Author
Listed:
- Antoine Legrain
(Polytechnique Montreal, Montreal, Quebec H3T 1J4, Canada; CIRRELT, Montreal, Quebec H3T 1J4, Canada; GERAD, Montreal, Quebec H3T 1J4, Canada)
- Jérémy Omer
(University Rennes, INSA Rennes, CNRS, IRMAR, UMR 6625, Rennes 35000, France)
Abstract
In this paper, we describe a branch-and-price algorithm for the personalized nurse scheduling problem. The variants that appear in the literature involve a large number of constraints that can be hard or soft, meaning that they can be violated at the price of a penalty. We capture the diversity of the constraints on individual schedules by seven generic constraints characterized by lower and upper bounds on a given quantity. The core of the column generation procedure is in the identification of individual schedules with minimum reduced cost. For this, we solve a shortest path problem with resource constraints (SPPRC) where several generic constraints are modeled as resource constraints. We then describe dominance rules adapted to the presence of both upper and lower bounds on the resources and leverage soft constraints to improve the dominance. We also describe several acceleration techniques for the solution of the SPPRC, and branching rules that fit the specificities of the problem. Our numerical experiments are based on the instances of three benchmarks of the literature including those of the two international nurse rostering competitions (INRC-I and INRC-II). Their objective is threefold: assess the dominance rules and the acceleration techniques, investigate the capacity of the algorithm to find provable optimal solutions of instances that are still open, and conduct a comparison with best published results. The most noticeable conclusion is that the improved solution of the SPPRC allows to solve optimally all the INRC-II instances where a four-week planning horizon is considered and 40% of the eight-week instances.
Suggested Citation
Antoine Legrain & Jérémy Omer, 2024.
"A Dedicated Pricing Algorithm to Solve a Large Family of Nurse Scheduling Problems with Branch-and-Price,"
INFORMS Journal on Computing, INFORMS, vol. 36(4), pages 1108-1128, July.
Handle:
RePEc:inm:orijoc:v:36:y:2024:i:4:p:1108-1128
DOI: 10.1287/ijoc.2023.0019
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:orijoc:v:36:y:2024:i:4:p:1108-1128. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.