Asset replacement for an urban railway using a modified two-cycle replacement model
Author
Abstract
Suggested Citation
DOI: 10.1057/palgrave.jors.2602288
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Scarf, Philip A. & Martin, Harry H., 2001. "A framework for maintenance and replacement of a network structured system," International Journal of Production Economics, Elsevier, vol. 69(3), pages 287-296, February.
- Bowe, Michael & Lee, Ding Lun, 2004. "Project evaluation in the presence of multiple embedded real options: evidence from the Taiwan High-Speed Rail Project," Journal of Asian Economics, Elsevier, vol. 15(1), pages 71-98, February.
- Hartman, Joseph C., 2004. "Multiple asset replacement analysis under variable utilization and stochastic demand," European Journal of Operational Research, Elsevier, vol. 159(1), pages 145-165, November.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yatsenko, Yuri & Hritonenko, Natali, 2020. "Optimal asset replacement: Profit maximization under varying technology," International Journal of Production Economics, Elsevier, vol. 228(C).
- Yatsenko, Yuri & Hritonenko, Natali, 2015. "Algorithms for asset replacement under limited technological forecast," International Journal of Production Economics, Elsevier, vol. 160(C), pages 26-33.
- Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Oliveira, A. & Couto, G. & Pimentel, P., 2021. "Uncertainty and flexibility in infrastructure investments: Application of real options analysis to the Ponta Delgada airport expansion," Research in Transportation Economics, Elsevier, vol. 90(C).
- Alberti, Alexandre R. & Cavalcante, Cristiano A.V. & Scarf, Philip & Silva, André L.O., 2018. "Modelling inspection and replacement quality for a protection system," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 145-153.
- Ansaripoor, Amir H. & Oliveira, Fernando S., 2018. "Flexible lease contracts in the fleet replacement problem with alternative fuel vehicles: A real-options approach," European Journal of Operational Research, Elsevier, vol. 266(1), pages 316-327.
- Spiritus, Kevin & Lehmann, Etienne & Renes, Sander & Zoutman, Floris T., 0.
"Optimal taxation with multiple incomes and types,"
Theoretical Economics, Econometric Society.
- Kevin Spiritus & Etienne Lehmann & Sander Renes, "undated". "Optimal Taxation with Multiple Incomes and Types," Tinbergen Institute Discussion Papers 22-000/IVI, Tinbergen Institute.
- Kevin Spiritus & Etienne Lehmann & Sander Renes & Floris T Zoutman, 2023. "Optimal Taxation with Multiple Incomes and Types," Working Papers hal-04066627, HAL.
- Spiritus, Kevin & Lehmann, Etienne & Renes, Sander & Zoutman, Floris T., 2022. "Optimal Taxation with Multiple Incomes and Types," Discussion Papers 2022/3, Norwegian School of Economics, Department of Business and Management Science.
- Spiritus, Kevin & Lehmann, Etienne & Renes, Sander & Zoutman, Floris, 2022. "Optimal Taxation with Multiple Incomes and Types," CEPR Discussion Papers 16797, C.E.P.R. Discussion Papers.
- Spiritus, Kevin & Lehmann, Etienne & Renes, Sander & Zoutman, Floris T., 2022. "Optimal Taxation with Multiple Incomes and Types," IZA Discussion Papers 15036, Institute of Labor Economics (IZA).
- Kevin Spiritus & Etienne Lehmann & Sander Renes & Floris T. Zoutman, 2022. "Optimal Taxation with Multiple Incomes and Types," TEPP Working Paper 2022-01, TEPP.
- Kevin Spiritus & Etienne Lehmann & Sander Renes & Floris Zoutman, 2022. "Optimal Taxation with Multiple Incomes and Types," CESifo Working Paper Series 9534, CESifo.
- Kim, Kangsoo, 2020. "Robust Contract Conditions Under the Newly Introduced BTO-rs Scheme: Application to an Urban Railway Project," KDI Journal of Economic Policy, Korea Development Institute (KDI), vol. 42(4), pages 117-138.
- Engelen, Peter-Jan & Kool, Clemens & Li, Ye, 2016.
"A barrier options approach to modeling project failure: The case of hydrogen fuel infrastructure,"
Resource and Energy Economics, Elsevier, vol. 43(C), pages 33-56.
- Y. Li & P.J. Engelen & C.J.M. Kool, 2013. "A Barrier Options Approach to Modeling Project Failure: The Case of Hydrogen Fuel Infrastructure," Working Papers 13-01, Utrecht School of Economics.
- Zhang, Le & Gu, Weihua & Fu, Liangliang & Mei, Yu & Hu, Yaohua, 2021. "A two-stage heuristic approach for fleet management optimization under time-varying demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 147(C).
- Kangsoo Kim & Jinseog Kim & Hyejin Cho & Donghyung Yook, 2024. "Determining contract conditions in a PPP project among deep uncertainty in future outturn travel demand," Transportation, Springer, vol. 51(3), pages 937-961, June.
- Shields, Brett A. & Seif, Javad & Yu, Andrew Junfang, 2019. "Parallel machine replacement with shipping decisions," International Journal of Production Economics, Elsevier, vol. 218(C), pages 62-71.
- Eduardo González & Leonardo Epstein, 2015. "Minimum cost in a mix of new and old reusable items: an application to sizing a fleet of delivery trucks," Annals of Operations Research, Springer, vol. 232(1), pages 135-149, September.
- S Apeland & P A Scarf, 2003. "A fully subjective approach to capital equipment replacement," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(4), pages 371-378, April.
- Kangsoo Kim & Hyejin Cho & Donghyung Yook, 2019. "Financing for a Sustainable PPP Development: Valuation of the Contractual Rights under Exercise Conditions for an Urban Railway PPP Project in Korea," Sustainability, MDPI, vol. 11(6), pages 1-14, March.
- Ansaripoor, Amir H. & Oliveira, Fernando S. & Liret, Anne, 2014. "A risk management system for sustainable fleet replacement," European Journal of Operational Research, Elsevier, vol. 237(2), pages 701-712.
- Dimitrios Koumparoulis, 2011. "The Proportionality Hypothesis in Capital Theory: an Assessment of the Literature," EuroEconomica, Danubius University of Galati, issue 27, pages 27-39, February.
- Campbell, Rachel A. & Kräussl, Roman, 2006. "Does patience pay? Empirical testing of the option to delay accepting a tender offer in the US banking sector," CFS Working Paper Series 2006/32, Center for Financial Studies (CFS).
- Ohlmann, Jeffrey W. & Bean, James C., 2009. "Resource-constrained management of heterogeneous assets with stochastic deterioration," European Journal of Operational Research, Elsevier, vol. 199(1), pages 198-208, November.
- Carlos Andrés Zapata Quimbayo, 2020. "OPCIONES REALES Una guía teórico-práctica para la valoración de inversiones bajo incertidumbre mediante modelos en tiempo discreto y simulación de Monte Carlo," Books, Universidad Externado de Colombia, Facultad de Finanzas, Gobierno y Relaciones Internacionales, number 138.
- Stumpf, Gabriel & Marques, Rui Cunha & Geddes, R. Richard & Igrejas da Silva, Rafael, 2024. "Risk mitigation in urban bus concession contracts: Overcoming uncertainties with a real options model," Transport Policy, Elsevier, vol. 154(C), pages 73-83.
- Nakagawa, Dai & Hatoko, Masatoshi, 2007. "Reevaluation of Japanese high-speed rail construction: Recent situation of the north corridor Shinkansen and its way to completion," Transport Policy, Elsevier, vol. 14(2), pages 150-164, March.
- Polat, Levent & Battal, Unal (Ãœnal), 2021. "Airport infrastructure investments and valuing expansion decisions using the compound real option approach," Journal of Air Transport Management, Elsevier, vol. 91(C).
More about this item
Keywords
capital replacement; two-cycle replacement model; fixed horizon replacement model;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pal:jorsoc:v:58:y:2007:i:9:d:10.1057_palgrave.jors.2602288. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.palgrave-journals.com/ .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.