Technical Note—Minimizing Average Flow Time with Parallel Machines
Author
Abstract
Suggested Citation
DOI: 10.1287/opre.21.3.846
Download full text from publisher
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Rabia Nessah & Chengbin Chu, 2010.
"Infinite split scheduling: a new lower bound of total weighted completion time on parallel machines with job release dates and unavailability periods,"
Annals of Operations Research, Springer, vol. 181(1), pages 359-375, December.
- R. Nessah & C. Chu, 2010. "Infinite split scheduling : a new lower bound of total weighted completion time on parallel machines with job release dates and unavailability periods," Post-Print hal-00572976, HAL.
- Dušan Knop & Martin Koutecký, 2018. "Scheduling meets n-fold integer programming," Journal of Scheduling, Springer, vol. 21(5), pages 493-503, October.
- Han Hoogeveen & Petra Schuurman & Gerhard J. Woeginger, 2001. "Non-Approximability Results for Scheduling Problems with Minsum Criteria," INFORMS Journal on Computing, INFORMS, vol. 13(2), pages 157-168, May.
- Leah Epstein & Ido Yatsiv, 2017. "Preemptive scheduling on uniformly related machines: minimizing the sum of the largest pair of job completion times," Journal of Scheduling, Springer, vol. 20(2), pages 115-127, April.
- Marcin Siepak & Jerzy Józefczyk, 2014. "Solution algorithms for unrelated machines minmax regret scheduling problem with interval processing times and the total flow time criterion," Annals of Operations Research, Springer, vol. 222(1), pages 517-533, November.
- Tjark Vredeveld & Cor Hurkens, 2002. "Experimental Comparison of Approximation Algorithms for Scheduling Unrelated Parallel Machines," INFORMS Journal on Computing, INFORMS, vol. 14(2), pages 175-189, May.
- Jiang, Xiaojuan & Lee, Kangbok & Pinedo, Michael L., 2021. "Ideal schedules in parallel machine settings," European Journal of Operational Research, Elsevier, vol. 290(2), pages 422-434.
- Ali Allahverdi & John Mittenthal, 1994. "Scheduling on M parallel machines subject to random breakdowns to minimize expected mean flow time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(5), pages 677-682, August.
- Cole, Richard & Correa, Jose & Gkatzelis, Vasillis & Mirrokni, Vahab & Olver, Neil, 2015. "Decentralized utilitarian mechanisms for scheduling games," LSE Research Online Documents on Economics 103081, London School of Economics and Political Science, LSE Library.
- Lenstra, J. K. & Rinnooy Kan, A. H. G., 1980. "An Introduction To Multiprocessor Scheduling," Econometric Institute Archives 272258, Erasmus University Rotterdam.
- Zhi-Long Chen & Guruprasad Pundoor, 2006. "Order Assignment and Scheduling in a Supply Chain," Operations Research, INFORMS, vol. 54(3), pages 555-572, June.
- Celia A. Glass & Hans Kellerer, 2007. "Parallel machine scheduling with job assignment restrictions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(3), pages 250-257, April.
- Felipe T. Muñoz & Guillermo Latorre-Núñez & Mario Ramos-Maldonado, 2023. "Developing New Bounds for the Performance Guarantee of the Jump Neighborhood for Scheduling Jobs on Uniformly Related Machines," Mathematics, MDPI, vol. 12(1), pages 1-16, December.
- Ravindran Vijayalakshmi, Vipin & Schröder, Marc & Tamir, Tami, 2024. "Minimizing total completion time with machine-dependent priority lists," European Journal of Operational Research, Elsevier, vol. 315(3), pages 844-854.
- T.C. Edwin Cheng & Qing Ding & Mikhail Y. Kovalyov & Aleksander Bachman & Adam Janiak, 2003. "Scheduling jobs with piecewise linear decreasing processing times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(6), pages 531-554, September.
- Juntaek Hong & Kangbok Lee & Michael L. Pinedo, 2020. "Scheduling equal length jobs with eligibility restrictions," Annals of Operations Research, Springer, vol. 285(1), pages 295-314, February.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:oropre:v:21:y:1973:i:3:p:846-847. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.