A study on the economic and environmental viability of second-hand items in maintenance policies
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ress.2021.108133
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wenbin Wang, 2008. "Delay Time Modelling," Springer Series in Reliability Engineering, in: Complex System Maintenance Handbook, chapter 14, pages 345-370, Springer.
- Alberti, Alexandre R. & Cavalcante, Cristiano A.V. & Scarf, Philip & Silva, André L.O., 2018. "Modelling inspection and replacement quality for a protection system," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 145-153.
- Cavalcante, C.A.V. & Lopes, R.S. & Scarf, P.A., 2018. "A general inspection and opportunistic replacement policy for one-component systems of variable quality," European Journal of Operational Research, Elsevier, vol. 266(3), pages 911-919.
- Scarf, Philip A., 1997. "On the application of mathematical models in maintenance," European Journal of Operational Research, Elsevier, vol. 99(3), pages 493-506, June.
- Cavalcante, Cristiano A.V. & Lopes, Rodrigo S. & Scarf, Philip A., 2021. "Inspection and replacement policy with a fixed periodic schedule," Reliability Engineering and System Safety, Elsevier, vol. 208(C).
- Driessen, J.P.C. & Peng, H. & van Houtum, G.J., 2017. "Maintenance optimization under non-constant probabilities of imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 165(C), pages 115-123.
- Berrade, M.D. & Scarf, P.A. & Cavalcante, C.A.V., 2017. "A study of postponed replacement in a delay time model," Reliability Engineering and System Safety, Elsevier, vol. 168(C), pages 70-79.
- Scarf, P.A. & Cavalcante, C.A.V. & Lopes, R.S., 2019. "Delay-time modelling of a critical system subject to random inspections," European Journal of Operational Research, Elsevier, vol. 278(3), pages 772-782.
- Wang, Wenbin & Zhao, Fei & Peng, Rui, 2014. "A preventive maintenance model with a two-level inspection policy based on a three-stage failure process," Reliability Engineering and System Safety, Elsevier, vol. 121(C), pages 207-220.
- Wang, Wenbin, 2012. "An overview of the recent advances in delay-time-based maintenance modelling," Reliability Engineering and System Safety, Elsevier, vol. 106(C), pages 165-178.
- Zhang, Fengxia & Shen, Jingyuan & Liao, Haitao & Ma, Yizhong, 2021. "Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Scarf, Philip A. & Cavalcante, Cristiano A.V., 2010. "Hybrid block replacement and inspection policies for a multi-component system with heterogeneous component lives," European Journal of Operational Research, Elsevier, vol. 206(2), pages 384-394, October.
- Cavalcante, Cristiano A.V. & Scarf, Philip A. & de Almeida, Adiel T., 2011. "A study of a two-phase inspection policy for a preparedness system with a defective state and heterogeneous lifetime," Reliability Engineering and System Safety, Elsevier, vol. 96(6), pages 627-635.
- Dai, Anshu & Wei, Guanzhou & Wang, Dongfan & He, Zhen & He, Shuguang, 2021. "The opportunity study of PM strategy for second-hand products sold with a two-dimensional warranty," Reliability Engineering and System Safety, Elsevier, vol. 214(C).
- Alberti, Alexandre R. & Cavalcante, Cristiano A.V., 2020. "A two-scale maintenance policy for protection systems subject to shocks when meeting demands," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Park, Minjae & Jung, Ki Mun & Park, Dong Ho, 2020. "Warranty cost analysis for second-hand products under a two-stage repair-or-full refund policy," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Scarf, Philip A. & Cavalcante, Cristiano A.V., 2012. "Modelling quality in replacement and inspection maintenance," International Journal of Production Economics, Elsevier, vol. 135(1), pages 372-381.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Cavalcante, Cristiano A.V. & Lopes, Rodrigo S. & Scarf, Philip A., 2021. "Inspection and replacement policy with a fixed periodic schedule," Reliability Engineering and System Safety, Elsevier, vol. 208(C).
- Wang, Jiantai & Longyan, Tan & Ma, Xiaobing & Gao, Kaiye & Jia, Heping & Yang, Li, 2023. "Prognosis-driven reliability analysis and replacement policy optimization for two-phase continuous degradation," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
- Akcay, Alp, 2022. "An alert-assisted inspection policy for a production process with imperfect condition signals," European Journal of Operational Research, Elsevier, vol. 298(2), pages 510-525.
- Zhang, Fengxia & Shen, Jingyuan & Liao, Haitao & Ma, Yizhong, 2021. "Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 205(C).
- Scarf, P.A. & Cavalcante, C.A.V. & Lopes, R.S., 2019. "Delay-time modelling of a critical system subject to random inspections," European Journal of Operational Research, Elsevier, vol. 278(3), pages 772-782.
- Yang, Li & Ye, Zhi-sheng & Lee, Chi-Guhn & Yang, Su-fen & Peng, Rui, 2019. "A two-phase preventive maintenance policy considering imperfect repair and postponed replacement," European Journal of Operational Research, Elsevier, vol. 274(3), pages 966-977.
- de Jonge, Bram & Scarf, Philip A., 2020. "A review on maintenance optimization," European Journal of Operational Research, Elsevier, vol. 285(3), pages 805-824.
- Alberti, A.R. & Neto, W.A. Ferreira & Cavalcante, C.A.V. & Santos, A.C.J., 2022. "Modelling a flexible two-phase inspection-maintenance policy for safety-critical systems considering revised and non-revised inspections," Reliability Engineering and System Safety, Elsevier, vol. 221(C).
- Wang, Jiantai & Ma, Xiaobing & Yang, Li & Qiu, Qingan & Shang, Lijun & Wang, Jingjing, 2024. "A hybrid inspection-replacement policy for multi-stage degradation considering imperfect inspection with variable probabilities," Reliability Engineering and System Safety, Elsevier, vol. 241(C).
- Sinisterra, Wilfrido Quiñones & Lima, Victor Hugo Resende & Cavalcante, Cristiano Alexandre Virginio & Aribisala, Adetoye Ayokunle, 2023. "A delay-time model to integrate the sequence of resumable jobs, inspection policy, and quality for a single-component system," Reliability Engineering and System Safety, Elsevier, vol. 230(C).
- Yang, Li & Ma, Xiaobing & Zhai, Qingqing & Zhao, Yu, 2016. "A delay time model for a mission-based system subject to periodic and random inspection and postponed replacement," Reliability Engineering and System Safety, Elsevier, vol. 150(C), pages 96-104.
- Wang, Jiantai & Zhou, Shihan & Peng, Rui & Qiu, Qingan & Yang, Li, 2023. "An inspection-based replacement planning in consideration of state-driven imperfect inspections," Reliability Engineering and System Safety, Elsevier, vol. 232(C).
- Sinisterra, Wilfrido Quiñones & Cavalcante, Cristiano Alexandre Virgínio, 2020. "An integrated model of production scheduling and inspection planning for resumable jobs," International Journal of Production Economics, Elsevier, vol. 227(C).
- Santos, Augusto César de Jesus & Cavalcante, Cristiano Alexandre Virginio & Ren, Junru & Wu, Shaomin, 2023. "A novel delay time modelling method for incorporating reuse actions in three-state single-component systems," Reliability Engineering and System Safety, Elsevier, vol. 234(C).
- Zhang, Fengxia & Liao, Haitao & Shen, Jingyuan & Ma, Yizhong, 2024. "Optimal maintenance over a finite time horizon for a system under imperfect inspection and dynamic working environment," Reliability Engineering and System Safety, Elsevier, vol. 246(C).
- Alberti, Alexandre R. & Cavalcante, Cristiano A.V. & Scarf, Philip & Silva, André L.O., 2018. "Modelling inspection and replacement quality for a protection system," Reliability Engineering and System Safety, Elsevier, vol. 176(C), pages 145-153.
- Alberti, Alexandre R. & Cavalcante, Cristiano A.V., 2020. "A two-scale maintenance policy for protection systems subject to shocks when meeting demands," Reliability Engineering and System Safety, Elsevier, vol. 204(C).
- Alotaibi, Naif M. & Scarf, Philip & Cavalcante, Cristiano A.V. & Lopes, Rodrigo S. & de Oliveira e Silva, André Luiz & Rodrigues, Augusto J.S. & Alyami, Salem A., 2023. "Modified-opportunistic inspection and the case of remote, groundwater well-heads," Reliability Engineering and System Safety, Elsevier, vol. 237(C).
- Zhang, Fengxia & Shen, Jingyuan & Ma, Yizhong, 2020. "Optimal maintenance policy considering imperfect repairs and non-constant probabilities of inspection errors," Reliability Engineering and System Safety, Elsevier, vol. 193(C).
- Yang, Li & Ma, Xiaobing & Peng, Rui & Zhai, Qingqing & Zhao, Yu, 2017. "A preventive maintenance policy based on dependent two-stage deterioration and external shocks," Reliability Engineering and System Safety, Elsevier, vol. 160(C), pages 201-211.
More about this item
Keywords
Second-hand items; Reuse of items; Item heterogeneity; Imperfect maintenance;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:reensy:v:217:y:2022:i:c:s0951832021006268. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: https://www.journals.elsevier.com/reliability-engineering-and-system-safety .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.