Fuzzy Clustering With Derivative–Free Search Algorithm for Location of Biogas Energy Systems
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Stern, Helman I. & Avivi, Zion, 1990. "The selection and scheduling of textile orders with due dates," European Journal of Operational Research, Elsevier, vol. 44(1), pages 11-16, January.
- Framinan, Jose M. & Ruiz, Rubén, 2010. "Architecture of manufacturing scheduling systems: Literature review and an integrated proposal," European Journal of Operational Research, Elsevier, vol. 205(2), pages 237-246, September.
- Ehsan Ardjmand & Iman Ghalehkhondabi & Gary R. Weckman & William A. Young II, 2016. "Application of decision support systems in scheduling/planning of manufacturing/service systems: a critical review," International Journal of Management and Decision Making, Inderscience Enterprises Ltd, vol. 15(3/4), pages 248-276.
- Li, Heng & Li, Zhicheng & Li, Ling X. & Hu, Bin, 2000. "A production rescheduling expert simulation system," European Journal of Operational Research, Elsevier, vol. 124(2), pages 283-293, July.
- Ioanna Makarouni & John Psarras & Eleftherios Siskos, 2015. "Interactive bicriterion decision support for a large scale industrial scheduling system," Annals of Operations Research, Springer, vol. 227(1), pages 45-61, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Slotnick, Susan A., 2011. "Order acceptance and scheduling: A taxonomy and review," European Journal of Operational Research, Elsevier, vol. 212(1), pages 1-11, July.
- Alejandra Duenas & Dobrila Petrovic, 2008. "An approach to predictive-reactive scheduling of parallel machines subject to disruptions," Annals of Operations Research, Springer, vol. 159(1), pages 65-82, March.
- Framinan, Jose M. & Ruiz, Rubén, 2010. "Architecture of manufacturing scheduling systems: Literature review and an integrated proposal," European Journal of Operational Research, Elsevier, vol. 205(2), pages 237-246, September.
- Wang, John & Yan, Ruiliang & Hollister, Kimberly & Zhu, Dan, 2008. "A historic review of management science research in China," Omega, Elsevier, vol. 36(6), pages 919-932, December.
- Nepal, Bimal & Monplaisir, Leslie & Famuyiwa, Oluwafemi, 2012. "Matching product architecture with supply chain design," European Journal of Operational Research, Elsevier, vol. 216(2), pages 312-325.
- Zaumanis, Martins & Mallick, Rajib B. & Frank, Robert, 2014. "100% recycled hot mix asphalt: A review and analysis," Resources, Conservation & Recycling, Elsevier, vol. 92(C), pages 230-245.
- Peng Wu & Junheng Cheng & Feng Chu, 2021. "Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristics," Annals of Operations Research, Springer, vol. 296(1), pages 471-494, January.
- Thomas, Andre & Charpentier, Patrick, 2005. "Reducing simulation models for scheduling manufacturing facilities," European Journal of Operational Research, Elsevier, vol. 161(1), pages 111-125, February.
- Oosterlinck, Dieter & Benoit, Dries F. & Baecke, Philippe, 2020. "From one-class to two-class classification by incorporating expert knowledge: Novelty detection in human behaviour," European Journal of Operational Research, Elsevier, vol. 282(3), pages 1011-1024.
- Shih, Han M., 2014. "Migrating product structure bill of materials Excel files to STEP PDM implementation," International Journal of Information Management, Elsevier, vol. 34(4), pages 489-516.
- Chen, Wenchong & Gong, Xuejian & Rahman, Humyun Fuad & Liu, Hongwei & Qi, Ershi, 2021. "Real-time order acceptance and scheduling for data-enabled permutation flow shops: Bilevel interactive optimization with nonlinear integer programming," Omega, Elsevier, vol. 105(C).
- Baş, Seda & Carello, Giuliana & Lanzarone, Ettore & Yalçındağ, Semih, 2018. "An appointment scheduling framework to balance the production of blood units from donation," European Journal of Operational Research, Elsevier, vol. 265(3), pages 1124-1143.
- Romero-Silva, Rodrigo & Hernández-López, Gabriel, 2020. "Shop-floor scheduling as a competitive advantage: A study on the relevance of cyber-physical systems in different manufacturing contexts," International Journal of Production Economics, Elsevier, vol. 224(C).
- Bruccoleri, Manfredi & Pasek, Zbigniew J. & Koren, Yoram, 2006. "Operation management in reconfigurable manufacturing systems: Reconfiguration for error handling," International Journal of Production Economics, Elsevier, vol. 100(1), pages 87-100, March.
- Ioanna Makarouni & Eleftherios Siskos & John Psarras, 2016. "Multiobjective large scale job sequencing optimization based on a synergy of compensatory and non compensatory methods," Operational Research, Springer, vol. 16(2), pages 223-244, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:igg:joris0:v:12:y:2021:i:4:p:1-19. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Journal Editor (email available below). General contact details of provider: https://www.igi-global.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.