IDEAS home Printed from https://ideas.repec.org/a/inm/orinte/v30y2000i3p125-142.html
   My bibliography  Save this article

Supply-Chain Management for Recoverable Manufacturing Systems

Author

Listed:
  • V. Daniel R. Guide

    (A. J. Palumbo School of Business Administration, 920 Rockwell Hall, Duquesne University, Pittsburgh, Pennsylvania 15282)

  • Vaidyanathan Jayaraman

    (Department of Management and Systems, Washington State University, Vancouver, Washington 98686)

  • Rajesh Srivastava

    (Department of Graduate Logistics Management, Graduate School of Logistics and Acquisition Management, Air Force Institute of Technology WPAFB, Ohio 45433-7765)

  • W. C. Benton

    (Department of Management Science, Fisher College of Business, Ohio State University, Columbus, Ohio 43210-1399)

Abstract

Recoverable manufacturing systems minimize the environmental impact of industry by reusing materials, reducing energy use, and reducing the need to landfill industrial products. These systems are widespread in the United States and are profitable, in addition to contributing to sustainable development. However, the management of supply-chain activities can differ greatly from management activities in traditional manufacturing supply chains. Seven complicating characteristics increase uncertainty. Managers must take actions to reduce uncertainty in the timing and quantity of returns, balance return rates with demand rates, and make material recovery more predictable. Managers must also plan for the collection of products from end-users. The use of information systems with new production-planning and control techniques makes management of these activities more predictable.

Suggested Citation

  • V. Daniel R. Guide & Vaidyanathan Jayaraman & Rajesh Srivastava & W. C. Benton, 2000. "Supply-Chain Management for Recoverable Manufacturing Systems," Interfaces, INFORMS, vol. 30(3), pages 125-142, June.
  • Handle: RePEc:inm:orinte:v:30:y:2000:i:3:p:125-142
    DOI: 10.1287/inte.30.3.125.11656
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/inte.30.3.125.11656
    Download Restriction: no

    File URL: https://libkey.io/10.1287/inte.30.3.125.11656?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Guide, V. Daniel R. & Kraus, Mark E. & Srivastava, Rajesh, 1997. "Scheduling policies for remanufacturing," International Journal of Production Economics, Elsevier, vol. 48(2), pages 187-204, January.
    2. Ayres, Robert & Ferrer, Geraldo & Van Leynseele, Tania, 1997. "Eco-efficiency, asset recovery and remanufacturing," European Management Journal, Elsevier, vol. 15(5), pages 557-574, October.
    3. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    4. van der Laan, Erwin & Dekker, Rommert & Salomon, Marc & Ridder, Ad, 1996. "An (s, Q) inventory model with remanufacturing and disposal," International Journal of Production Economics, Elsevier, vol. 46(1), pages 339-350, December.
    5. Richter, Knut, 1996. "The extended EOQ repair and waste disposal model," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 443-447, August.
    6. van der Laan, Erwin & Salomon, Marc, 1997. "Production planning and inventory control with remanufacturing and disposal," European Journal of Operational Research, Elsevier, vol. 102(2), pages 264-278, October.
    7. V Jayaraman & V D R Guide & R Srivastava, 1999. "A closed-loop logistics model for remanufacturing," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(5), pages 497-508, May.
    8. van der Laan, Erwin & Dekker, Rommert & Salomon, Marc, 1996. "Product remanufacturing and disposal: A numerical comparison of alternative control strategies," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 489-498, August.
    9. Spengler, Th. & Puchert, H. & Penkuhn, T. & Rentz, O., 1997. "Environmental integrated production and recycling management," European Journal of Operational Research, Elsevier, vol. 97(2), pages 308-326, March.
    10. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    11. Richter, Knut, 1996. "The EOQ repair and waste disposal model with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 95(2), pages 313-324, December.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fleischmann, Moritz & Bloemhof-Ruwaard, Jacqueline M. & Dekker, Rommert & van der Laan, Erwin & van Nunen, Jo A. E. E. & Van Wassenhove, Luk N., 1997. "Quantitative models for reverse logistics: A review," European Journal of Operational Research, Elsevier, vol. 103(1), pages 1-17, November.
    2. Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
    3. Z P Bayındır & N Erkip & R Güllü, 2005. "Assessing the benefits of remanufacturing option under one-way substitution," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 286-296, March.
    4. Ching-Chin Chern & Hsin-Mei Wang & Kwei-Long Huang, 2017. "A heuristic master planning algorithm for recycling supply chain management," Journal of Intelligent Manufacturing, Springer, vol. 28(4), pages 985-1003, April.
    5. Bayindir, Z.P. & Erkip, N. & Gullu, R., 2003. "Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint," Econometric Institute Research Papers EI 2003-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    6. Teunter, Ruud H. & Vlachos, Dimitrios, 2002. "On the necessity of a disposal option for returned items that can be remanufactured," International Journal of Production Economics, Elsevier, vol. 75(3), pages 257-266, February.
    7. Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
    8. Gregory A. DeCroix, 2006. "Optimal Policy for a Multiechelon Inventory System with Remanufacturing," Operations Research, INFORMS, vol. 54(3), pages 532-543, June.
    9. Poles, Roberto, 2013. "System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies," International Journal of Production Economics, Elsevier, vol. 144(1), pages 189-199.
    10. Gou, Qinglong & Liang, Liang & Huang, Zhimin & Xu, Chuanyong, 2008. "A joint inventory model for an open-loop reverse supply chain," International Journal of Production Economics, Elsevier, vol. 116(1), pages 28-42, November.
    11. Ruud H. Teunter, 2001. "Economic ordering quantities for recoverable item inventory systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(6), pages 484-495, September.
    12. Omar, Mohd & Yeo, Ivan, 2009. "A model for a production-repair system under a time-varying demand process," International Journal of Production Economics, Elsevier, vol. 119(1), pages 17-23, May.
    13. Pokharel, Shaligram & Mutha, Akshay, 2009. "Perspectives in reverse logistics: A review," Resources, Conservation & Recycling, Elsevier, vol. 53(4), pages 175-182.
    14. Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
    15. Daniel, V. & Guide, R. Jr., 1997. "Scheduling with priority dispatching rules and drum-buffer-rope in a recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 53(1), pages 101-116, November.
    16. Kaya, Onur, 2010. "Incentive and production decisions for remanufacturing operations," European Journal of Operational Research, Elsevier, vol. 201(2), pages 442-453, March.
    17. Richter, Knut & Dobos, Imre, 1999. "Analysis of the EOQ repair and waste disposal problem with integer setup numbers," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 463-467, March.
    18. Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik, 2003. "A model to evaluate inventory costs in a remanufacturing environment," International Journal of Production Economics, Elsevier, vol. 81(1), pages 597-607, January.
    19. Abdelkader Sbihi & Richard Eglese, 2010. "Combinatorial optimization and Green Logistics," Annals of Operations Research, Springer, vol. 175(1), pages 159-175, March.
    20. Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orinte:v:30:y:2000:i:3:p:125-142. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.