IDEAS home Printed from https://ideas.repec.org/a/gam/jlogis/v6y2022i3p41-d846582.html
   My bibliography  Save this article

Developing a Comprehensive Shipment Policy through Modified EPQ Model Considering Process Imperfections, Transportation Cost, and Backorders

Author

Listed:
  • Waseem Sajjad

    (Department of Industrial Engineering, University of Engineering and Technology, Peshawar 25120, Pakistan)

  • Misbah Ullah

    (Department of Industrial Engineering, University of Engineering and Technology, Peshawar 25120, Pakistan)

  • Razaullah Khan

    (Department of Engineering Management, University of Engineering and Applied Sciences, Swat 19060, Pakistan)

  • Mubashir Hayat

    (Department of Mechanical Engineering, Campus Jalozai, University of Engineering and Technology, Peshawar 24240, Pakistan)

Abstract

Background: Determining the optimum shipment quantity in a traditional production system is a competitive business dimension, and developing a reliable shipment policy is decisive for long-term objectives. Currently, significant research in this domain has mainly focused on the optimum shipment lot sizing in a perfect production system without considering the imperfections in the production processes and logistics. It has been well established that the real production inventory system acts as an imperfection in the overall production management loop. Methods: This research deals with designing a new shipment policy considering the imperfections in the production processes and undertaking some influential factors, such as the transportation cost, the actual production inventory, defective items, and backorders. Results: In the developed mathematical framework, the lot-sizing problems, imperfections in the production processes, retailers, and distributors are considered with equal-sized shipment policy to attain pragmatic and real-time results. Conclusions : The developed framework considers an all-unit-discount transportation cost structure. The numerical computations, as well as sensitivity analysis, are performed to point out the specifications and validation of the proposed model.

Suggested Citation

  • Waseem Sajjad & Misbah Ullah & Razaullah Khan & Mubashir Hayat, 2022. "Developing a Comprehensive Shipment Policy through Modified EPQ Model Considering Process Imperfections, Transportation Cost, and Backorders," Logistics, MDPI, vol. 6(3), pages 1-20, June.
  • Handle: RePEc:gam:jlogis:v:6:y:2022:i:3:p:41-:d:846582
    as

    Download full text from publisher

    File URL: https://www.mdpi.com/2305-6290/6/3/41/pdf
    Download Restriction: no

    File URL: https://www.mdpi.com/2305-6290/6/3/41/
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Ertogral, K. & Darwish, M. & Ben-Daya, M., 2007. "Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost," European Journal of Operational Research, Elsevier, vol. 176(3), pages 1592-1606, February.
    2. Biswajit Sarkar & Kripasindhu Chaudhuri & Shib Sankar Sana, 2010. "A stock-dependent inventory model in an imperfect production process," International Journal of Procurement Management, Inderscience Enterprises Ltd, vol. 3(4), pages 361-378.
    3. Snyder, Ralph D. & Koehler, Anne B. & Hyndman, Rob J. & Ord, J. Keith, 2004. "Exponential smoothing models: Means and variances for lead-time demand," European Journal of Operational Research, Elsevier, vol. 158(2), pages 444-455, October.
    4. Biswajit Sarkar & Shib Sankar Sana & Kripasindhu Chaudhuri, 2010. "Optimal reliability, production lot size and safety stock in an imperfect production system," International Journal of Mathematics in Operational Research, Inderscience Enterprises Ltd, vol. 2(4), pages 467-490.
    5. Sana, Shib Sankar, 2010. "A production-inventory model in an imperfect production process," European Journal of Operational Research, Elsevier, vol. 200(2), pages 451-464, January.
    6. Haeussler, S. & Stampfer, C. & Missbauer, H., 2020. "Comparison of two optimization based order release models with fixed and variable lead times," International Journal of Production Economics, Elsevier, vol. 227(C).
    7. Asif Iqbal Malik & Biswajit Sarkar, 2020. "Coordination Supply Chain Management Under Flexible Manufacturing, Stochastic Leadtime Demand, and Mixture of Inventory," Mathematics, MDPI, vol. 8(6), pages 1-32, June.
    8. B.C. Giri & A. Chakraborty & T. Maiti, 2017. "Consignment stock policy with unequal shipments and process unreliability for a two-level supply chain," International Journal of Production Research, Taylor & Francis Journals, vol. 55(9), pages 2489-2505, May.
    9. Taleizadeh, Ata Allah & Tafakkori, Keivan & Thaichon, Park, 2021. "Resilience toward supply disruptions: A stochastic inventory control model with partial backordering under the base stock policy," Journal of Retailing and Consumer Services, Elsevier, vol. 58(C).
    10. Swenseth, Scott R. & Godfrey, Michael R., 2002. "Incorporating transportation costs into inventory replenishment decisions," International Journal of Production Economics, Elsevier, vol. 77(2), pages 113-130, May.
    11. Mubashir Hayat & Bashir Salah & Misbah Ullah & Iftikhar Hussain & Razaullah Khan, 2020. "Shipment Policy for an Economic Production Quantity Model Considering Imperfection and Transportation Cost," Sustainability, MDPI, vol. 12(21), pages 1-16, October.
    12. Jean‐Paul Rodrigue, 2006. "Transportation and the Geographical and Functional Integration of Global Production Networks," Growth and Change, Wiley Blackwell, vol. 37(4), pages 510-525, December.
    13. Goyal, Suresh K. & Nebebe, Fassil, 2000. "Determination of economic production-shipment policy for a single-vendor-single-buyer system," European Journal of Operational Research, Elsevier, vol. 121(1), pages 175-178, February.
    14. Sarker, Bhaba R. & Jamal, A.M.M. & Mondal, Sanjay, 2008. "Optimal batch sizing in a multi-stage production system with rework consideration," European Journal of Operational Research, Elsevier, vol. 184(3), pages 915-929, February.
    15. Ali Ekici & Baṣak Altan & Okan Örsan Özener, 2016. "Pricing decisions in a strategic single retailer/dual suppliers setting under order size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(7), pages 1887-1898, April.
    16. Ata Allah Taleizadeh & Mahsa Noori-daryan & Reza Tavakkoli-Moghaddam, 2015. "Pricing and ordering decisions in a supply chain with imperfect quality items and inspection under buyback of defective items," International Journal of Production Research, Taylor & Francis Journals, vol. 53(15), pages 4553-4582, August.
    17. Hsiao, Yu-Cheng, 2008. "A note on integrated single vendor single buyer model with stochastic demand and variable lead time," International Journal of Production Economics, Elsevier, vol. 114(1), pages 294-297, July.
    18. Widyadana, Gede Agus & Wee, Hui Ming, 2012. "An economic production quantity model for deteriorating items with multiple production setups and rework," International Journal of Production Economics, Elsevier, vol. 138(1), pages 62-67.
    19. Dominguez, Roberto & Cannella, Salvatore & Ponte, Borja & Framinan, Jose M., 2020. "On the dynamics of closed-loop supply chains under remanufacturing lead time variability," Omega, Elsevier, vol. 97(C).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mubashir Hayat & Bashir Salah & Misbah Ullah & Iftikhar Hussain & Razaullah Khan, 2020. "Shipment Policy for an Economic Production Quantity Model Considering Imperfection and Transportation Cost," Sustainability, MDPI, vol. 12(21), pages 1-16, October.
    2. Biswajit Sarkar & Bikash Koli Dey & Mitali Sarkar & Ali AlArjani, 2021. "A Sustainable Online-to-Offline (O2O) Retailing Strategy for a Supply Chain Management under Controllable Lead Time and Variable Demand," Sustainability, MDPI, vol. 13(4), pages 1-26, February.
    3. Chang Wook Kang & Misbah Ullah & Mitali Sarkar & Muhammad Omair & Biswajit Sarkar, 2019. "A Single-Stage Manufacturing Model with Imperfect Items, Inspections, Rework, and Planned Backorders," Mathematics, MDPI, vol. 7(5), pages 1-18, May.
    4. Guchhait, Partha & Kumar Maiti, Manas & Maiti, Manoranjan, 2013. "Production-inventory models for a damageable item with variable demands and inventory costs in an imperfect production process," International Journal of Production Economics, Elsevier, vol. 144(1), pages 180-188.
    5. Mitali Sarkar & Sungjun Kim & Jihed Jemai & Baishakhi Ganguly & Biswajit Sarkar, 2019. "An Application of Time-Dependent Holding Costs and System Reliability in a Multi-Item Sustainable Economic Energy Efficient Reliable Manufacturing System," Energies, MDPI, vol. 12(15), pages 1-19, July.
    6. Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
    7. Wakhid Ahmad Jauhari & I Nyoman Pujawan & Mokh Suef, 2023. "Sustainable inventory management with hybrid production system and investment to reduce defects," Annals of Operations Research, Springer, vol. 324(1), pages 543-572, May.
    8. R. Uthayakumar & M. Rameswari, 2012. "An Economic Production Quantity Model for Defective Items with Trapezoidal type Demand Rate," Journal of Optimization Theory and Applications, Springer, vol. 154(3), pages 1055-1079, September.
    9. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    10. Sarkar, Mitali & Sarkar, Biswajit, 2013. "An economic manufacturing quantity model with probabilistic deterioration in a production system," Economic Modelling, Elsevier, vol. 31(C), pages 245-252.
    11. Sarkar, Biswajit & Sarkar, Sumon, 2013. "Variable deterioration and demand—An inventory model," Economic Modelling, Elsevier, vol. 31(C), pages 548-556.
    12. Ata Allah Taleizadeh, 2018. "A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering," Annals of Operations Research, Springer, vol. 261(1), pages 303-337, February.
    13. San-José, Luis A. & García-Laguna, Juan, 2009. "Optimal policy for an inventory system with backlogging and all-units discounts: Application to the composite lot size model," European Journal of Operational Research, Elsevier, vol. 192(3), pages 808-823, February.
    14. Al-Salamah, Muhammad, 2019. "Economic production quantity in an imperfect manufacturing process with synchronous and asynchronous flexible rework rates," Operations Research Perspectives, Elsevier, vol. 6(C).
    15. Bimal Kumar Sett & Bikash Koli Dey & Biswajit Sarkar, 2020. "Autonomated Inspection Policy for Smart Factory—An Improved Approach," Mathematics, MDPI, vol. 8(10), pages 1-19, October.
    16. R. Sundara rajan & R. Uthayakumar, 2017. "Comprehensive solution procedure for optimizing replenishment policies of instantaneous deteriorating items with stock-dependent demand under partial trade credit linked to order quantity," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1343-1373, November.
    17. Sarkar, Biswajit & Sarkar, Mitali & Ganguly, Baishakhi & Cárdenas-Barrón, Leopoldo Eduardo, 2021. "Combined effects of carbon emission and production quality improvement for fixed lifetime products in a sustainable supply chain management," International Journal of Production Economics, Elsevier, vol. 231(C).
    18. Jin, Tongdan & Tian, Yu, 2012. "Optimizing reliability and service parts logistics for a time-varying installed base," European Journal of Operational Research, Elsevier, vol. 218(1), pages 152-162.
    19. YuJan Shen & KuanFu Shen & ChihTe Yang, 2019. "A Production Inventory Model for Deteriorating Items with Collaborative Preservation Technology Investment Under Carbon Tax," Sustainability, MDPI, vol. 11(18), pages 1-18, September.
    20. Prasanta Kumar Ghosh & Amalesh Kumar Manna & Jayanta Kumar Dey & Samarjit Kar, 2023. "Optimal production run in an imperfect production process with maintenance under warranty and product insurance," OPSEARCH, Springer;Operational Research Society of India, vol. 60(2), pages 720-752, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jlogis:v:6:y:2022:i:3:p:41-:d:846582. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.