A Quasi-Resonant ZVZCS Phase-Shifted Full-Bridge Converter with an Active Clamp in the Secondary Side
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Chuan Sun & Xiaodong Li, 2018. "Fast Transient Modulation for a Step Load Change in a Dual-Active-Bridge Converter with Extended-Phase-Shift Control," Energies, MDPI, vol. 11(6), pages 1-22, June.
- Wenzheng Xu & Nelson Hon Lung Chan & Siu Wing Or & Siu Lau Ho & Ka Wing Chan, 2017. "A New Control Method for a Bi-Directional Phase-Shift-Controlled DC-DC Converter with an Extended Load Range," Energies, MDPI, vol. 10(10), pages 1-17, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jing-Yuan Lin & Yi-Feng Lin & Sih-Yi Lee, 2019. "A Novel Multi-Element Resonant Converter with Self-Driven Synchronous Rectification," Energies, MDPI, vol. 12(4), pages 1-10, February.
- Vu-Hai Nam & Duong-Van Tinh & Woojin Choi, 2021. "A Novel Hybrid LDC Converter Topology for the Integrated On-Board Charger of Electric Vehicles," Energies, MDPI, vol. 14(12), pages 1-18, June.
- Sajib Chakraborty & Hai-Nam Vu & Mohammed Mahedi Hasan & Dai-Duong Tran & Mohamed El Baghdadi & Omar Hegazy, 2019. "DC-DC Converter Topologies for Electric Vehicles, Plug-in Hybrid Electric Vehicles and Fast Charging Stations: State of the Art and Future Trends," Energies, MDPI, vol. 12(8), pages 1-43, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Shu-huai Zhang & Yi-feng Wang & Bo Chen & Fu-qiang Han & Qing-cui Wang, 2018. "Studies on a Hybrid Full-Bridge/Half-Bridge Bidirectional CLTC Multi-Resonant DC-DC Converter with a Digital Synchronous Rectification Strategy," Energies, MDPI, vol. 11(1), pages 1-22, January.
- Dorin Petreus & Radu Etz & Toma Patarau & Ionut Ciocan, 2020. "Comprehensive Analysis of a High-Power Density Phase-Shift Full Bridge Converter Highlighting the Effects of the Parasitic Capacitances," Energies, MDPI, vol. 13(6), pages 1-20, March.
- Min-Soo Kim & Do-Hyun Kim & Dong-Keun Jeong & Jang-Mok Kim & Hee-Je Kim, 2020. "Soft Start-Up Control Strategy for Dual Active Bridge Converter with a Supercapacitor," Energies, MDPI, vol. 13(16), pages 1-19, August.
- Carlos Calderon & Andres Barrado & Alba Rodriguez & Pedro Alou & Antonio Lazaro & Cristina Fernandez & Pablo Zumel, 2018. "General Analysis of Switching Modes in a Dual Active Bridge with Triple Phase Shift Modulation," Energies, MDPI, vol. 11(9), pages 1-23, September.
More about this item
Keywords
quasi-resonant; active clamp; zero-voltage zero-current switching (ZVZCS); phase-shifted full bridge;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jeners:v:11:y:2018:i:11:p:2868-:d:177757. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.