Uncertainty in the Planning Phase of Public Projects—Its Scope, Consequences, and Possible Remedies
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Locatelli, Giorgio & Invernizzi, Diletta Colette & Brookes, Naomi J., 2017. "Project characteristics and performance in Europe: An empirical analysis for large transport infrastructure projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 98(C), pages 108-122.
- Servranckx, Tom & Vanhoucke, Mario & Aouam, Tarik, 2021. "Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity," European Journal of Operational Research, Elsevier, vol. 295(3), pages 1161-1179.
- Odeck, James & Kjerkreit, Anne, 2019. "The accuracy of benefit-cost analyses (BCAs) in transportation: An ex-post evaluation of road projects," Transportation Research Part A: Policy and Practice, Elsevier, vol. 120(C), pages 277-294.
- Flyvbjerg, Bent & Ansar, Atif & Budzier, Alexander & Buhl, Søren & Cantarelli, Chantal & Garbuio, Massimo & Glenting, Carsten & Holm, Mette Skamris & Lovallo, Dan & Lunn, Daniel & Molin, Eric & Rønnes, 2018. "Five things you should know about cost overrun," Transportation Research Part A: Policy and Practice, Elsevier, vol. 118(C), pages 174-190.
- Andrew Dainty & Mei-I Cheng & David Moore, 2003. "Redefining performance measures for construction project managers: an empirical evaluation," Construction Management and Economics, Taylor & Francis Journals, vol. 21(2), pages 209-218.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Munday, Max & Reynolds, Laura & Roberts, Annette, 2023. "Re-appraising ‘in-process’ benefits of strategic infrastructure improvements: Capturing the unexpected socio-economic impacts for lagging regions," Transport Policy, Elsevier, vol. 134(C), pages 119-127.
- Coker, Ayodeji Ajibola Alexander, 2021. "Accuracy of in Medias RES and EX-Post Cost-Benefit Analyses: A Case of National Special Programme for Food Security, Nigeria," 2021 Conference, August 17-31, 2021, Virtual 314936, International Association of Agricultural Economists.
- Che khairil Izam Che Ibrahim & Seosamh B. Costello & Suzanne Wilkinson, 2013. "Development of a conceptual team integration performance index for alliance projects," Construction Management and Economics, Taylor & Francis Journals, vol. 31(11), pages 1128-1143, November.
- Love, Peter E.D. & Ika, Lavagnon A. & Ahiaga-Dagbui, Dominic D., 2019. "On de-bunking ‘fake news’ in a post truth era: Why does the Planning Fallacy explanation for cost overruns fall short?," Transportation Research Part A: Policy and Practice, Elsevier, vol. 126(C), pages 397-408.
- Ginés de Rus & Javier Campos & Daniel Graham & M. Pilar Socorro & Jorge Valido, 2020. "Evaluación Económica de Proyectos y Políticas de Transporte: Metodología y Aplicaciones. Parte 1: Metodología para el análisis coste-beneficio de proyectos y políticas de transporte," Working Papers 2020-11, FEDEA.
- Zhang, Yijia & Cheng, Lu, 2023. "The role of transport infrastructure in economic growth: Empirical evidence in the UK," Transport Policy, Elsevier, vol. 133(C), pages 223-233.
- Antonio Estache & Renaud Foucart & Tomas Serebrisky, 2022.
"When can lotteries improve public procurement processes?,"
Working Papers
359001116, Lancaster University Management School, Economics Department.
- Antonio Estache & Renaud Foucart & Tomas Serebrisky, 2022. "When can Lotteries improve Public Procurement Processes?," Working Papers ECARES 2022-22, ULB -- Universite Libre de Bruxelles.
- Estache, Antonio & Foucart, Renaud & Serebrisky, Tomás, 2022. "When can lotteries improve public procurement processes?," IDB Publications (Working Papers) 12484, Inter-American Development Bank.
- Iyer K. Chandrashekhar & Banerjee Partha S., 2019. "Identifying New Knowledge Areas to Strengthen the Project Management Institute (PMI) Framework," Organization, Technology and Management in Construction, Sciendo, vol. 11(1), pages 1892-1903, March.
- Bent Flyvbjerg & Alexander Budzier & Daniel Lunn, 2021.
"Regression to the tail: Why the Olympics blow up,"
Environment and Planning A, , vol. 53(2), pages 233-260, March.
- Bent Flyvbjerg & Alexander Budzier & Daniel Lunn, 2020. "Regression to the Tail: Why the Olympics Blow Up," Papers 2009.14682, arXiv.org.
- Bos, Ernst & de Swart, Linette, 2024. "Towards a better comparison of ex-post and ex-ante BCA's by decomposing potential causes of difference," Transport Policy, Elsevier, vol. 151(C), pages 36-45.
- Muhammad Irfan & Sanam Zaib Khan & Nasruddin Hassan & Mazlan Hassan & Muhammad Habib & Salma Khan & Hadi Hassan Khan, 2021. "Role of Project Planning and Project Manager Competencies on Public Sector Project Success," Sustainability, MDPI, vol. 13(3), pages 1-19, January.
- Ünsal-Altuncan, Izel & Vanhoucke, Mario, 2024. "A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks," European Journal of Operational Research, Elsevier, vol. 315(2), pages 511-527.
- Jenkins, G. & Olasehinde-Williams, G. & Baurzhan, S., 2022.
"Is there a net economic loss from employing reference class forecasting in the appraisal of hydropower projects?,"
Renewable and Sustainable Energy Reviews, Elsevier, vol. 159(C).
- Glenn P. Jenkins & Olasehinde G. Williams & Saule Baurzhan, 2022. "Is there a net economic loss from employing reference class forecasting in the appraisal of hydropower projects?," Development Discussion Papers 2022-02, JDI Executive Programs.
- Lordan-Perret, Rebecca & Bärenbold, Rebekka & Weigt, Hannes & Rosner, Robert, 2023.
"An ex-ante method to verify commercial U.S. nuclear power plant decommissioning cost estimates,"
Energy Economics, Elsevier, vol. 127(PB).
- Lordan-Perret, Rebecca & Bärenbold, Rebekka & Weigt, Hannes & Rosner, Robert, 2022. "An Ex-Ante Method to Verify Commercial U.S. Nuclear Power Plant Decommissioning Cost Estimates," Working papers 2022/08, Faculty of Business and Economics - University of Basel.
- Zhou, You & Zhang, Lingzhu & Chiaradia, Alain J F, 2021. "An adaptation of reference class forecasting for the assessment of large-scale urban planning vision, a SEM-ANN approach to the case of Hong Kong Lantau tomorrow," Land Use Policy, Elsevier, vol. 109(C).
- Dotti, Nicola Francesco, 2018.
"Knowledge that matters for the ‘survival of unfittest’: The case of the new Brussels' rail junction,"
Transport Policy, Elsevier, vol. 63(C), pages 131-140.
- Nicola Francesco Dotti, 2018. "Knowledge that matters for the 'survival of unfittest’: The case of the new Brussels' rail junction," ULB Institutional Repository 2013/266990, ULB -- Universite Libre de Bruxelles.
- Cavalieri, Marina & Cristaudo, Rossana & Guccio, Calogero, 2019. "On the magnitude of cost overruns throughout the project life-cycle: An assessment for the Italian transport infrastructure projects," Transport Policy, Elsevier, vol. 79(C), pages 21-36.
- Kopel, Michael & Ramani, Vinay, 2024. "The bright side of the planning fallacy in distribution channels," European Journal of Operational Research, Elsevier, vol. 314(2), pages 540-551.
- Giorgio Locatelli, 2018. "Why are Megaprojects, Including Nuclear Power Plants, Delivered Overbudget and Late? Reasons and Remedies," Papers 1802.07312, arXiv.org.
- Bhatia, Vinod & Sharma, Seema, 2024. "Trends and policy analysis: A case for sustainable transport systems in India," Transport Policy, Elsevier, vol. 153(C), pages 76-86.
More about this item
Keywords
public project; uncertainty in projects; public-project planning; public-project manager;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:gam:jadmsc:v:13:y:2023:i:6:p:145-:d:1161848. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: MDPI Indexing Manager (email available below). General contact details of provider: https://www.mdpi.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.