IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v121y2000i1p175-178.html
   My bibliography  Save this article

Determination of economic production-shipment policy for a single-vendor-single-buyer system

Author

Listed:
  • Goyal, Suresh K.
  • Nebebe, Fassil

Abstract

No abstract is available for this item.

Suggested Citation

  • Goyal, Suresh K. & Nebebe, Fassil, 2000. "Determination of economic production-shipment policy for a single-vendor-single-buyer system," European Journal of Operational Research, Elsevier, vol. 121(1), pages 175-178, February.
  • Handle: RePEc:eee:ejores:v:121:y:2000:i:1:p:175-178
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(99)00013-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Lu, Lu, 1995. "A one-vendor multi-buyer integrated inventory model," European Journal of Operational Research, Elsevier, vol. 81(2), pages 312-323, March.
    2. Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
    3. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
    2. Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
    3. Kaya, Onur & Kubalı, Deniz & Örmeci, Lerzan, 2013. "A coordinated production and shipment model in a supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 120-131.
    4. Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
    5. Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
    6. Ho, Chia-Huei & Ouyang, Liang-Yuh & Su, Chia-Hsien, 2008. "Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit," European Journal of Operational Research, Elsevier, vol. 187(2), pages 496-510, June.
    7. Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
    8. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    9. Chu, Chi-Leung & Leon, V. Jorge, 2008. "Single-vendor multi-buyer inventory coordination under private information," European Journal of Operational Research, Elsevier, vol. 191(2), pages 485-503, December.
    10. Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
    11. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    12. Viswanathan, S. & Piplani, Rajesh, 2001. "Coordinating supply chain inventories through common replenishment epochs," European Journal of Operational Research, Elsevier, vol. 129(2), pages 277-286, March.
    13. YuJan Shen & KuanFu Shen & ChihTe Yang, 2019. "A Production Inventory Model for Deteriorating Items with Collaborative Preservation Technology Investment Under Carbon Tax," Sustainability, MDPI, vol. 11(18), pages 1-18, September.
    14. Sucky, Eric, 2005. "Inventory management in supply chains: A bargaining problem," International Journal of Production Economics, Elsevier, vol. 93(1), pages 253-262, January.
    15. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    16. Ivan Darma Wangsa & Tao Ming Yang & Hui Ming Wee, 2018. "The Effect of Price-Dependent Demand on the Sustainable Electrical Energy Supply Chain," Energies, MDPI, vol. 11(7), pages 1-18, June.
    17. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
    18. Y Feng & S Viswanathan, 2007. "Impact of demand uncertainty on coordinating supply chain inventories through common replenishment epochs," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(7), pages 964-971, July.
    19. Simpson, N.C., 2007. "Central versus local multiple stage inventory planning: An analysis of solutions," European Journal of Operational Research, Elsevier, vol. 181(1), pages 127-138, August.
    20. Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:121:y:2000:i:1:p:175-178. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.