IDEAS home Printed from https://ideas.repec.org/a/gam/jmathe/v11y2023i2p309-d1027889.html
   My bibliography  Save this article

The Optimization of Working Time for a Consecutively Connected Production Line

Author

Listed:
  • Bingyin Lei

    (School of Economics & Management, Beijing Information Science & Technology University, Beijing 100192, China)

  • Yue Ren

    (School of Economics & Management, Beijing Information Science & Technology University, Beijing 100192, China)

  • Ziyang Wang

    (School of Economics & Management, Beijing Information Science & Technology University, Beijing 100192, China)

  • Xinquan Ge

    (School of Economics & Management, Beijing Information Science & Technology University, Beijing 100192, China)

  • Xiaolin Li

    (Institute of Intelligent Manufacturing Technology, Shenzhen Polytechnic, Shenzhen 518055, China)

  • Kaiye Gao

    (School of Economics & Management, Beijing Information Science & Technology University, Beijing 100192, China
    Academy of Mathematics and Systems Science, Chinese Academy of Sciences, Beijing 100190, China)

Abstract

Most factory production processes are completed by machines and workers on production lines. The operation schedule is arranged to reduce the cost of the enterprises to obtain the maximum economic profit for sustainable running. Previous studies usually investigated the working time while only considering the workers’ conditions. This study proposed a method to optimize the operation schedule by jointly considering the workers’ fatigue states and the operation states of machines. This method was proposed based on a system structure called the multistate consecutively connected system (MCCS), which has been widely applied in many areas, such as electronic communications. This structure is also an analogy of the production line. The corresponding model is constructed based on the universal generating function (UGF) since it is a powerful tool in modeling a consecutively connected system. The proposed model can be used to evaluate the different productivities of different types of workers in different states and to realize the screening of the whole scheme through simulation. According to the proposed method, we obtained the optimal operation schedule, including the working time, rest time and allocation strategy for a production line system. Some examples are provided to illustrate the proposed method.

Suggested Citation

  • Bingyin Lei & Yue Ren & Ziyang Wang & Xinquan Ge & Xiaolin Li & Kaiye Gao, 2023. "The Optimization of Working Time for a Consecutively Connected Production Line," Mathematics, MDPI, vol. 11(2), pages 1-12, January.
  • Handle: RePEc:gam:jmathe:v:11:y:2023:i:2:p:309-:d:1027889
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2227-7390/11/2/309/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2227-7390/11/2/309/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Gao, Kaiye & Peng, Rui & Qu, Li & Wu, Shaomin, 2020. "Jointly optimizing lot sizing and maintenance policy for a production system with two failure modes," Reliability Engineering and System Safety, Elsevier, vol. 202(C).
    2. Javier Llopis & Antonio Lacasa & Eduardo Garcia & Nicolás Montés & Lucía Hilario & Judith Vizcaíno & Cristina Vilar & Judit Vilar & Laura Sánchez & Juan Carlos Latorre, 2022. "Manufacturing Maps, a Novel Tool for Smart Factory Management Based on Petri Nets and Big Data Mini-Terms," Mathematics, MDPI, vol. 10(14), pages 1-22, July.
    3. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2017. "Optimal arrangement of connecting elements in linear consecutively connected systems with heterogeneous warm standby groups," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 395-401.
    4. Glock, C.H. & Grosse, E.H. & Kim, T. & Neumann, W.P. & Sobhani, A., 2019. "An integrated cost and worker fatigue evaluation model of a packaging process," International Journal of Production Economics, Elsevier, vol. 207(C), pages 107-124.
    5. Xing, Liudong & Levitin, Gregory, 2018. "Connectivity modeling and optimization of linear consecutively connected systems with repairable connecting elements," European Journal of Operational Research, Elsevier, vol. 264(2), pages 732-741.
    6. Rui Peng & Min Xie & Szu Ng & Gregory Levitin, 2012. "Element maintenance and allocation for linear consecutively connected systems," IISE Transactions, Taylor & Francis Journals, vol. 44(11), pages 964-973.
    7. Patrick G Gwyer, 2017. "Applying the Yerkes-Dodson Law to Understanding Positive or Negative Emotions," Global Journal of Intellectual & Developmental Disabilities, Juniper Publishers Inc., vol. 3(2), pages 37-39, September.
    8. Dayong Han & Qiuhua Tang & Zikai Zhang & Zixiang Li, 2020. "An Improved Migrating Birds Optimization Algorithm for a Hybrid Flow Shop Scheduling within Steel Plants," Mathematics, MDPI, vol. 8(10), pages 1-28, September.
    9. Glock, C. H. & Grosse, E. H. & Kim, T. & Neumann, W. P. & Sobhani, A., 2019. "An integrated cost and worker fatigue evaluation model of a packaging process," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 107269, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2024. "Consecutively connected systems with unreliable resource generators and storages," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    2. Yue Ren & Chunhua Jin & Shu Fang & Li Yang & Zixuan Wu & Ziyang Wang & Rui Peng & Kaiye Gao, 2023. "A Comprehensive Review of Key Technologies for Enhancing the Reliability of Lithium-Ion Power Batteries," Energies, MDPI, vol. 16(17), pages 1-38, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2018. "Connectivity evaluation and optimal service centers allocation in repairable linear consecutively connected systems," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 187-193.
    2. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2024. "Consecutively connected systems with unreliable resource generators and storages," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
    3. Jiuh‐Biing Sheu & Tsan‐Ming Choi, 2023. "Can we work more safely and healthily with robot partners? A human‐friendly robot–human‐coordinated order fulfillment scheme," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 794-812, March.
    4. Meherishi, Lavanya & Narayana, Sushmita A. & Ranjani, K.S., 2021. "Integrated product and packaging decisions with secondary packaging returns and protective packaging management," European Journal of Operational Research, Elsevier, vol. 292(3), pages 930-952.
    5. Xu, Shuling & Hall, Nicholas G., 2021. "Fatigue, personnel scheduling and operations: Review and research opportunities," European Journal of Operational Research, Elsevier, vol. 295(3), pages 807-822.
    6. Eryilmaz, Serkan, 2020. "Age-based preventive maintenance for coherent systems with applications to consecutive-k-out-of-n and related systems," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
    7. Asadayoobi, N. & Taghipour, S. & Jaber, M.Y., 2022. "Predicting human reliability based on probabilistic mission completion time using Bayesian Network," Reliability Engineering and System Safety, Elsevier, vol. 221(C).
    8. Hui Xiao & Minhao Cao & Gang Kou & Xiaojun Yuan, 2021. "Optimal element allocation and sequencing of multi-state series systems with two levels of performance sharing," Journal of Risk and Reliability, , vol. 235(2), pages 282-292, April.
    9. Wu, Shaomin & Wu, Di & Peng, Rui, 2023. "Considering greenhouse gas emissions in maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 307(3), pages 1135-1145.
    10. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Optimal sequencing of elements activation in 1-out-of-n warm standby system with storage," Reliability Engineering and System Safety, Elsevier, vol. 221(C).
    11. Peng, Rui & Xiao, Hui & Liu, Hanlin, 2017. "Reliability of multi-state systems with a performance sharing group of limited size," Reliability Engineering and System Safety, Elsevier, vol. 166(C), pages 164-170.
    12. Peng, Rui & Mo, Huadong & Xie, Min & Levitin, Gregory, 2013. "Optimal structure of multi-state systems with multi-fault coverage," Reliability Engineering and System Safety, Elsevier, vol. 119(C), pages 18-25.
    13. Zhou, Yifan & Lin, Tian Ran & Sun, Yong & Bian, Yangqing & Ma, Lin, 2015. "An effective approach to reducing strategy space for maintenance optimisation of multistate series–parallel systems," Reliability Engineering and System Safety, Elsevier, vol. 138(C), pages 40-53.
    14. Andy Alexander & Yanjun Li & Robert Plante, 2017. "Sustaining system coordination in outsourcing the maintenance function of a process having a linear failure rate," IISE Transactions, Taylor & Francis Journals, vol. 49(5), pages 544-552, May.
    15. Ke Chen & Xian Zhao & Qingan Qiu, 2022. "Optimal Task Abort and Maintenance Policies Considering Time Redundancy," Mathematics, MDPI, vol. 10(9), pages 1-16, April.
    16. Wu, Shengna & Yang, Jun & Peng, Rui & Zhai, Qingqing, 2021. "Optimal design of facility allocation and maintenance strategy for a cellular network," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
    17. Levitin, Gregory & Xing, Liudong & Dai, Yuanshun, 2022. "Heterogeneous 1-out-of-n standby systems with limited unit operation time," Reliability Engineering and System Safety, Elsevier, vol. 224(C).
    18. Dui, Hongyan & Meng, Xueyu & Xiao, Hui & Guo, Jianjun, 2020. "Analysis of the cascading failure for scale-free networks based on a multi-strategy evolutionary game," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    19. Ágota Bányai, 2021. "Energy Consumption-Based Maintenance Policy Optimization," Energies, MDPI, vol. 14(18), pages 1-33, September.
    20. Xiao, Hui & Shi, Daimin & Ding, Yi & Peng, Rui, 2016. "Optimal loading and protection of multi-state systems considering performance sharing mechanism," Reliability Engineering and System Safety, Elsevier, vol. 149(C), pages 88-95.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jmathe:v:11:y:2023:i:2:p:309-:d:1027889. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.