Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-012-1240-0
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Stephen C. Graves & Sean P. Willems, 2000. "Optimizing Strategic Safety Stock Placement in Supply Chains," Manufacturing & Service Operations Management, INFORMS, vol. 2(1), pages 68-83, June.
- Stephen C. Graves & Sean P. Willems, 2005. "Optimizing the Supply Chain Configuration for New Products," Management Science, INFORMS, vol. 51(8), pages 1165-1180, August.
- Yao Zhao & David Simchi-Levi, 2006. "Performance Analysis and Evaluation of Assemble-to-Order Systems with Stochastic Sequential Lead Times," Operations Research, INFORMS, vol. 54(4), pages 706-724, August.
- Sven Axsäter, 1990. "Simple Solution Procedures for a Class of Two-Echelon Inventory Problems," Operations Research, INFORMS, vol. 38(1), pages 64-69, February.
- Karen A. Brown & Thomas G. Schmitt & Richard J. Schonberger & Stephen Dennis, 2004. "Quadrant Homes Applies Lean Concepts in a Project Environment," Interfaces, INFORMS, vol. 34(6), pages 442-450, December.
- Somerville, C Tsuriel, 1999. "Residential Construction Costs and the Supply of New Housing: Endogeneity and Bias in Construction Cost Indexes," The Journal of Real Estate Finance and Economics, Springer, vol. 18(1), pages 43-62, January.
- Rema Hariharan & Paul Zipkin, 1995. "Customer-Order Information, Leadtimes, and Inventories," Management Science, INFORMS, vol. 41(10), pages 1599-1607, October.
- Hausman, Warren H. & Lee, Hau L. & Zhang, Alex X., 1998. "Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies," European Journal of Operational Research, Elsevier, vol. 109(3), pages 646-659, September.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
- Hazır, Öncü & Ulusoy, Gündüz, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," International Journal of Production Economics, Elsevier, vol. 223(C).
- Öncü Hazir & Gündüz Ulusoy, 2020. "A classification and review of approaches and methods for modeling uncertainty in projects," Post-Print hal-02898162, HAL.
- Zhai, Yue & Cheng, T.C.E., 2022. "Lead-time quotation and hedging coordination in make-to-order supply chain," European Journal of Operational Research, Elsevier, vol. 300(2), pages 449-460.
- Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Yao Zhao, 2008. "Evaluation and Optimization of Installation Base-Stock Policies in Supply Chains with Compound Poisson Demand," Operations Research, INFORMS, vol. 56(2), pages 437-452, April.
- Hong, Zhaofu & Dai, Wei & Luh, Hsing & Yang, Chenchen, 2018. "Optimal configuration of a green product supply chain with guaranteed service time and emission constraints," European Journal of Operational Research, Elsevier, vol. 266(2), pages 663-677.
- Lijian Lu & Jing‐Sheng Song & Hanqin Zhang, 2015. "Optimal and asymptotically optimal policies for assemble‐to‐order n‐ and W‐systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 62(8), pages 617-645, December.
- Amini, Mehdi & Li, Haitao, 2011. "Supply chain configuration for diffusion of new products: An integrated optimization approach," Omega, Elsevier, vol. 39(3), pages 313-322, June.
- van Jaarsveld, Willem & Dollevoet, Twan & Dekker, Rommert, 2015. "Improving spare parts inventory control at a repair shop," Omega, Elsevier, vol. 57(PB), pages 217-229.
- Nepal, Bimal & Monplaisir, Leslie & Famuyiwa, Oluwafemi, 2012. "Matching product architecture with supply chain design," European Journal of Operational Research, Elsevier, vol. 216(2), pages 312-325.
- Anantaram Balakrishnan & Joseph Geunes & Michael S. Pangburn, 2004. "Coordinating Supply Chains by Controlling Upstream Variability Propagation," Manufacturing & Service Operations Management, INFORMS, vol. 6(2), pages 163-183, July.
- van Jaarsveld, W.L. & Dollevoet, T.A.B., 2011. "Spare parts inventory control for an aircraft component repair shop," Econometric Institute Research Papers EI2011-24, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Du, Bisheng & Larsen, Christian, 2017. "Reservation policies of advance orders in the presence of multiple demand classes," European Journal of Operational Research, Elsevier, vol. 256(2), pages 430-438.
- Funaki, Kenichi, 2012. "Strategic safety stock placement in supply chain design with due-date based demand," International Journal of Production Economics, Elsevier, vol. 135(1), pages 4-13.
- Eruguz, Ayse Sena & Sahin, Evren & Jemai, Zied & Dallery, Yves, 2016. "A comprehensive survey of guaranteed-service models for multi-echelon inventory optimization," International Journal of Production Economics, Elsevier, vol. 172(C), pages 110-125.
- Huang, Shuo & Axsäter, Sven & Dou, Yifan & Chen, Jian, 2011. "A real-time decision rule for an inventory system with committed service time and emergency orders," European Journal of Operational Research, Elsevier, vol. 215(1), pages 70-79, November.
- Steffen T. Klosterhalfen & Stefan Minner & Sean P. Willems, 2014. "Strategic Safety Stock Placement in Supply Networks with Static Dual Supply," Manufacturing & Service Operations Management, INFORMS, vol. 16(2), pages 204-219, May.
- Klosterhalfen, Steffen T. & Dittmar, Daniel & Minner, Stefan, 2013. "An integrated guaranteed- and stochastic-service approach to inventory optimization in supply chains," European Journal of Operational Research, Elsevier, vol. 231(1), pages 109-119.
- Jing-Sheng Song & Yao Zhao, 2009. "The Value of Component Commonality in a Dynamic Inventory System with Lead Times," Manufacturing & Service Operations Management, INFORMS, vol. 11(3), pages 493-508, March.
- Aouam, Tarik & Kumar, Kunal, 2019. "On the effect of overtime and subcontracting on supply chain safety stocks," Omega, Elsevier, vol. 89(C), pages 1-20.
- Moncayo-Martínez, Luis A. & Zhang, David Z., 2013. "Optimising safety stock placement and lead time in an assembly supply chain using bi-objective MAX–MIN ant system," International Journal of Production Economics, Elsevier, vol. 145(1), pages 18-28.
- Zhao, Yao, 2009. "Analysis and evaluation of an Assemble-to-Order system with batch ordering policy and compound Poisson demand," European Journal of Operational Research, Elsevier, vol. 198(3), pages 800-809, November.
- de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
- Barros, Júlio & Cortez, Paulo & Carvalho, M. Sameiro, 2021. "A systematic literature review about dimensioning safety stock under uncertainties and risks in the procurement process," Operations Research Perspectives, Elsevier, vol. 8(C).
More about this item
Keywords
Recurrent projects; Random material delays; Dynamic programming; Crashing; Safety-stock;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:241:y:2016:i:1:d:10.1007_s10479-012-1240-0. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.