IDEAS home Printed from https://ideas.repec.org/a/hin/complx/5410978.html
   My bibliography  Save this article

Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network

Author

Listed:
  • Libiao Bai
  • Kaimin Zhang
  • Huijing Shi
  • Min An
  • Xiao Han

Abstract

Resource risk caused by specific resource sharing or competition among projects due to resource constraints is a major issue in project portfolio management, which challenges the application of risk analysis methods effectively. This paper presents a methodology by using a fuzzy Bayesian network to assess the project portfolio resource risk, determine critical resource risk factors, and propose risk-reduction strategies. In this method, the project portfolio resource risk factors are first identified by taking project interdependency into consideration, and then the Bayesian network model is developed to analyze the risk level of the identified risk factors in which expert judgments and fuzzy set theory are integrated to determine the probabilities of all risk factors to deal with incomplete risk data and information. To reduce the subjectivity of expert judgments, the expert weights are determined by combining experts’ background and reliability degree of expert judgments. A numerical analysis is used to demonstrate the application of the proposed methodology. The results show that project portfolio resource risks can be analyzed effectively and efficiently. Furthermore, “poor communication and cooperation among projects,” “capital difficulty,” and “lack of sharing technology among projects” are considered the leading factors of the project portfolio resource risk. Risk-reduction strategic decisions based on the results of risk assessment can be made, which provide project managers with a useful method or tool to manage project risks.

Suggested Citation

  • Libiao Bai & Kaimin Zhang & Huijing Shi & Min An & Xiao Han, 2020. "Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network," Complexity, Hindawi, vol. 2020, pages 1-21, November.
  • Handle: RePEc:hin:complx:5410978
    DOI: 10.1155/2020/5410978
    as

    Download full text from publisher

    File URL: http://downloads.hindawi.com/journals/8503/2020/5410978.pdf
    Download Restriction: no

    File URL: http://downloads.hindawi.com/journals/8503/2020/5410978.xml
    Download Restriction: no

    File URL: https://libkey.io/10.1155/2020/5410978?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yipei Zhang & Jiale Liu & Xiaoyan Xie & Chenshuo Wang & Libiao Bai, 2023. "Modeling of Project Portfolio Risk Evolution and Response under the Influence of Interactions," Mathematics, MDPI, vol. 11(19), pages 1-20, September.
    2. Zhang, Kaimin & Bai, Libiao & Xie, Xiaoyan & Wang, Chenshuo, 2023. "Modeling of risk cascading propagation in project portfolio network," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 612(C).
    3. Ji, Chenyi & Su, Xing & Qin, Zhongfu & Nawaz, Ahsan, 2022. "Probability Analysis of Construction Risk based on Noisy-or Gate Bayesian Networks," Reliability Engineering and System Safety, Elsevier, vol. 217(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hin:complx:5410978. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Mohamed Abdelhakeem (email available below). General contact details of provider: https://www.hindawi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.