Fuzzy Control Model and Simulation for Nonlinear Supply Chain System with Lead Times
Author
Abstract
Suggested Citation
DOI: 10.1155/2017/2017634
Download full text from publisher
References listed on IDEAS
- Glock, C. H., 2012. "Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57816, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
- Glock, Christoph H., 2012. "Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand," International Journal of Production Economics, Elsevier, vol. 136(1), pages 37-44.
- Zimmer, Kirstin, 2002. "Supply chain coordination with uncertain just-in-time delivery," International Journal of Production Economics, Elsevier, vol. 77(1), pages 1-15, May.
- Park, Sukun & Lee, Tae-Eog & Sung, Chang Sup, 2010. "A three-level supply chain network design model with risk-pooling and lead times," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 46(5), pages 563-581, September.
- Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
- Wang, Xun & Disney, Stephen M., 2017. "Mitigating variance amplification under stochastic lead-time: The proportional control approach," European Journal of Operational Research, Elsevier, vol. 256(1), pages 151-162.
- Leng, Mingming & Parlar, Mahmut, 2009. "Lead-time reduction in a two-level supply chain: Non-cooperative equilibria vs. coordination with a profit-sharing contract," International Journal of Production Economics, Elsevier, vol. 118(2), pages 521-544, April.
- Garcia, C.A. & Ibeas, A. & Herrera, J. & Vilanova, R., 2012. "Inventory control for the supply chain: An adaptive control approach based on the identification of the lead-time," Omega, Elsevier, vol. 40(3), pages 314-327.
- Kamran Karimi Movahed & Zhi-Hai Zhang, 2015. "Robust design of (, ) inventory policy parameters in supply chains with demand and lead time uncertainties," International Journal of Systems Science, Taylor & Francis Journals, vol. 46(12), pages 2258-2268, September.
- Zhang, Guoquan & Shang, Jennifer & Li, Wenli, 2011. "Collaborative production planning of supply chain under price and demand uncertainty," European Journal of Operational Research, Elsevier, vol. 215(3), pages 590-603, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Xiu-Zhen Xu & Yi-Feng Niu & Qing Li, 2019. "Efficient Enumeration of - Minimal Paths in Reliability Evaluation of Multistate Networks," Complexity, Hindawi, vol. 2019, pages 1-10, March.
- Songtao Zhang & Shuangshuang Li & Siqi Zhang & Min Zhang, 2017. "Decision of Lead-Time Compression and Stable Operation of Supply Chain," Complexity, Hindawi, vol. 2017, pages 1-11, November.
- Songtao Zhang & Panpan Zhang & Min Zhang, 2019. "Fuzzy Emergency Model and Robust Emergency Strategy of Supply Chain System under Random Supply Disruptions," Complexity, Hindawi, vol. 2019, pages 1-10, January.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Sajjad Aslani Khiavi & Hamid Khaloozadeh & Fahimeh Soltanian, 2021. "Suboptimal sliding manifold For nonlinear supply chain with time delay," Journal of Combinatorial Optimization, Springer, vol. 42(1), pages 151-173, July.
- Heydari, Jafar, 2014. "Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 63(C), pages 44-58.
- Asif Iqbal Malik & Biswajit Sarkar, 2019. "Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction," Mathematics, MDPI, vol. 7(5), pages 1-28, May.
- Zhai, Yue & Choi, Tsan-Ming & Shao, Saijun & Xu, Su Xiu & Huang, George Q., 2020. "Spatial-temporal hedging coordination in prefabricated housing production," International Journal of Production Economics, Elsevier, vol. 229(C).
- Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
- Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
- Zhai, Yue & Hua, Guowei & Cheng, Meng & Cheng, T.C.E., 2023. "Production lead-time hedging and order allocation in an MTO supply chain," European Journal of Operational Research, Elsevier, vol. 311(3), pages 887-905.
- Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
- Castellano, Davide & Gallo, Mosè & Grassi, Andrea & Santillo, Liberatina C., 2019. "The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain," International Journal of Production Economics, Elsevier, vol. 218(C), pages 30-42.
- Rabin Kumar Mallick & Kartik Patra & Shyamal Kumar Mondal, 2020. "Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments," Annals of Operations Research, Springer, vol. 292(1), pages 341-369, September.
- Noblesse, Ann M. & Boute, Robert N. & Lambrecht, Marc R. & Van Houdt, Benny, 2014. "Lot sizing and lead time decisions in production/inventory systems," International Journal of Production Economics, Elsevier, vol. 155(C), pages 351-360.
- Gharaei, Abolfazl & Almehdawe, Eman, 2020. "Economic growing quantity," International Journal of Production Economics, Elsevier, vol. 223(C).
- Oshmita Dey, 2019. "A fuzzy random integrated inventory model with imperfect production under optimal vendor investment," Operational Research, Springer, vol. 19(1), pages 101-115, March.
- Soumya Kanti Hota & Biswajit Sarkar & Santanu Kumar Ghosh, 2020. "Effects of Unequal Lot Size and Variable Transportation in Unreliable Supply Chain Management," Mathematics, MDPI, vol. 8(3), pages 1-24, March.
- Sumon Sarkar & Bibhas C. Giri, 2022. "Safety stock management in a supply chain model with waiting time and price discount dependent backlogging rate in stochastic environment," Operational Research, Springer, vol. 22(2), pages 917-946, April.
- Denisa MAMILLO, 2015. "Supply Chain Collaboration under Uncertainty in the Albanian Beer Market," Management Dynamics in the Knowledge Economy, College of Management, National University of Political Studies and Public Administration, vol. 3(1), pages 99-117, March.
- Castellano, Davide & Glock, Christoph H., 2024. "Economic production quantity for a decaying item with stochastic demand and positive lead time," International Journal of Production Economics, Elsevier, vol. 267(C).
- Marcello Braglia & Davide Castellano & Marco Frosolini, 2016. "Joint-replenishment problem under stochastic demands with backorders-lost sales mixtures, controllable lead times, and investment to reduce the major ordering cost," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(8), pages 1108-1120, August.
- S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
- AlDurgam, Mohammad & Adegbola, Kehinde & Glock, Christoph H., 2017. "A single-vendor single-manufacturer integrated inventory model with stochastic demand and variable production rate," International Journal of Production Economics, Elsevier, vol. 191(C), pages 335-350.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:complx:2017634. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.