Author
Listed:
- Sameh Al-Shihabi
(Industrial Engineering and Engineering Management Department, University of Sharjah, Sharjah P.O. Box 27272, United Arab Emirates)
- Ashraf Elazouni
(Department of Civil and Architectural Engineering, College of Engineering, Sultan Qaboos University, Al Khoud, Muscat 123, Oman)
Abstract
Construction contractors often rely on external funding to manage financial deficits caused by irregular cash inflows and outflows. To address these cash flow challenges, contractors typically adjust the start times of project activities to prevent shortages while minimizing the overall project duration. However, in severe cases, operations may need to halt if cash flow issues cannot be adequately resolved. This study introduces an alternative strategy to prevent cash shortages by allowing for the temporary suspension of activities, known as activity splitting. In this approach, operations are paused to conserve cash and then resumed when sufficient funds become available. The potential benefit of this method is illustrated through a simple, four-activity project. Extending the application to more complex projects with a set of splittable activities—each having different cash requirements, durations, and associated splitting costs—the challenge lies in identifying the optimal activities to split and determining the precise suspension and resumption times, all while minimizing or avoiding project delays and additional costs. To address this, we present a novel mixed-integer linear programming (MILP) model that optimizes the scheduling and splitting of activities to minimize project duration without breaching financial constraints. The MILP model effectively identifies the best trade-off between activity splitting and project extension, taking into account the financial and cost implications of the contractor’s constraints. This is demonstrated through a case study that considers different scenarios related to splitting costs and financial limitations.
Suggested Citation
Sameh Al-Shihabi & Ashraf Elazouni, 2025.
"Modified Finance-Based Scheduling with Activity Splitting,"
Mathematics, MDPI, vol. 13(1), pages 1-15, January.
Handle:
RePEc:gam:jmathe:v:13:y:2025:i:1:p:139-:d:1558532
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:13:y:2025:i:1:p:139-:d:1558532. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.