IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v182y2007i2p626-639.html
   My bibliography  Save this article

Process planning for circuit card assembly on a series of dual head placement machines

Author

Listed:
  • Choudhury, Nilanjan D.
  • Wilhelm, Wilbert E.
  • Rao, Brijesh
  • Gott, Jonathan
  • Khotekar, Nikhilesh

Abstract

No abstract is available for this item.

Suggested Citation

  • Choudhury, Nilanjan D. & Wilhelm, Wilbert E. & Rao, Brijesh & Gott, Jonathan & Khotekar, Nikhilesh, 2007. "Process planning for circuit card assembly on a series of dual head placement machines," European Journal of Operational Research, Elsevier, vol. 182(2), pages 626-639, October.
  • Handle: RePEc:eee:ejores:v:182:y:2007:i:2:p:626-639
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(06)00891-5
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
    2. Anantaram Balakrishnan & François Vanderbeck, 1999. "A Tactical Planning Model for Mixed-Model Electronics Assembly Operations," Operations Research, INFORMS, vol. 47(3), pages 395-409, June.
    3. Ronald G. Askin & Moshe Dror & Asoo J. Vakharia, 1994. "Printed circuit board family grouping and component allocation for a multimachine, open‐shop assembly cell," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(5), pages 587-608, August.
    4. Altinkemer, Kemal & Kazaz, Burak & Koksalan, Murat & Moskowitz, Herbert, 2000. "Optimization of printed circuit board manufacturing: Integrated modeling and algorithms," European Journal of Operational Research, Elsevier, vol. 124(2), pages 409-421, July.
    5. Van Hop, Nguyen & Nagarur, Nagendra N., 2004. "The scheduling problem of PCBs for multiple non-identical parallel machines," European Journal of Operational Research, Elsevier, vol. 158(3), pages 577-594, November.
    6. Javad Ahmadi & Stephen Grotzinger & Dennis Johnson, 1988. "Component Allocation and Partitioning for a Dual Delivery Placement Machine," Operations Research, INFORMS, vol. 36(2), pages 176-191, April.
    7. Javad Ahmadi & Reza Ahmadi & Hirofumi Matsuo & Devanath Tirupati, 1995. "Component Fixture Positioning/Sequencing for Printed Circuit Board Assembly with Concurrent Operations," Operations Research, INFORMS, vol. 43(3), pages 444-457, June.
    8. Schaller, Jeffrey E. & Gupta, Jatinder N. D. & Vakharia, Asoo J., 2000. "Scheduling a flowline manufacturing cell with sequence dependent family setup times," European Journal of Operational Research, Elsevier, vol. 125(2), pages 324-339, September.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Anantaram Balakrishnan & François Vanderbeck, 1999. "A Tactical Planning Model for Mixed-Model Electronics Assembly Operations," Operations Research, INFORMS, vol. 47(3), pages 395-409, June.
    2. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    3. Sun, Dong-Seok & Lee, Tae-Eog & Kim, Kyung-Hoon, 2005. "Component allocation and feeder arrangement for a dual-gantry multi-head surface mounting placement tool," International Journal of Production Economics, Elsevier, vol. 95(2), pages 245-264, February.
    4. Klomp, Cornelis & van de Klundert, Joris & Spieksma, Frits C. R. & Voogt, Siem, 2000. "The feeder rack assignment problem in PCB assembly: A case study," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 399-407, March.
    5. Ayob, Masri & Kendall, Graham, 2008. "A survey of surface mount device placement machine optimisation: Machine classification," European Journal of Operational Research, Elsevier, vol. 186(3), pages 893-914, May.
    6. Yazdani Sabouni, M.T. & Logendran, Rasaratnam, 2013. "Carryover sequence-dependent group scheduling with the integration of internal and external setup times," European Journal of Operational Research, Elsevier, vol. 224(1), pages 8-22.
    7. Hamed Hendizadeh, S. & Faramarzi, Hamidreza & Mansouri, S.Afshin & Gupta, Jatinder N.D. & Y ElMekkawy, Tarek, 2008. "Meta-heuristics for scheduling a flowline manufacturing cell with sequence dependent family setup times," International Journal of Production Economics, Elsevier, vol. 111(2), pages 593-605, February.
    8. Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
    9. Allahverdi, Ali & Al-Anzi, Fawaz S., 2006. "A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times," European Journal of Operational Research, Elsevier, vol. 169(3), pages 767-780, March.
    10. Ahmadi, Reza H. & Kouvelis, Panagiotis, 1999. "Design of electronic assembly lines: An analytical framework and its application," European Journal of Operational Research, Elsevier, vol. 115(1), pages 113-137, May.
    11. Liou, Cheng-Dar & Hsieh, Yi-Chih, 2015. "A hybrid algorithm for the multi-stage flow shop group scheduling with sequence-dependent setup and transportation times," International Journal of Production Economics, Elsevier, vol. 170(PA), pages 258-267.
    12. George J. Kyparisis & Christos Koulamas, 2002. "Assembly-Line Scheduling with Concurrent Operations and Parallel Machines," INFORMS Journal on Computing, INFORMS, vol. 14(1), pages 68-80, February.
    13. Altinkemer, Kemal & Kazaz, Burak & Koksalan, Murat & Moskowitz, Herbert, 2000. "Optimization of printed circuit board manufacturing: Integrated modeling and algorithms," European Journal of Operational Research, Elsevier, vol. 124(2), pages 409-421, July.
    14. Monkman, Susan K. & Morrice, Douglas J. & Bard, Jonathan F., 2008. "A production scheduling heuristic for an electronics manufacturer with sequence-dependent setup costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 1100-1114, June.
    15. Bagchi, Tapan P. & Gupta, Jatinder N.D. & Sriskandarajah, Chelliah, 2006. "A review of TSP based approaches for flowshop scheduling," European Journal of Operational Research, Elsevier, vol. 169(3), pages 816-854, March.
    16. Crama, Yves & Flippo, Olaf E. & van de Klundert, Joris & Spieksma, Frits C. R., 1997. "The assembly of printed circuit boards: A case with multiple machines and multiple board types," European Journal of Operational Research, Elsevier, vol. 98(3), pages 457-472, May.
    17. Marko Ɖurasević & Domagoj Jakobović, 2019. "Creating dispatching rules by simple ensemble combination," Journal of Heuristics, Springer, vol. 25(6), pages 959-1013, December.
    18. Bozorgirad, Mir Abbas & Logendran, Rasaratnam, 2013. "Bi-criteria group scheduling in hybrid flowshops," International Journal of Production Economics, Elsevier, vol. 145(2), pages 599-612.
    19. Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
    20. Shahvari, Omid & Logendran, Rasaratnam, 2016. "Hybrid flow shop batching and scheduling with a bi-criteria objective," International Journal of Production Economics, Elsevier, vol. 179(C), pages 239-258.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:182:y:2007:i:2:p:626-639. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.