The Simultaneous Planning of Production, Capacity, and Inventory in Seasonal Demand Environments
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.47.6.795
Download full text from publisher
References listed on IDEAS
- Gabriel R. Bitran & Elizabeth A. Haas & Arnoldo C. Hax, 1981. "Hierarchical Production Planning: A Single Stage System," Operations Research, INFORMS, vol. 29(4), pages 717-743, August.
- E. F. Peter Newson, 1975. "Multi-Item Lot Size Scheduling by Heuristic Part II: With Variable Resources," Management Science, INFORMS, vol. 21(10), pages 1194-1203, June.
- Hau L. Lee & Corey Billington & Brent Carter, 1993. "Hewlett-Packard Gains Control of Inventory and Service through Design for Localization," Interfaces, INFORMS, vol. 23(4), pages 1-11, August.
- L. S. Lasdon & R. C. Terjung, 1971. "An Efficient Algorithm for Multi-Item Scheduling," Operations Research, INFORMS, vol. 19(4), pages 946-969, August.
- Hau L. Lee & Corey Billington, 1993. "Material Management in Decentralized Supply Chains," Operations Research, INFORMS, vol. 41(5), pages 835-847, October.
- E. F. Peter Newson, 1975. "Multi-Item Lot Size Scheduling by Heuristic Part I: With Fixed Resources," Management Science, INFORMS, vol. 21(10), pages 1186-1193, June.
- Bernard P. Dzielinski & Ralph E. Gomory, 1965. "Optimal Programming of Lot Sizes, Inventory and Labor Allocations," Management Science, INFORMS, vol. 11(9), pages 874-890, July.
- Gabriel R. Bitran & Elizabeth A. Haas & Arnoldo C. Hax, 1982. "Hierarchical Production Planning: A Two-Stage System," Operations Research, INFORMS, vol. 30(2), pages 232-251, April.
- Werner Dinkelbach, 1967. "On Nonlinear Fractional Programming," Management Science, INFORMS, vol. 13(7), pages 492-498, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
- Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Bitran, Gabriel R. & Tirupati, Devanath., 1989. "Hierarchical production planning," Working papers 3017-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Tom Vogel & Bernardo Almada-Lobo & Christian Almeder, 2017. "Integrated versus hierarchical approach to aggregate production planning and master production scheduling," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 193-229, January.
- Tao Wu & Zhe Liang & Canrong Zhang, 2018. "Analytics Branching and Selection for the Capacitated Multi-Item Lot Sizing Problem with Nonidentical Machines," INFORMS Journal on Computing, INFORMS, vol. 30(2), pages 236-258, May.
- Golenko-Ginzburg, Dimitri & Sinuany-Stern, Zilla & Kats, Vladimir, 1996. "A multilevel decision-making system with multiple resources for controlling cotton harvesting," International Journal of Production Economics, Elsevier, vol. 46(1), pages 55-63, December.
- Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.
- Bouchriha, Hanen & Ouhimmou, Mustapha & D'Amours, Sophie, 2007. "Lot sizing problem on a paper machine under a cyclic production approach," International Journal of Production Economics, Elsevier, vol. 105(2), pages 318-328, February.
- Roy E. Marsten, 1975. "The Use of the Box Step Method in Discrete Optimization," NBER Working Papers 0086, National Bureau of Economic Research, Inc.
- Patriksson, Michael, 2008. "A survey on the continuous nonlinear resource allocation problem," European Journal of Operational Research, Elsevier, vol. 185(1), pages 1-46, February.
- Xue, Guisen & Felix Offodile, O. & Zhou, Hong & Troutt, Marvin D., 2011. "Integrated production planning with sequence-dependent family setup times," International Journal of Production Economics, Elsevier, vol. 131(2), pages 674-681, June.
- Beamon, Benita M., 1998. "Supply chain design and analysis:: Models and methods," International Journal of Production Economics, Elsevier, vol. 55(3), pages 281-294, August.
- James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
- Tian, Feng & Willems, Sean P. & Kempf, Karl G., 2011. "An iterative approach to item-level tactical production and inventory planning," International Journal of Production Economics, Elsevier, vol. 133(1), pages 439-450, September.
- Ngniatedema, Thomas & Shanker, Murali & Hu, Michael Y. & Guiffrida, Alfred L. & Eddy Patuwo, B., 2015. "Late customization strategy with service levels requirements," International Journal of Production Economics, Elsevier, vol. 166(C), pages 72-84.
- Samaddar, Subhashish & Rabinowitz, Gad & Zhang, Guoqiang Peter, 2005. "An experimental analysis of solution performance in a resource sharing and scheduling problem," European Journal of Operational Research, Elsevier, vol. 165(1), pages 139-156, August.
- Troy J Strader & Fu-ren Lin & Michael J Shaw, 1998. "Simulation of Order Fulfillment in Divergent Assembly Supply Chains," Journal of Artificial Societies and Social Simulation, Journal of Artificial Societies and Social Simulation, vol. 1(2), pages 1-5.
- Tibben-Lembke, Ronald S. & Bassok, Yehuda, 2005. "An inventory model for delayed customization: A hybrid approach," European Journal of Operational Research, Elsevier, vol. 165(3), pages 748-764, September.
- S. Selcuk Erenguc & H. Murat Mercan, 1990. "A multifamily dynamic lot‐sizing model with coordinated replenishments," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(4), pages 539-558, August.
More about this item
Keywords
production scheduling; planning; capacity and inventory planning; aggregate planning; inventory production; applications; capacity and inventory policies; programming/fractional; integer; mixed-integer; fractional;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:47:y:1999:i:6:p:795-806. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.