IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v208y2011i1p67-74.html
   My bibliography  Save this article

Production control and replenishment strategy with multiple suppliers

Author

Listed:
  • Hajji, Adnene
  • Gharbi, Ali
  • Kenne, Jean-Pierre
  • Pellerin, Robert

Abstract

This paper considers the joint supplier selection, replenishment and manufacturing control problem in a dynamic stochastic context. This problem is characterized by conflicting interests between suppliers, the manufacturer, and clients, which raise the need for coordination and information sharing. This paper contributes to the discourse mainly by developing and resolving an integrated mathematical model leading to information sharing strategies for supplier selection, replenishments and production activities. This is an optimal control problem with state constraints and hybrid dynamics. A dynamic stochastic model is thus proposed, and the optimality conditions obtained are then solved numerically. It is shown that the problem considered leads to a modified state-dependent multi-level (s, S) policy for the supplier selection and replenishment strategy and a base-stock policy for the production activities. The fact that these control policies are coupled confirms the necessity of considering the interactions present in the system in an integrated model. The obtained results show clearly that it is always profitable to consider multiple suppliers to make replenishment and production decisions. Moreover, it is shown that the availability rates of the supply chain actors and the replenishment lead time are important parameters to consider when choosing the best supplier.

Suggested Citation

  • Hajji, Adnene & Gharbi, Ali & Kenne, Jean-Pierre & Pellerin, Robert, 2011. "Production control and replenishment strategy with multiple suppliers," European Journal of Operational Research, Elsevier, vol. 208(1), pages 67-74, January.
  • Handle: RePEc:eee:ejores:v:208:y:2011:i:1:p:67-74
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(10)00547-3
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ghodsypour, S. H. & O'Brien, C., 1998. "A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming," International Journal of Production Economics, Elsevier, vol. 56(1), pages 199-212, September.
    2. Kamran Moinzadeh & Steven Nahmias, 1988. "A Continuous Review Model for an Inventory System with Two Supply Modes," Management Science, INFORMS, vol. 34(6), pages 761-773, June.
    3. Parlar, Mahmut & Perry, David, 1995. "Analysis of a (Q, r, T) inventory policy with deterministic and random yields when future supply is uncertain," European Journal of Operational Research, Elsevier, vol. 84(2), pages 431-443, July.
    4. Verma, Rohit & Pullman, Madeleine E., 1998. "An analysis of the supplier selection process," Omega, Elsevier, vol. 26(6), pages 739-750, December.
    5. Minner, Stefan, 2003. "Multiple-supplier inventory models in supply chain management: A review," International Journal of Production Economics, Elsevier, vol. 81(1), pages 265-279, January.
    6. Johansen, Soren Glud & Thorstenson, Anders, 1998. "An inventory model with Poisson demands and emergency orders," International Journal of Production Economics, Elsevier, vol. 56(1), pages 275-289, September.
    7. Fong, Duncan K. H. & Gempesaw, Virginia M. & Keith Ord, J., 2000. "Analysis of a dual sourcing inventory model with normal unit demand and Erlang mixture lead times," European Journal of Operational Research, Elsevier, vol. 120(1), pages 97-107, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dhahri, Akrem & Gharbi, Ali & Ouhimmou, Mustapha, 2022. "Integrated production-delivery control policy for an unreliable manufacturing system and multiple retailers," International Journal of Production Economics, Elsevier, vol. 245(C).
    2. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    3. Jun Wang, 2020. "Path and policy analyses: a sustainability study of military workforce supply chains," The Journal of Defense Modeling and Simulation, , vol. 17(4), pages 389-397, October.
    4. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    5. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2015. "Replenishment, production and quality control strategies in three-stage supply chain," International Journal of Production Economics, Elsevier, vol. 166(C), pages 90-102.
    6. Hlioui, Rached & Gharbi, Ali & Hajji, Adnène, 2017. "Joint supplier selection, production and replenishment of an unreliable manufacturing-oriented supply chain," International Journal of Production Economics, Elsevier, vol. 187(C), pages 53-67.
    7. Firouz, Mohammad & Keskin, Burcu B. & Melouk, Sharif H., 2017. "An integrated supplier selection and inventory problem with multi-sourcing and lateral transshipments," Omega, Elsevier, vol. 70(C), pages 77-93.
    8. Bouslah, B. & Gharbi, A. & Pellerin, R., 2016. "Integrated production, sampling quality control and maintenance of deteriorating production systems with AOQL constraint," Omega, Elsevier, vol. 61(C), pages 110-126.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    2. Johansen, Søren Glud & Thorstenson, Anders, 2014. "Emergency orders in the periodic-review inventory system with fixed ordering costs and compound Poisson demand," International Journal of Production Economics, Elsevier, vol. 157(C), pages 147-157.
    3. Duran, Alfonso & Gutierrez, Gil & Zequeira, Romulo I., 2004. "A continuous review inventory model with order expediting," International Journal of Production Economics, Elsevier, vol. 87(2), pages 157-169, January.
    4. Sean X. Zhou & Chaolin Yang, 2016. "Continuous-Review ( R, nQ ) Policies for Inventory Systems with Dual Delivery Modes," Operations Research, INFORMS, vol. 64(6), pages 1302-1319, December.
    5. Pérez, Cinthia & Geunes, Joseph, 2014. "A (Q,R) inventory replenishment model with two delivery modes," European Journal of Operational Research, Elsevier, vol. 237(2), pages 528-545.
    6. Axsater, Sven, 2007. "A heuristic for triggering emergency orders in an inventory system," European Journal of Operational Research, Elsevier, vol. 176(2), pages 880-891, January.
    7. Minner, Stefan, 2003. "Multiple-supplier inventory models in supply chain management: A review," International Journal of Production Economics, Elsevier, vol. 81(1), pages 265-279, January.
    8. Johansen, Søren Glud, 2019. "Emergency orders in the periodic-review inventory system with fixed ordering costs and stochastic lead times for normal orders," International Journal of Production Economics, Elsevier, vol. 209(C), pages 205-214.
    9. Axsäter, Sven, 2014. "An improved decision rule for emergency replenishments," International Journal of Production Economics, Elsevier, vol. 157(C), pages 313-317.
    10. Zhang, Ju-liang & Zhang, Ming-yu, 2011. "Supplier selection and purchase problem with fixed cost and constrained order quantities under stochastic demand," International Journal of Production Economics, Elsevier, vol. 129(1), pages 1-7, January.
    11. Roni, Mohammad S. & Jin, Mingzhou & Eksioglu, Sandra D., 2015. "A hybrid inventory management system responding to regular demand and surge demand," Omega, Elsevier, vol. 52(C), pages 190-200.
    12. Riezebos, Jan & Zhu, Stuart X., 2020. "Inventory control with seasonality of lead times," Omega, Elsevier, vol. 92(C).
    13. Martinez de Albeniz, Victor, 2007. "Pricing in a duopoly with a lead time advantage," IESE Research Papers D/720, IESE Business School.
    14. Aly Owida & P.J. Byrne & Cathal Heavey & Paul Blake & Khaled S. El-Kilany, 2016. "A simulation based continuous improvement approach for manufacturing based field repair service contracting," International Journal of Production Research, Taylor & Francis Journals, vol. 54(21), pages 6458-6477, November.
    15. Chan, Felix T.S. & Kumar, Niraj, 2007. "Global supplier development considering risk factors using fuzzy extended AHP-based approach," Omega, Elsevier, vol. 35(4), pages 417-431, August.
    16. Chen, Chen-Tung & Lin, Ching-Torng & Huang, Sue-Fn, 2006. "A fuzzy approach for supplier evaluation and selection in supply chain management," International Journal of Production Economics, Elsevier, vol. 102(2), pages 289-301, August.
    17. Kouki, Chaaben & Babai, M. Zied & Minner, Stefan, 2018. "On the benefit of dual-sourcing in managing perishable inventory," International Journal of Production Economics, Elsevier, vol. 204(C), pages 1-17.
    18. Kawtummachai, Ruengsak & Van Hop, Nguyen, 2005. "Order allocation in a multiple-supplier environment," International Journal of Production Economics, Elsevier, vol. 93(1), pages 231-238, January.
    19. Mitra, Subrata, 2009. "Analysis of a two-echelon inventory system with returns," Omega, Elsevier, vol. 37(1), pages 106-115, February.
    20. Lamba, Kuldeep & Singh, Surya Prakash, 2019. "Dynamic supplier selection and lot-sizing problem considering carbon emissions in a big data environment," Technological Forecasting and Social Change, Elsevier, vol. 144(C), pages 573-584.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:208:y:2011:i:1:p:67-74. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.