Real-time schedule adjustment decisions: a case study
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Fred F. Easton & Donald F. Rossin, 1991. "Sufficient Working Subsets for the Tour Scheduling Problem," Management Science, INFORMS, vol. 37(11), pages 1441-1451, November.
- Michael J. Brusco & Larry W. Jacobs & Robert J. Bongiorno & Duane V. Lyons & Baoxing Tang, 1995. "Improving Personnel Scheduling at Airline Stations," Operations Research, INFORMS, vol. 43(5), pages 741-751, October.
- Michael J. Brusco & Larry W. Jacobs, 2000. "Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling," Management Science, INFORMS, vol. 46(12), pages 1630-1641, December.
- Srinagesh Gavirneni & Roman Kapuscinski & Sridhar Tayur, 1999. "Value of Information in Capacitated Supply Chains," Management Science, INFORMS, vol. 45(1), pages 16-24, January.
- Jackie Hueter & William Swart, 1998. "An Integrated Labor-Management System for Taco Bell," Interfaces, INFORMS, vol. 28(1), pages 75-91, February.
- Ahmad I. Z. Jarrah & Jonathan F. Bard & Anura H. deSilva, 1994. "Solving Large-Scale Tour Scheduling Problems," Management Science, INFORMS, vol. 40(9), pages 1124-1144, September.
- Robert R. Love & James M. Hoey, 1990. "Management Science Improves Fast-Food Operations," Interfaces, INFORMS, vol. 20(2), pages 21-29, April.
- E. H. Bowman, 1963. "Consistency and Optimality in Managerial Decision Making," Management Science, INFORMS, vol. 9(2), pages 310-321, January.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- TANASE, George Cosmin, 2014. "The Value Contribution of Service Capacity Management to the Company s Operations and Performance," Romanian Distribution Committee Magazine, Romanian Distribution Committee, vol. 5(4), pages 14-18, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Michael J. Brusco & Larry W. Jacobs, 2000. "Optimal Models for Meal-Break and Start-Time Flexibility in Continuous Tour Scheduling," Management Science, INFORMS, vol. 46(12), pages 1630-1641, December.
- Michael J. Brusco & Larry W. Jacobs, 1998. "Personnel Tour Scheduling When Starting-Time Restrictions Are Present," Management Science, INFORMS, vol. 44(4), pages 534-547, April.
- Oyku Ahipasaoglu & Nesim Erkip & Oya Ekin Karasan, 2019. "The venue management problem: setting staffing levels, shifts and shift schedules at concession stands," Journal of Scheduling, Springer, vol. 22(1), pages 69-83, February.
- Easton, Fred F. & Mansour, Nashat, 1999. "A distributed genetic algorithm for deterministic and stochastic labor scheduling problems," European Journal of Operational Research, Elsevier, vol. 118(3), pages 505-523, November.
- Scott E. Sampson, 2008. "OR PRACTICE---Optimization of Vacation Timeshare Scheduling," Operations Research, INFORMS, vol. 56(5), pages 1079-1088, October.
- Haase, Knut, 1999. "Retail business staff scheduling under complex labor relations," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 511, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Aykin, Turgut, 2000. "A comparative evaluation of modeling approaches to the labor shift scheduling problem," European Journal of Operational Research, Elsevier, vol. 125(2), pages 381-397, September.
- Ferdinand Kiermaier & Markus Frey & Jonathan F. Bard, 2020. "The flexible break assignment problem for large tour scheduling problems with an application to airport ground handlers," Journal of Scheduling, Springer, vol. 23(2), pages 177-209, April.
- Peters, Emmanuel & de Matta, Renato & Boe, Warren, 2007. "Short-term work scheduling with job assignment flexibility for a multi-fleet transport system," European Journal of Operational Research, Elsevier, vol. 180(1), pages 82-98, July.
- Brusco, Michael J. & Johns, Tony R., 1996. "A sequential integer programming method for discontinuous labor tour scheduling," European Journal of Operational Research, Elsevier, vol. 95(3), pages 537-548, December.
- Gary M. Thompson, 1997. "Labor staffing and scheduling models for controlling service levels," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 719-740, December.
- Lagodimos, A. G. & Leopoulos, V., 2000. "Greedy heuristic algorithms for manpower shift planning," International Journal of Production Economics, Elsevier, vol. 68(1), pages 95-106, October.
- María I. Restrepo & Bernard Gendron & Louis-Martin Rousseau, 2016. "Branch-and-Price for Personalized Multiactivity Tour Scheduling," INFORMS Journal on Computing, INFORMS, vol. 28(2), pages 334-350, May.
- Mark W. Isken & Osman T. Aydas, 2022. "A tactical multi-week implicit tour scheduling model with applications in healthcare," Health Care Management Science, Springer, vol. 25(4), pages 551-573, December.
- Thompson, Gary M. & Pullman, Madeleine E., 2007. "Scheduling workforce relief breaks in advance versus in real-time," European Journal of Operational Research, Elsevier, vol. 181(1), pages 139-155, August.
- Brusco, Michael J., 2015. "A bicriterion algorithm for the allocation of cross-trained workers based on operational and human resource objectives," European Journal of Operational Research, Elsevier, vol. 247(1), pages 46-59.
- Hua Ni & Hernán Abeledo, 2007. "A branch-and-price approach for large-scale employee tour scheduling problems," Annals of Operations Research, Springer, vol. 155(1), pages 167-176, November.
- Najmaddin Akhundov & Nail Tahirov & Christoph H. Glock, 2022. "Optimal Scheduling of Waitstaff with Different Experience Levels at a Restaurant Chain," Interfaces, INFORMS, vol. 52(4), pages 324-343, July.
- Cai, X. & Li, K. N., 2000. "A genetic algorithm for scheduling staff of mixed skills under multi-criteria," European Journal of Operational Research, Elsevier, vol. 125(2), pages 359-369, September.
- Gerard M. Campbell, 1999. "Cross-Utilization of Workers Whose Capabilities Differ," Management Science, INFORMS, vol. 45(5), pages 722-732, May.
More about this item
Keywords
Service operations Case study Labor scheduling Schedule adjustment decision;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:jomega:v:32:y:2004:i:5:p:333-344. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/375/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.