The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers
Author
Abstract
Suggested Citation
DOI: 10.1007/s10479-013-1323-6
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Serge M. Karalli & A. Dale Flowers, 2006. "The Multiple-Family ELSP with Safety Stocks," Operations Research, INFORMS, vol. 54(3), pages 523-531, June.
- Meir Herzberg & Uri Yechiali, 1994. "Accelerating Procedures of the Value Iteration Algorithm for Discounted Markov Decision Processes, Based on a One-Step Lookahead Analysis," Operations Research, INFORMS, vol. 42(5), pages 940-946, October.
- Salah E. Elmaghraby, 1978. "The Economic Lot Scheduling Problem (ELSP): Review and Extensions," Management Science, INFORMS, vol. 24(6), pages 587-598, February.
- Karmarkar, Uday S. & Yoo, Jinsung, 1994. "The stochastic dynamic product cycling problem," European Journal of Operational Research, Elsevier, vol. 73(2), pages 360-373, March.
- Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
- Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Shib Sana, 2015. "An EOQ model for stochastic demand for limited capacity of own warehouse," Annals of Operations Research, Springer, vol. 233(1), pages 383-399, October.
- Löhndorf, Nils & Riel, Manuel & Minner, Stefan, 2014. "Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 157(C), pages 170-176.
- Yongjian Li & Xiaoqiang Cai & Lei Xu & Wenxia Yang, 2016. "Heuristic approach on dynamic lot-sizing model for durable products with end-of-use constraints," Annals of Operations Research, Springer, vol. 242(2), pages 265-283, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
- Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
- Beck, Fabian G. & Biel, Konstantin & Glock, Christoph H., 2019. "Integration of energy aspects into the economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 209(C), pages 399-410.
- Löhndorf, Nils & Riel, Manuel & Minner, Stefan, 2014. "Simulation optimization for the stochastic economic lot scheduling problem with sequence-dependent setup times," International Journal of Production Economics, Elsevier, vol. 157(C), pages 170-176.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2017. "Flexible lot sizing in hybrid make-to-order/make-to-stock production planning," European Journal of Operational Research, Elsevier, vol. 260(3), pages 1014-1023.
- Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
- Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
- Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
- Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
- Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
- Yokoyama, Masao, 1999. "The eclectic model for stochastic dynamic production cycling problem," International Journal of Production Economics, Elsevier, vol. 60(1), pages 359-367, April.
- Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
- Menezes, Mozart B.C. & Jalali, Hamed & Lamas, Alejandro, 2021. "One too many: Product proliferation and the financial performance in manufacturing," International Journal of Production Economics, Elsevier, vol. 242(C).
- Kumar Rajaram & Uday S. Karmarkar, 2002. "Product Cycling With Uncertain Yields: Analysis and Application to the Process Industry," Operations Research, INFORMS, vol. 50(4), pages 680-691, August.
- Garn, Wolfgang & Aitken, James, 2015. "Agile factorial production for a single manufacturing line with multiple products," European Journal of Operational Research, Elsevier, vol. 245(3), pages 754-766.
- Serge M. Karalli & A. Dale Flowers, 2006. "The Multiple-Family ELSP with Safety Stocks," Operations Research, INFORMS, vol. 54(3), pages 523-531, June.
- Wagner, Michael & Smits, Sanne R., 2004. "A local search algorithm for the optimization of the stochastic economic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 90(3), pages 391-402, August.
- Wei-Min Lan & Tava Lennon Olsen, 2006. "Multiproduct Systems with Both Setup Times and Costs: Fluid Bounds and Schedules," Operations Research, INFORMS, vol. 54(3), pages 505-522, June.
- Ramesh Bollapragada & Uday Rao, 1999. "Single-Stage Resource Allocation and Economic Lot Scheduling on Multiple, Nonidentical Production Lines," Management Science, INFORMS, vol. 45(6), pages 889-904, June.
- Heuts, R.M.J. & Nederstigt, P. & Roebroek, W. & Selen, W.J., 1992. "Multi-product cycling with packaging in the process industry," Other publications TiSEM 533d6bbb-e61a-4e4b-a44e-1, Tilburg University, School of Economics and Management.
More about this item
Keywords
Stochastic economic lot sizing problem; Dynamic scheduling; Process industry; Markov decision process;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:annopr:v:209:y:2013:i:1:p:179-205:10.1007/s10479-013-1323-6. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.