucke, 2007. "A Hybrid Scatter Search Heuristic for Personalized Crew Rostering in the Airline Industry," Working Papers of Faculty of Economics and Business Administration, Ghent University, Belgium 07/454, Ghent University, Faculty of Economics and Business Administration.
- Manlio Gaudioso & Giovanni Giallombardo & Giovanna Miglionico, 2018. "Minimizing Piecewise-Concave Functions Over Polyhedra," Mathematics of Operations Research, INFORMS, vol. 43(2), pages 580-597, May.
More about this item
Keywords
Scheduling single machine; Greedy randomized adaptive search procedure; Differential evolution; Sequence-dependent setup times; Total tardiness;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:coopap:v:51:y:2012:i:1:p:411-435. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.