IDEAS home Printed from https://ideas.repec.org/a/inm/oropre/v30y1982i2p232-251.html
   My bibliography  Save this article

Hierarchical Production Planning: A Two-Stage System

Author

Listed:
  • Gabriel R. Bitran

    (Massachusetts Institute of Technology, Cambridge, Massachusetts)

  • Elizabeth A. Haas

    (McKinsey and Company, Boston, Massachusetts)

  • Arnoldo C. Hax

    (Massachusetts Institute of Technology, Cambridge, Massachusetts)

Abstract

This paper presents a hierarchical approach to plan and schedule production in a manufacturing environment that can be modeled as a two-stage process. A conceptual framework for this approach is described. The specific mathematical models proposed for the various hierarchical levels are discussed. The methodology is evaluated in an actual setting. The performance of the hierarchical system is contrasted with an MRP design. Encouraging results are reported.

Suggested Citation

  • Gabriel R. Bitran & Elizabeth A. Haas & Arnoldo C. Hax, 1982. "Hierarchical Production Planning: A Two-Stage System," Operations Research, INFORMS, vol. 30(2), pages 232-251, April.
  • Handle: RePEc:inm:oropre:v:30:y:1982:i:2:p:232-251
    DOI: 10.1287/opre.30.2.232
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/opre.30.2.232
    Download Restriction: no

    File URL: https://libkey.io/10.1287/opre.30.2.232?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mingxing Li & Ray Y. Zhong & Ting Qu & George Q. Huang, 2022. "Spatial–temporal out-of-order execution for advanced planning and scheduling in cyber-physical factories," Journal of Intelligent Manufacturing, Springer, vol. 33(5), pages 1355-1372, June.
    2. James R. Bradley & Peter W. Glynn, 2002. "Managing Capacity and Inventory Jointly in Manufacturing Systems," Management Science, INFORMS, vol. 48(2), pages 273-288, February.
    3. Tapia-Ubeda, Francisco J. & Miranda, Pablo A. & Macchi, Marco, 2018. "A Generalized Benders Decomposition based algorithm for an inventory location problem with stochastic inventory capacity constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 806-817.
    4. Malte Meistering & Hartmut Stadtler, 2020. "Stabilized-cycle strategy for a multi-item, capacitated, hierarchical production planning problem in rolling schedules," Business Research, Springer;German Academic Association for Business Research, vol. 13(1), pages 3-38, April.
    5. Bitran, Gabriel R. & Tirupati, Devanath., 1989. "Hierarchical production planning," Working papers 3017-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    6. Hans, E.W. & Herroelen, W. & Leus, R. & Wullink, G., 2007. "A hierarchical approach to multi-project planning under uncertainty," Omega, Elsevier, vol. 35(5), pages 563-577, October.
    7. Patriksson, Michael, 2008. "A survey on the continuous nonlinear resource allocation problem," European Journal of Operational Research, Elsevier, vol. 185(1), pages 1-46, February.
    8. Buxey, Geoff, 2003. "Strategy not tactics drives aggregate planning," International Journal of Production Economics, Elsevier, vol. 85(3), pages 331-346, September.
    9. Golenko-Ginzburg, Dimitri & Sinuany-Stern, Zilla & Kats, Vladimir, 1996. "A multilevel decision-making system with multiple resources for controlling cotton harvesting," International Journal of Production Economics, Elsevier, vol. 46(1), pages 55-63, December.
    10. Tian, Feng & Willems, Sean P. & Kempf, Karl G., 2011. "An iterative approach to item-level tactical production and inventory planning," International Journal of Production Economics, Elsevier, vol. 133(1), pages 439-450, September.
    11. Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
    12. James R. Bradley & Bruce C. Arntzen, 1999. "The Simultaneous Planning of Production, Capacity, and Inventory in Seasonal Demand Environments," Operations Research, INFORMS, vol. 47(6), pages 795-806, December.
    13. Pahl, Julia & Voß, Stefan, 2014. "Integrating deterioration and lifetime constraints in production and supply chain planning: A survey," European Journal of Operational Research, Elsevier, vol. 238(3), pages 654-674.
    14. Giovanni Pantuso & Kjetil Fagerholt & Stein W. Wallace, 2015. "Solving Hierarchical Stochastic Programs: Application to the Maritime Fleet Renewal Problem," INFORMS Journal on Computing, INFORMS, vol. 27(1), pages 89-102, February.
    15. Joachim Arts & Simme Flapper, 2015. "Aggregate overhaul and supply chain planning for rotables," Annals of Operations Research, Springer, vol. 224(1), pages 77-100, January.
    16. Julia Pahl & Stefan Voß & David Woodruff, 2007. "Production planning with load dependent lead times: an update of research," Annals of Operations Research, Springer, vol. 153(1), pages 297-345, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:30:y:1982:i:2:p:232-251. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.