Simultaneous Resource Scheduling to Minimize Weighted Flow Times
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.37.4.592
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Reza Ahmadi & Uttarayan Bagchi & Thomas A. Roemer, 2005. "Coordinated scheduling of customer orders for quick response," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 493-512, September.
- Itai Gurvich & Jan A. Van Mieghem, 2015. "Collaboration and Multitasking in Networks: Architectures, Bottlenecks, and Capacity," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 16-33, February.
- Jingui Huang & Jianer Chen & Songqiao Chen & Jianxin Wang, 2007. "A simple linear time approximation algorithm for multi-processor job scheduling on four processors," Journal of Combinatorial Optimization, Springer, vol. 13(1), pages 33-45, January.
- Cha, Young-Ho & Kim, Yeong-Dae, 2010. "Fire scheduling for planned artillery attack operations under time-dependent destruction probabilities," Omega, Elsevier, vol. 38(5), pages 383-392, October.
- Jianer Chen & ChungâYee Lee, 1999. "General multiprocessor task scheduling," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 57-74, February.
- Khosla, Inder, 1995. "The scheduling problem where multiple machines compete for a common local buffer," European Journal of Operational Research, Elsevier, vol. 84(2), pages 330-342, July.
- Milind Dawande & Zhichao Feng & Ganesh Janakiraman, 2021. "On the Structure of Bottlenecks in Processes," Management Science, INFORMS, vol. 67(6), pages 3853-3870, June.
- Fumero, Francesca & Vercellis, Carlo, 1997. "Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation," International Journal of Production Economics, Elsevier, vol. 49(1), pages 45-54, March.
More about this item
Keywords
production/scheduling; sequencing; deterministic; multimachine: simultaneous resource scheduling; programming; integer; heuristic: simultaneous resource scheduling;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:37:y:1989:i:4:p:592-600. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.