A bilevel programming algorithm for exact solution of the network design problem with user-optimal flows
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Puchit Sariddichainunta & Masahiro Inuiguchi, 2017. "Global optimality test for maximin solution of bilevel linear programming with ambiguous lower-level objective function," Annals of Operations Research, Springer, vol. 256(2), pages 285-304, September.
- Ferrari, Paolo, 1999. "A model of urban transport management," Transportation Research Part B: Methodological, Elsevier, vol. 33(1), pages 43-61, February.
- Teodorović Dušan & Nikolić Miloš, 2023. "Work Zone Scheduling Problem in the Urban Traffic Networks," Economic Themes, Sciendo, vol. 61(1), pages 1-18, March.
- D E Boyce, 1986. "Integration of Supply and Demand Models in Transportation and Location: Problem Formulations and Research Questions," Environment and Planning A, , vol. 18(4), pages 485-489, April.
- Farahani, Reza Zanjirani & Miandoabchi, Elnaz & Szeto, W.Y. & Rashidi, Hannaneh, 2013. "A review of urban transportation network design problems," European Journal of Operational Research, Elsevier, vol. 229(2), pages 281-302.
- A. Kimms & K. Seekircher, 2016. "Network design to anticipate selfish evacuation routing," EURO Journal on Computational Optimization, Springer;EURO - The Association of European Operational Research Societies, vol. 4(3), pages 271-298, September.
- Wei Huang & Guangming Xu & Hong K. Lo, 2020. "Pareto-Optimal Sustainable Transportation Network Design under Spatial Queuing," Networks and Spatial Economics, Springer, vol. 20(3), pages 637-673, September.
- Chen, Yuh-Wen & Tzeng, Gwo-Hshiung, 2001. "Using fuzzy integral for evaluating subjectively perceived travel costs in a traffic assignment model," European Journal of Operational Research, Elsevier, vol. 130(3), pages 653-664, May.
- Solanki, Rajendra S. & Gorti, Jyothi K. & Southworth, Frank, 1998. "Using decomposition in large-scale highway network design with a quasi-optimization heuristic," Transportation Research Part B: Methodological, Elsevier, vol. 32(2), pages 127-140, February.
- Polyxeni-Margarita Kleniati & Claire Adjiman, 2014. "Branch-and-Sandwich: a deterministic global optimization algorithm for optimistic bilevel programming problems. Part I: Theoretical development," Journal of Global Optimization, Springer, vol. 60(3), pages 425-458, November.
- Cohn, Amy & Davey, Melinda & Schkade, Lisa & Siegel, Amanda & Wong, Caris, 2008. "Network design and flow problems with cross-arc costs," European Journal of Operational Research, Elsevier, vol. 189(3), pages 890-901, September.
- Dung-Ying Lin & Avinash Unnikrishnan & S. Waller, 2011. "A Dual Variable Approximation Based Heuristic for Dynamic Congestion Pricing," Networks and Spatial Economics, Springer, vol. 11(2), pages 271-293, June.
- Anny B. Wang & W. Y. Szeto, 2020. "Bounding the Inefficiency of the Reliability-Based Continuous Network Design Problem Under Cost Recovery," Networks and Spatial Economics, Springer, vol. 20(2), pages 395-422, June.
- Gallo, Mariano & D'Acierno, Luca & Montella, Bruno, 2010. "A meta-heuristic approach for solving the Urban Network Design Problem," European Journal of Operational Research, Elsevier, vol. 201(1), pages 144-157, February.
- J. Glackin & J. G. Ecker & M. Kupferschmid, 2009. "Solving Bilevel Linear Programs Using Multiple Objective Linear Programming," Journal of Optimization Theory and Applications, Springer, vol. 140(2), pages 197-212, February.
- T. Kim & Sunduck Suh, 1988. "Toward developing a national transportation planning model: A bilevel programming approach for Korea," The Annals of Regional Science, Springer;Western Regional Science Association, vol. 22(1), pages 65-80, February.
- David Rey & Hillel Bar-Gera & Vinayak V. Dixit & S. Travis Waller, 2019. "A Branch-and-Price Algorithm for the Bilevel Network Maintenance Scheduling Problem," Transportation Science, INFORMS, vol. 53(5), pages 1455-1478, September.
- Sun, Yanshuo & Schonfeld, Paul, 2015. "Stochastic capacity expansion models for airport facilities," Transportation Research Part B: Methodological, Elsevier, vol. 80(C), pages 1-18.
- Tam, M. L. & Lam, William H. K., 2000. "Maximum car ownership under constraints of road capacity and parking space," Transportation Research Part A: Policy and Practice, Elsevier, vol. 34(3), pages 145-170, April.
- Hamid Farvaresh & Mohammad Sepehri, 2013. "A Branch and Bound Algorithm for Bi-level Discrete Network Design Problem," Networks and Spatial Economics, Springer, vol. 13(1), pages 67-106, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:transb:v:20:y:1986:i:3:p:259-265. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/548/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.