A new bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates

Author

Listed:
  • Mehdi Abedi
  • Hany Seidgar

Abstract

This paper considers pre-emption in single machine scheduling problem with batch delivery and release times in which due dates are controllable as realistic assumptions in the manufacturing environment. The objective is to minimise the lateness, holding, delivery and due date assignment costs. In this study set up time is independent and it follows of a function based on the number of loading on machine in each batch. We proposed a new solution methodology, as this problem is proven to be NP-hard, hence two meta-heuristics namely: bi-level double genetic algorithm (BDGA) and bi-level hybrid genetic and simulated annealing algorithms (BSGA) are employed for solving the problem. Taguchi method is applied to tune the parameters of proposed algorithms. The performance of the proposed algorithms are measured in terms of relative percent deviation (RPD) and computational time, the computational results reveal that statistically BDGA is better than BSGA based on RPD and computational time.

Suggested Citation

  • Mehdi Abedi & Hany Seidgar, 2016. "A new bi-level meta-heuristic approach for a single machine JIT-scheduling in the batch delivery system with controllable due dates," International Journal of Services and Operations Management, Inderscience Enterprises Ltd, vol. 23(2), pages 135-152.
  • Handle: RePEc:ids:ijsoma:v:23:y:2016:i:2:p:135-152
    as

    Download full text from publisher

    File URL: http://www.inderscience.com/link.php?id=74052
    Download Restriction: Access to full text is restricted to subscribers.
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mohammad Rostami & Milad Mohammadi, 2024. "Two-machine decentralized flow shop scheduling problem with inter-factory batch delivery system," Operational Research, Springer, vol. 24(3), pages 1-37, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ids:ijsoma:v:23:y:2016:i:2:p:135-152. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sarah Parker (email available below). General contact details of provider: http://www.inderscience.com/browse/index.php?journalID=150 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.