Supply Chain Collaboration under Uncertainty in the Albanian Beer Market
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Wagner, Stephan M. & Neshat, Nikrouz, 2010. "Assessing the vulnerability of supply chains using graph theory," International Journal of Production Economics, Elsevier, vol. 126(1), pages 121-129, July.
- Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
- Tang, Ou & Nurmaya Musa, S., 2011. "Identifying risk issues and research advancements in supply chain risk management," International Journal of Production Economics, Elsevier, vol. 133(1), pages 25-34, September.
- Klibi, Walid & Martel, Alain & Guitouni, Adel, 2010. "The design of robust value-creating supply chain networks: A critical review," European Journal of Operational Research, Elsevier, vol. 203(2), pages 283-293, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Alev Ozer Torgaloz & Mehmet Fatih Acar & Cemil Kuzey, 2023. "The effects of organizational learning culture and decentralization upon supply chain collaboration: analysis of covid-19 period," Operations Management Research, Springer, vol. 16(1), pages 511-530, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ramezani, Javaneh & Camarinha-Matos, Luis M., 2020. "Approaches for resilience and antifragility in collaborative business ecosystems," Technological Forecasting and Social Change, Elsevier, vol. 151(C).
- Kim, Taebok & Glock, Christoph H., 2018. "Production planning for a two-stage production system with multiple parallel machines and variable production rates," International Journal of Production Economics, Elsevier, vol. 196(C), pages 284-292.
- Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
- Seyyed Mohammad Seyyed Alizadeh Ganji & Mohammad Hayati, 2016. "Identifying and Assessing the Risks in the Supply Chain," Modern Applied Science, Canadian Center of Science and Education, vol. 10(6), pages 1-74, June.
- Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
- Castellano, Davide & Gallo, Mosè & Grassi, Andrea & Santillo, Liberatina C., 2019. "The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain," International Journal of Production Economics, Elsevier, vol. 218(C), pages 30-42.
- Hatem Elleuch & Wafik Hachicha & Habib Chabchoub, 2014. "A combined approach for supply chain risk management: description and application to a real hospital pharmaceutical case study," Journal of Risk Research, Taylor & Francis Journals, vol. 17(5), pages 641-663, May.
- Gharaei, Abolfazl & Almehdawe, Eman, 2020. "Economic growing quantity," International Journal of Production Economics, Elsevier, vol. 223(C).
- Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
- Sumon Sarkar & Bibhas C. Giri, 2022. "Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment," Operational Research, Springer, vol. 22(2), pages 917-946, April.
- Castellano, Davide & Glock, Christoph H., 2024. "Economic production quantity for a decaying item with stochastic demand and positive lead time," International Journal of Production Economics, Elsevier, vol. 267(C).
- Marcello Braglia & Davide Castellano & Marco Frosolini, 2016. "Joint-replenishment problem under stochastic demands with backorders-lost sales mixtures, controllable lead times, and investment to reduce the major ordering cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(8), pages 1108-1120, August.
- Gholami-Zanjani, Seyed Mohammad & Klibi, Walid & Jabalameli, Mohammad Saeed & Pishvaee, Mir Saman, 2021. "The design of resilient food supply chain networks prone to epidemic disruptions," International Journal of Production Economics, Elsevier, vol. 233(C).
- AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
- Snoeck, André & Udenio, Maximiliano & Fransoo, Jan C., 2019. "A stochastic program to evaluate disruption mitigation investments in the supply chain," European Journal of Operational Research, Elsevier, vol. 274(2), pages 516-530.
- Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
- Mou, Qiong & Cheng, Yunlong & Liao, Huchang, 2017. "A note on “lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand”," International Journal of Production Economics, Elsevier, vol. 193(C), pages 827-831.
- Brandenburg, Marcus, 2017. "A hybrid approach to configure eco-efficient supply chains under consideration of performance and risk aspects," Omega, Elsevier, vol. 70(C), pages 58-76.
- Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
- Huang, Di & Ouyang, Lian Qun & Zhou, Hong, 2012. "Note on: Managing multi-echelon multi-item channels with trade allowances under credit period," International Journal of Production Economics, Elsevier, vol. 138(1), pages 117-124.
More about this item
Keywords
supply chain management; supply chain collaboration; supply chain uncertainty; organizational culture; Albanian beer producers.;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:nup:jrmdke:v:3:y:2015:i:1:p:99-117. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Cristian-Mihai VIDU (email available below). General contact details of provider: https://edirc.repec.org/data/fmsnsro.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.