A flow-to-equity approach to coordinate supply chain network planning and financial planning with annual cash outflows to an institutional investor
Author
Abstract
Suggested Citation
DOI: 10.1007/s40685-016-0037-4
Download full text from publisher
References listed on IDEAS
- Martin Steinrücke & Wolfgang Albrecht, 2016. "Quantitative decision support for network integration of start-up companies," International Journal of Globalisation and Small Business, Inderscience Enterprises Ltd, vol. 8(1), pages 73-99.
- Sahling, Florian & Kayser, Ariane, 2016. "Strategic supply network planning with vendor selection under consideration of risk and demand uncertainty," Omega, Elsevier, vol. 59(PB), pages 201-214.
- VAN ROY, Tony J. & ERLENKOTTER, Donald, 1982. "A dual-based procedure for dynamic facility location," LIDAM Reprints CORE 490, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
- Saunders, Anthony & Schumacher, Liliana, 2000. "The determinants of bank interest rate margins: an international study," Journal of International Money and Finance, Elsevier, vol. 19(6), pages 813-832, December.
- Chakravarty, Amiya K., 2005. "Global plant capacity and product allocation with pricing decisions," European Journal of Operational Research, Elsevier, vol. 165(1), pages 157-181, August.
- K. Taaffe & J. Geunes, 2004. "Models For Integrated Customer Order Selection And Requirements Planning Under Limited Production Capacity," World Scientific Book Chapters, in: Panos M Pardalos & Athanasios Migdalas & George Baourakis (ed.), Supply Chain And Finance, chapter 19, pages 315-346, World Scientific Publishing Co. Pte. Ltd..
- Reza Babazadeh & Jafar Razmi & Reza Ghodsi, 2013. "Facility location in responsive and flexible supply chain network design (SCND) considering outsourcing," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 17(3), pages 295-310.
- Hinojosa, Y. & Puerto, J. & Fernandez, F. R., 2000. "A multiperiod two-echelon multicommodity capacitated plant location problem," European Journal of Operational Research, Elsevier, vol. 123(2), pages 271-291, June.
- Rong, Aiying & Akkerman, Renzo & Grunow, Martin, 2011. "An optimization approach for managing fresh food quality throughout the supply chain," International Journal of Production Economics, Elsevier, vol. 131(1), pages 421-429, May.
- Longinidis, Pantelis & Georgiadis, Michael C., 2011. "Integration of financial statement analysis in the optimal design of supply chain networks under demand uncertainty," International Journal of Production Economics, Elsevier, vol. 129(2), pages 262-276, February.
- Melo, M.T. & Nickel, S. & Saldanha-da-Gama, F., 2009. "Facility location and supply chain management - A review," European Journal of Operational Research, Elsevier, vol. 196(2), pages 401-412, July.
- D'Auria, Claudio & Foglia, Antonella & Reedtz, Paolo Marullo, 1999. "Bank interest rates and credit relationships in Italy," Journal of Banking & Finance, Elsevier, vol. 23(7), pages 1067-1093, July.
- Amid, Amin & Ghodsypour, S.H. & O'Brien, Christopher, 2009. "A weighted additive fuzzy multiobjective model for the supplier selection problem under price breaks in a supply Chain," International Journal of Production Economics, Elsevier, vol. 121(2), pages 323-332, October.
- Ouhimmou, M. & D'Amours, S. & Beauregard, R. & Ait-Kadi, D. & Chauhan, S. Singh, 2008. "Furniture supply chain tactical planning optimization using a time decomposition approach," European Journal of Operational Research, Elsevier, vol. 189(3), pages 952-970, September.
- Tony J. Van Roy & Donald Erlenkotter, 1982. "A Dual-Based Procedure for Dynamic Facility Location," Management Science, INFORMS, vol. 28(10), pages 1091-1105, October.
- William F. Sharpe, 1964. "Capital Asset Prices: A Theory Of Market Equilibrium Under Conditions Of Risk," Journal of Finance, American Finance Association, vol. 19(3), pages 425-442, September.
- Ho, William & Xu, Xiaowei & Dey, Prasanta K., 2010. "Multi-criteria decision making approaches for supplier evaluation and selection: A literature review," European Journal of Operational Research, Elsevier, vol. 202(1), pages 16-24, April.
- Wilhelm, Wilbert & Liang, Dong & Rao, Brijesh & Warrier, Deepak & Zhu, Xiaoyan & Bulusu, Sharath, 2005. "Design of international assembly systems and their supply chains under NAFTA," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 41(6), pages 467-493, November.
- Taaffe, Kevin & Geunes, Joseph & Romeijn, H. Edwin, 2008. "Target market selection and marketing effort under uncertainty: The selective newsvendor," European Journal of Operational Research, Elsevier, vol. 189(3), pages 987-1003, September.
- Tofighi, S. & Torabi, S.A. & Mansouri, S.A., 2016. "Humanitarian logistics network design under mixed uncertainty," European Journal of Operational Research, Elsevier, vol. 250(1), pages 239-250.
- Bruce C. Arntzen & Gerald G. Brown & Terry P. Harrison & Linda L. Trafton, 1995. "Global Supply Chain Management at Digital Equipment Corporation," Interfaces, INFORMS, vol. 25(1), pages 69-93, February.
- Baud-Lavigne, Bertrand & Agard, Bruno & Penz, Bernard, 2012. "Mutual impacts of product standardization and supply chain design," International Journal of Production Economics, Elsevier, vol. 135(1), pages 50-60.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Wolfgang Albrecht & Martin Steinrücke, 2020. "Continuous-time scheduling of production, distribution and sales in photovoltaic supply chains with declining prices," Flexible Services and Manufacturing Journal, Springer, vol. 32(3), pages 629-667, September.
- Martin Steinrücke & Wolfgang Albrecht, 2018. "Integrated supply chain network planning and financial planning respecting the imperfection of the capital market," Journal of Business Economics, Springer, vol. 88(6), pages 799-825, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Martin Steinrücke & Wolfgang Albrecht, 2018. "Integrated supply chain network planning and financial planning respecting the imperfection of the capital market," Journal of Business Economics, Springer, vol. 88(6), pages 799-825, August.
- Zhang, Abraham & Luo, Hao & Huang, George Q., 2013. "A bi-objective model for supply chain design of dispersed manufacturing in China," International Journal of Production Economics, Elsevier, vol. 146(1), pages 48-58.
- Seifert, Ralf W. & Langenberg, Kerstin U., 2011. "Managing business dynamics with adaptive supply chain portfolios," European Journal of Operational Research, Elsevier, vol. 215(3), pages 551-562, December.
- Wang, Mengyue & Huang, Hongxuan, 2019. "The design of a flexible capital-constrained global supply chain by integrating operational and financial strategies," Omega, Elsevier, vol. 88(C), pages 40-62.
- M. Fattahi & M. Mahootchi & S. M. Moattar Husseini, 2016. "Integrated strategic and tactical supply chain planning with price-sensitive demands," Annals of Operations Research, Springer, vol. 242(2), pages 423-456, July.
- Sanjay Dominik Jena & Jean-François Cordeau & Bernard Gendron, 2015. "Dynamic Facility Location with Generalized Modular Capacities," Transportation Science, INFORMS, vol. 49(3), pages 484-499, August.
- Häntsch, Marius & Huchzermeier, Arnd, 2016. "Correct accounting for duty drawbacks with outward and inward processing in global production networks," Omega, Elsevier, vol. 58(C), pages 111-127.
- Blossey, Gregor & Hahn, Gerd J. & Koberstein, Achim, 2022. "Planning pharmaceutical manufacturing networks in the light of uncertain production approval times," International Journal of Production Economics, Elsevier, vol. 244(C).
- Alejandro Montoya & Mario C. Vélez–Gallego & Juan G. Villegas, 2016. "Multi-product capacitated facility location problem with general production and building costs," Netnomics, Springer, vol. 17(1), pages 47-70, July.
- Güden, Hüseyin & Süral, Haldun, 2014. "Locating mobile facilities in railway construction management," Omega, Elsevier, vol. 45(C), pages 71-79.
- Dong Liang & Wilbert E. Wilhelm, 2013. "Dual‐ascent and primal heuristics for production‐assembly‐distribution system design," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(1), pages 1-18, February.
- H K Smith & G Laporte & P R Harper, 2009. "Locational analysis: highlights of growth to maturity," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 140-148, May.
- Elias Olivares-Benitez & José González-Velarde & Roger Ríos-Mercado, 2012. "A supply chain design problem with facility location and bi-objective transportation choices," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 20(3), pages 729-753, October.
- Meisel, Frank & Kirschstein, Thomas & Bierwirth, Christian, 2013. "Integrated production and intermodal transportation planning in large scale production–distribution-networks," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 60(C), pages 62-78.
- Ali Ekici & Pınar Keskinocak & Julie L. Swann, 2014. "Modeling Influenza Pandemic and Planning Food Distribution," Manufacturing & Service Operations Management, INFORMS, vol. 16(1), pages 11-27, February.
- António Antunes & Oded Berman & João Bigotte & Dmitry Krass, 2009. "A Location Model for Urban Hierarchy Planning with Population Dynamics," Environment and Planning A, , vol. 41(4), pages 996-1016, April.
- Jang, Hoon & Hwang, Kyosang & Lee, Taeho & Lee, Taesik, 2019. "Designing robust rollout plan for better rural perinatal care system in Korea," European Journal of Operational Research, Elsevier, vol. 274(2), pages 730-742.
- Allman, Andrew & Zhang, Qi, 2020. "Dynamic location of modular manufacturing facilities with relocation of individual modules," European Journal of Operational Research, Elsevier, vol. 286(2), pages 494-507.
- Fattahi, Mohammad & Mahootchi, Masoud & Govindan, Kannan & Moattar Husseini, Seyed Mohammad, 2015. "Dynamic supply chain network design with capacity planning and multi-period pricing," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 81(C), pages 169-202.
- Mestre, Ana Maria & Oliveira, Mónica Duarte & Barbosa-Póvoa, Ana Paula, 2015. "Location–allocation approaches for hospital network planning under uncertainty," European Journal of Operational Research, Elsevier, vol. 240(3), pages 791-806.
More about this item
Keywords
Company takeover; Flow-to-equity method; Annual cash outflows to the investor; Supply chain design; Capacity profiles; Mixed-integer non-linear programming;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:busres:v:9:y:2016:i:2:d:10.1007_s40685-016-0037-4. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.