An Integrated Hybrid MCDM Approach for Vendor Selection Problem (Case Study: Iran Khodro)
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Ghodsypour, S. H. & O'Brien, C., 1998. "A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming," International Journal of Production Economics, Elsevier, vol. 56(1), pages 199-212, September.
- Erol, Ismail & Ferrell, William Jr., 2003. "A methodology for selection problems with multiple, conflicting objectives and both qualitative and quantitative criteria," International Journal of Production Economics, Elsevier, vol. 86(3), pages 187-199, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ashoke Kumar Bera & Dipak Kumar Jana & Debamalya Banerjee & Titas Nandy, 2021. "A Two-Phase Multi-criteria Fuzzy Group Decision Making Approach for Supplier Evaluation and Order Allocation Considering Multi-objective, Multi-product and Multi-period," Annals of Data Science, Springer, vol. 8(3), pages 577-601, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Faez, F. & Ghodsypour, S.H. & O'Brien, C., 2009. "Vendor selection and order allocation using an integrated fuzzy case-based reasoning and mathematical programming model," International Journal of Production Economics, Elsevier, vol. 121(2), pages 395-408, October.
- Li, Yan-Lai & Tang, Jia-Fu & Chin, Kwai-Sang & Jiang, Yu-Shi & Han, Yi & Pu, Yun, 2011. "Estimating the final priority ratings of engineering characteristics in mature-period product improvement by MDBA and AHP," International Journal of Production Economics, Elsevier, vol. 131(2), pages 575-586, June.
- Pokharel, Shaligram, 2008. "A two objective model for decision making in a supply chain," International Journal of Production Economics, Elsevier, vol. 111(2), pages 378-388, February.
- Scott, James & Ho, William & Dey, Prasanta K. & Talluri, Srinivas, 2015. "A decision support system for supplier selection and order allocation in stochastic, multi-stakeholder and multi-criteria environments," International Journal of Production Economics, Elsevier, vol. 166(C), pages 226-237.
- Ventura, José A. & Bunn, Kevin A. & Venegas, Bárbara B. & Duan, Lisha, 2021. "A coordination mechanism for supplier selection and order quantity allocation with price-sensitive demand and finite production rates," International Journal of Production Economics, Elsevier, vol. 233(C).
- Iranmanesh, Hossein & Thomson, Vince, 2008. "Competitive advantage by adjusting design characteristics to satisfy cost targets," International Journal of Production Economics, Elsevier, vol. 115(1), pages 64-71, September.
- David Opresnik & Maurizio Fiasché & Marco Taisch & Manuel Hirsch, 0. "An evolving fuzzy inference system for extraction of rule set for planning a product–service strategy," Information Technology and Management, Springer, vol. 0, pages 1-17.
- Huang, Samuel H. & Keskar, Harshal, 2007. "Comprehensive and configurable metrics for supplier selection," International Journal of Production Economics, Elsevier, vol. 105(2), pages 510-523, February.
- Ho, William, 2008. "Integrated analytic hierarchy process and its applications - A literature review," European Journal of Operational Research, Elsevier, vol. 186(1), pages 211-228, April.
- Ali Salmasnia & Hamid Daliri & Ali Ghorbanian & Hadi Mokhtari, 2018. "A statistical analysis and simulation based approach to an uncertain supplier selection problem with discount option," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 9(6), pages 1250-1259, December.
- Hsu, C.-H. & Wang, Fu-Kwun & Tzeng, Gwo-Hshiung, 2012. "The best vendor selection for conducting the recycled material based on a hybrid MCDM model combining DANP with VIKOR," Resources, Conservation & Recycling, Elsevier, vol. 66(C), pages 95-111.
- Mengtian Cui & Yi-Cheng Zhang, 2018. "Application of Markov chain approach for multi-attributes dynamic software reliability assessment under both AHP and gray correlation methods," International Journal of Modern Physics C (IJMPC), World Scientific Publishing Co. Pte. Ltd., vol. 29(05), pages 1-10, May.
- Imane Tronnebati & Manal El Yadari & Fouad Jawab, 2022. "A Review of Green Supplier Evaluation and Selection Issues Using MCDM, MP and AI Models," Sustainability, MDPI, vol. 14(24), pages 1-22, December.
- Pınar Kaya Samut, 2017. "Integrated FANP-f-MIGP model for supplier selection in the renewable energy sector," Journal of Business Economics and Management, Taylor & Francis Journals, vol. 18(3), pages 427-450, May.
- Hajji, Adnene & Gharbi, Ali & Kenne, Jean-Pierre & Pellerin, Robert, 2011. "Production control and replenishment strategy with multiple suppliers," European Journal of Operational Research, Elsevier, vol. 208(1), pages 67-74, January.
- Ehsan Afshar Bakeshlou & Alireza Arshadi Khamseh & Mohammad Ali Goudarzian Asl & Javad Sadeghi & Mostafa Abbaszadeh, 2017. "Evaluating a green supplier selection problem using a hybrid MODM algorithm," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 913-927, April.
- Rajiv Kumar Sharma, 2022. "Examining interaction among supplier selection strategies in an outsourcing environment using ISM and fuzzy logic approach," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(5), pages 2175-2194, October.
- Kannan Govindan & R. Sivakumar, 2016. "Green supplier selection and order allocation in a low-carbon paper industry: integrated multi-criteria heterogeneous decision-making and multi-objective linear programming approaches," Annals of Operations Research, Springer, vol. 238(1), pages 243-276, March.
- Alireza Eydi & Leyla Fazli, 2016. "A Multi-Period Multiple Objective Uncertain Programming Model to Allocate Order for Supplier Selection Problem," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(06), pages 1-40, December.
- Hao, Jun & Li, Jianping & Wu, Dengsheng & Sun, Xiaolei, 2020. "Portfolio optimisation of material purchase considering supply risk – A multi-objective programming model," International Journal of Production Economics, Elsevier, vol. 230(C).
More about this item
Keywords
Vendor selection problem; Interdependence; Trade-offs; FANP; Fuzzy TOPSIS;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:mth:bmh888:v:1:y:2013:i:1:p:153-170. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Technical Support Office (email available below). General contact details of provider: http://www.macrothink.org/journal/index.php/bmh .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.