Change Order Management Factors in Building Projects in Northern Nigeria

Author

Listed:
  • Richard A. Kolawole
  • Kamau K. Peter
  • Munala Gerryshom

Abstract

A change is an amendment or addition with respect to the original plans, specification or other contract documents and vital factor in construction project management. A change order is an instruction from an employer approving a change. Construction projects in Nigeria have suffered deleteriously as a consequence of extensive change orders, which has manifested in cost and time overruns, disputes, arbitration, litigation and even the abandonment of projects and this negatively impacts on the efficiency of the Nigerian construction industry.This paper explore the extent change order management strategies correlate with overall building project in Nigeria. Thirty strategies for managing change order were identified through intensive literature search. Twenty -one factors peculiar to the Nigerian construction industry were used to develop a questionnaire. A total of 323 questionnaires were administered through stratified random sampling to respondents in the cities of Abuja, Kano and Bauchi. The study targeted construction Consultants namely Architects, Quantity Surveyors Building Engineers, Service Engineer (Electrical & Mechanical), Contractor and Building owners in three sub-study cities. The study recorded an overall response rate of 80.8 %. Using SPSS version 22, the questionnaire was subjected to reliability test. Statistical analysis was used using average index; spearman correlation coefficient; factor analysis and multiple regression were used to analysis data from survey questionnaire. The study reveal that change orders are better manage at the design stage and that clear and thorough project brief, better initial planning and thorough detailing of design are the three topmost management strategies. The study established that overall project success is impacted by change order management with a R2 of 0.252, meaning that change order management at the design stage accounts for 25.2% of the variation in building project outcomes. The Spearman's (rho) also show strong agreement among respondents. The study concluded that proper adoption and use of project implementation phase principles by project sponsor, increased effort at the design stage of projects by project participant and allocation of adequate resources to project requirement will help minimize change orders in project delivery in Northern Nigeria.

Suggested Citation

  • Richard A. Kolawole & Kamau K. Peter & Munala Gerryshom, 2016. "Change Order Management Factors in Building Projects in Northern Nigeria," Asian Social Science, Canadian Center of Science and Education, vol. 12(1), pages 223-236, January.
  • Handle: RePEc:ibn:assjnl:v:12:y:2016:i:1:p:223-236
    as

    Download full text from publisher

    File URL: http://www.ccsenet.org/journal/index.php/ass/article/view/54279
    Download Restriction: no

    File URL: http://www.ccsenet.org/journal/index.php/ass/article/view/54279
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Albert Chan, 2000. "Evaluation of enhanced design and build system - a case study of a hospital project," Construction Management and Economics, Taylor & Francis Journals, vol. 18(7), pages 863-871.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Xiao-Hua Jin & Florence Yean Yng Ling, 2005. "Constructing a framework for building relationships and trust in project organizations: two case studies of building projects in China," Construction Management and Economics, Taylor & Francis Journals, vol. 23(7), pages 685-696.
    2. Albert Chan & Esther Yung & Patrick Lam & C. M. Tam & S. O. Cheung, 2001. "Application of Delphi method in selection of procurement systems for construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 19(7), pages 699-718.
    3. Olabode Gafar Babalola & Mohammad Masfiqul Alam Bhuiyan & Ahmed Hammad, 2024. "Literature Review on Collaborative Project Delivery for Sustainable Construction: Bibliometric Analysis," Sustainability, MDPI, vol. 16(17), pages 1-36, September.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ibn:assjnl:v:12:y:2016:i:1:p:223-236. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Canadian Center of Science and Education (email available below). General contact details of provider: https://edirc.repec.org/data/cepflch.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.