IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v30y1984i12p1442-1458.html
   My bibliography  Save this article

Maximization of Labor Productivity Through Optimal Rest-Break Schedules

Author

Listed:
  • Stephen E. Bechtold

    (College of Business, Florida State University, Tallahassee, Florida 32306)

  • Ralph E. Janaro

    (Department of Management, Clarkson University, Potsdam, New York 13676)

  • De Witt L. Sumners

    (Department of Mathematics, Florida State University, Tallahassee, Florida 32306)

Abstract

This paper focuses upon the maximization of labor productivity through selection of the optimal number, duration, and placement of rest breaks. It is demonstrated that resolution of the limited validity associated with previous models leads to a mixed-integer quadratic programming formulation of this problem. Efficient analytic procedures are developed which allow solutions to be obtained in minutes using a hand-held calculator. Then, the characteristics, properties, and potential effectiveness of optimal solutions are examined through an illustration from an existing work environment. Issues relevant to the implementation of the models are presented in a summary of an initial experiment in which one of the models in this paper was used to select rest break policy. The results of this experiment indicated that the output achieved using the model's policy was 13% higher than the output achieved when the subjects used their own rest break policies. Several future research topics are also identified.

Suggested Citation

  • Stephen E. Bechtold & Ralph E. Janaro & De Witt L. Sumners, 1984. "Maximization of Labor Productivity Through Optimal Rest-Break Schedules," Management Science, INFORMS, vol. 30(12), pages 1442-1458, December.
  • Handle: RePEc:inm:ormnsc:v:30:y:1984:i:12:p:1442-1458
    DOI: 10.1287/mnsc.30.12.1442
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.30.12.1442
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.30.12.1442?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Janiak, Adam & Kovalyov, Mikhail Y., 2006. "Scheduling in a contaminated area: A model and polynomial algorithms," European Journal of Operational Research, Elsevier, vol. 173(1), pages 125-132, August.
    2. A Janiak & M Y Kovalyov, 2008. "Scheduling jobs in a contaminated area: a model and heuristic algorithms," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(7), pages 977-987, July.
    3. André Scholz & Johannes Wendsche & Argang Ghadiri & Usha Singh & Theo Peters & Stefan Schneider, 2019. "Methods in Experimental Work Break Research: A Scoping Review," IJERPH, MDPI, vol. 16(20), pages 1-23, October.
    4. Xu, Shuling & Hall, Nicholas G., 2021. "Fatigue, personnel scheduling and operations: Review and research opportunities," European Journal of Operational Research, Elsevier, vol. 295(3), pages 807-822.
    5. Manel Baucells & Lin Zhao, 2019. "It Is Time to Get Some Rest," Management Science, INFORMS, vol. 65(4), pages 1717-1734, April.
    6. Svend Erik Mathiassen & David M Hallman & Eugene Lyskov & Staffan Hygge, 2014. "Can Cognitive Activities during Breaks in Repetitive Manual Work Accelerate Recovery from Fatigue? A Controlled Experiment," PLOS ONE, Public Library of Science, vol. 9(11), pages 1-11, November.
    7. Thompson, Gary M. & Pullman, Madeleine E., 2007. "Scheduling workforce relief breaks in advance versus in real-time," European Journal of Operational Research, Elsevier, vol. 181(1), pages 139-155, August.
    8. Thompson, Gary M. & Goodale, John C., 2006. "Variable employee productivity in workforce scheduling," European Journal of Operational Research, Elsevier, vol. 170(2), pages 376-390, April.
    9. Sheng Yu, 2015. "An optimal single-machine scheduling with linear deterioration rate and rate-modifying activities," Journal of Combinatorial Optimization, Springer, vol. 30(2), pages 242-252, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:30:y:1984:i:12:p:1442-1458. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.