A Hyper Heuristic Algorithm Based Genetic Programming for Steel Production Scheduling of Cyber-Physical System-ORIENTED
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Antonio Jiménez-Martín & Alfonso Mateos & Josefa Z. Hernández, 2021. "Aluminium Parts Casting Scheduling Based on Simulated Annealing," Mathematics, MDPI, vol. 9(7), pages 1-18, March.
- Jianyu Long & Zhong Zheng & Xiaoqiang Gao, 2017. "Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown," International Journal of Production Research, Taylor & Francis Journals, vol. 55(11), pages 3197-3216, June.
- Lixin Tang & Ying Meng & Zhi-Long Chen & Jiyin Liu, 2016. "Coil Batching to Improve Productivity and Energy Utilization in Steel Production," Manufacturing & Service Operations Management, INFORMS, vol. 18(2), pages 262-279, May.
- Hao-Xiang Wang & Hong-Sen Yan, 2016. "An interoperable adaptive scheduling strategy for knowledgeable manufacturing based on SMGWQ-learning," Journal of Intelligent Manufacturing, Springer, vol. 27(5), pages 1085-1095, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jing Wu & Dan Zhang & Yang Yang & Gongshu Wang & Lijie Su, 2022. "Multi-Stage Multi-Product Production and Inventory Planning for Cold Rolling under Random Yield," Mathematics, MDPI, vol. 10(4), pages 1-21, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Antonio Jiménez-Martín, 2022. "Special Issue “Recent Advances and Applications in Multi Criteria Decision Analysis”," Mathematics, MDPI, vol. 10(13), pages 1-3, July.
- Juan Pablo Usuga Cadavid & Samir Lamouri & Bernard Grabot & Robert Pellerin & Arnaud Fortin, 2020. "Machine learning applied in production planning and control: a state-of-the-art in the era of industry 4.0," Journal of Intelligent Manufacturing, Springer, vol. 31(6), pages 1531-1558, August.
- Lixin Tang & Feng Li & Zhi-Long Chen, 2019. "Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 493-514, July.
- Yu-Fang Wang, 2020. "Adaptive job shop scheduling strategy based on weighted Q-learning algorithm," Journal of Intelligent Manufacturing, Springer, vol. 31(2), pages 417-432, February.
- Zhang, Hongbin & Yang, Yu & Wu, Feng, 2024. "Scheduling a set of jobs with convex piecewise linear cost functions on a single-batch-processing machine," Omega, Elsevier, vol. 122(C).
- Husseinzadeh Kashan, Ali & Ozturk, Onur, 2022. "Improved MILP formulation equipped with valid inequalities for scheduling a batch processing machine with non-identical job sizes," Omega, Elsevier, vol. 112(C).
- Bożena Gajdzik & Radosław Wolniak & Wieslaw Wes Grebski, 2022. "An Econometric Model of the Operation of the Steel Industry in POLAND in the Context of Process Heat and Energy Consumption," Energies, MDPI, vol. 15(21), pages 1-26, October.
- Behice Meltem Kayhan & Gokalp Yildiz, 2023. "Reinforcement learning applications to machine scheduling problems: a comprehensive literature review," Journal of Intelligent Manufacturing, Springer, vol. 34(3), pages 905-929, March.
- Jing Wu & Dan Zhang & Yang Yang & Gongshu Wang & Lijie Su, 2022. "Multi-Stage Multi-Product Production and Inventory Planning for Cold Rolling under Random Yield," Mathematics, MDPI, vol. 10(4), pages 1-21, February.
- Stratos Ioannidis & Alexandros S. Xanthopoulos & Ioannis Sarantis & Dimitrios E. Koulouriotis, 2021. "Joint production, inventory rationing, and order admission control of a stochastic manufacturing system with setups," Operational Research, Springer, vol. 21(2), pages 827-855, June.
- Zeng, Yujiao & Xiao, Xin & Li, Jie & Sun, Li & Floudas, Christodoulos A. & Li, Hechang, 2018. "A novel multi-period mixed-integer linear optimization model for optimal distribution of byproduct gases, steam and power in an iron and steel plant," Energy, Elsevier, vol. 143(C), pages 881-899.
- Cheng, Bayi & Leung, Joseph Y.-T. & Li, Kai & Yang, Shanlin, 2019. "Integrated optimization of material supplying, manufacturing, and product distribution: Models and fast algorithms," European Journal of Operational Research, Elsevier, vol. 277(1), pages 100-111.
- Cheng, Ba-Yi & Leung, Joseph Y-T. & Li, Kai, 2017. "Integrated scheduling on a batch machine to minimize production, inventory and distribution costs," European Journal of Operational Research, Elsevier, vol. 258(1), pages 104-112.
More about this item
Keywords
steel production scheduling; cyber-physical system; hyper-heuristic algorithm; genetic programming; heuristic scheduling rule;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:9:y:2021:i:18:p:2256-:d:635209. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.