A Tactical Planning Model for Mixed-Model Electronics Assembly Operations
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.47.3.395
Download full text from publisher
References listed on IDEAS
- Martin Desrochers & Jacques Desrosiers & Marius Solomon, 1992. "A New Optimization Algorithm for the Vehicle Routing Problem with Time Windows," Operations Research, INFORMS, vol. 40(2), pages 342-354, April.
- Marshall L. Fisher, 1981. "The Lagrangian Relaxation Method for Solving Integer Programming Problems," Management Science, INFORMS, vol. 27(1), pages 1-18, January.
- Ronald G. Askin & Moshe Dror & Asoo J. Vakharia, 1994. "Printed circuit board family grouping and component allocation for a multimachine, open‐shop assembly cell," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(5), pages 587-608, August.
- T. L. Magnanti & R. T. Wong, 1981. "Accelerating Benders Decomposition: Algorithmic Enhancement and Model Selection Criteria," Operations Research, INFORMS, vol. 29(3), pages 464-484, June.
- George B. Dantzig & Philip Wolfe, 1960. "Decomposition Principle for Linear Programs," Operations Research, INFORMS, vol. 8(1), pages 101-111, February.
- Shailendra Jain & M. Eric Johnson & Fereydoon Safai, 1996. "Implementing Setup Optimization on the Shop Floor," Operations Research, INFORMS, vol. 44(6), pages 843-851, December.
- Michael O. Ball & Michael J. Magazine, 1988. "Sequencing of Insertions in Printed Circuit Board Assembly," Operations Research, INFORMS, vol. 36(2), pages 192-201, April.
- J. E. King, 1999. "Introduction," Review of Political Economy, Taylor & Francis Journals, vol. 11(3), pages 251-255.
- Javad Ahmadi & Stephen Grotzinger & Dennis Johnson, 1988. "Component Allocation and Partitioning for a Dual Delivery Placement Machine," Operations Research, INFORMS, vol. 36(2), pages 176-191, April.
- Javad Ahmadi & Reza Ahmadi & Hirofumi Matsuo & Devanath Tirupati, 1995. "Component Fixture Positioning/Sequencing for Printed Circuit Board Assembly with Concurrent Operations," Operations Research, INFORMS, vol. 43(3), pages 444-457, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Choudhury, Nilanjan D. & Wilhelm, Wilbert E. & Rao, Brijesh & Gott, Jonathan & Khotekar, Nikhilesh, 2007. "Process planning for circuit card assembly on a series of dual head placement machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 626-639, October.
- Monkman, Susan K. & Morrice, Douglas J. & Bard, Jonathan F., 2008. "A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1100-1114, June.
- Heike, G. & Ramulu, M. & Sorenson, E. & Shanahan, P. & Moinzadeh, K., 2001. "Mixed model assembly alternatives for low-volume manufacturing: The case of the aerospace industry," International Journal of Production Economics, Elsevier, vol. 72(2), pages 103-120, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Altinkemer, Kemal & Kazaz, Burak & Koksalan, Murat & Moskowitz, Herbert, 2000. "Optimization of printed circuit board manufacturing: Integrated modeling and algorithms," European Journal of Operational Research, Elsevier, vol. 124(2), pages 409-421, July.
- Klomp, Cornelis & van de Klundert, Joris & Spieksma, Frits C. R. & Voogt, Siem, 2000. "The feeder rack assignment problem in PCB assembly: A case study," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 399-407, March.
- Ogbe, Emmanuel & Li, Xiang, 2017. "A new cross decomposition method for stochastic mixed-integer linear programming," European Journal of Operational Research, Elsevier, vol. 256(2), pages 487-499.
- Ahmadi, Reza H. & Kouvelis, Panagiotis, 1999. "Design of electronic assembly lines: An analytical framework and its application," European Journal of Operational Research, Elsevier, vol. 115(1), pages 113-137, May.
- George J. Kyparisis & Christos Koulamas, 2002. "Assembly-Line Scheduling with Concurrent Operations and Parallel Machines," INFORMS Journal on Computing, INFORMS, vol. 14(1), pages 68-80, February.
- Choudhury, Nilanjan D. & Wilhelm, Wilbert E. & Rao, Brijesh & Gott, Jonathan & Khotekar, Nikhilesh, 2007. "Process planning for circuit card assembly on a series of dual head placement machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 626-639, October.
- Sun, Dong-Seok & Lee, Tae-Eog & Kim, Kyung-Hoon, 2005. "Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool," International Journal of Production Economics, Elsevier, vol. 95(2), pages 245-264, February.
- Degraeve, Z. & Jans, R.F., 2003. "A New Dantzig-Wolfe Reformulation And Branch-And-Price Algorithm For The Capacitated Lot Sizing Problem With Set Up Times," ERIM Report Series Research in Management ERS-2003-010-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Issmail Elhallaoui & Daniel Villeneuve & François Soumis & Guy Desaulniers, 2005. "Dynamic Aggregation of Set-Partitioning Constraints in Column Generation," Operations Research, INFORMS, vol. 53(4), pages 632-645, August.
- Ayob, Masri & Kendall, Graham, 2008. "A survey of surface mount device placement machine optimisation: Machine classification," European Journal of Operational Research, Elsevier, vol. 186(3), pages 893-914, May.
- Crama, Yves & Flippo, Olaf E. & van de Klundert, Joris & Spieksma, Frits C. R., 1997. "The assembly of printed circuit boards: A case with multiple machines and multiple board types," European Journal of Operational Research, Elsevier, vol. 98(3), pages 457-472, May.
- Weijun Xie & Yanfeng Ouyang & Sze Chun Wong, 2016. "Reliable Location-Routing Design Under Probabilistic Facility Disruptions," Transportation Science, INFORMS, vol. 50(3), pages 1128-1138, August.
- Omid Shahvari & Rasaratnam Logendran & Madjid Tavana, 2022. "An efficient model-based branch-and-price algorithm for unrelated-parallel machine batching and scheduling problems," Journal of Scheduling, Springer, vol. 25(5), pages 589-621, October.
- Ibrahim Muter & Tevfik Aytekin, 2017. "Incorporating Aggregate Diversity in Recommender Systems Using Scalable Optimization Approaches," INFORMS Journal on Computing, INFORMS, vol. 29(3), pages 405-421, August.
- Klose, Andreas & Gortz, Simon, 2007. "A branch-and-price algorithm for the capacitated facility location problem," European Journal of Operational Research, Elsevier, vol. 179(3), pages 1109-1125, June.
- Spieksma, F.C.R. & Crama, Y. & van de Klundert, J. & Flippo, O.E., 1995. "The component retrieval problem in printed circuit board assembly," Research Memorandum 027, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Yao, Yu & Zhu, Xiaoning & Dong, Hongyu & Wu, Shengnan & Wu, Hailong & Carol Tong, Lu & Zhou, Xuesong, 2019. "ADMM-based problem decomposition scheme for vehicle routing problem with time windows," Transportation Research Part B: Methodological, Elsevier, vol. 129(C), pages 156-174.
- Pereira Lopes, Manuel J. & de Carvalho, J.M. Valerio, 2007. "A branch-and-price algorithm for scheduling parallel machines with sequence dependent setup times," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1508-1527, February.
- Fragkos, Ioannis & Cordeau, Jean-François & Jans, Raf, 2021. "Decomposition methods for large-scale network expansion problems," Transportation Research Part B: Methodological, Elsevier, vol. 144(C), pages 60-80.
- Monique Guignard, 2003. "Lagrangean relaxation," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 11(2), pages 151-200, December.
More about this item
Keywords
industry; computer/electronic; planning model for electronics assembly; production/scheduling; planning; parallel electronic assembly lines; programming; integer algorithms; column generation for technical production planning;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:47:y:1999:i:3:p:395-409. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.