Adaptive genetic algorithm for lot-sizing problem with self-adjustment operation rate
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Hariga, M. A. & Ben-Daya, M., 1996. "Optimal time varying lot-sizing models under inflationary conditions," European Journal of Operational Research, Elsevier, vol. 89(2), pages 313-325, March.
- Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
- Voros, Jozsef, 1999. "Lot sizing with quality improvement and setup time reduction," European Journal of Operational Research, Elsevier, vol. 113(3), pages 568-574, March.
- Sungmin Kang & Kavindra Malik & L. Joseph Thomas, 1999. "Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs," Management Science, INFORMS, vol. 45(2), pages 273-289, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Egri, Péter & Váncza, József, 2012. "Channel coordination with the newsvendor model using asymmetric information," International Journal of Production Economics, Elsevier, vol. 135(1), pages 491-499.
- Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
- Rezaei, Jafar & Davoodi, Mansoor, 2011. "Multi-objective models for lot-sizing with supplier selection," International Journal of Production Economics, Elsevier, vol. 130(1), pages 77-86, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- József Vörös, 2013. "Economic order and production quantity models without constraint on the percentage of defective items," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 21(4), pages 867-885, December.
- Haugen, Kjetil K. & Olstad, Asmund & Pettersen, Bard I., 2007. "The profit maximizing capacitated lot-size (PCLSP) problem," European Journal of Operational Research, Elsevier, vol. 176(1), pages 165-176, January.
- Karina Copil & Martin Wörbelauer & Herbert Meyr & Horst Tempelmeier, 2017. "Simultaneous lotsizing and scheduling problems: a classification and review of models," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(1), pages 1-64, January.
- Jans, R.F., 2006. "Solving Lotsizing Problems on Parallel Identical Machines Using Symmetry Breaking Constraints," ERIM Report Series Research in Management ERS-2006-051-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
- Raf Jans, 2009. "Solving Lot-Sizing Problems on Parallel Identical Machines Using Symmetry-Breaking Constraints," INFORMS Journal on Computing, INFORMS, vol. 21(1), pages 123-136, February.
- Battini, Daria & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A sustainable EOQ model: Theoretical formulation and applications," International Journal of Production Economics, Elsevier, vol. 149(C), pages 145-153.
- Wolosewicz, Cathy & Dauzère-Pérès, Stéphane & Aggoune, Riad, 2015. "A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem," European Journal of Operational Research, Elsevier, vol. 244(1), pages 3-12.
- Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
- Liu, Tieming, 2008. "Economic lot sizing problem with inventory bounds," European Journal of Operational Research, Elsevier, vol. 185(1), pages 204-215, February.
- Kaijie Zhu & Ulrich W. Thonemann, 2009. "Coordination of pricing and inventory control across products," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(2), pages 175-190, March.
- Chakrabarti, T. & Chaudhuri, K. S., 1997. "An EOQ model for deteriorating items with a linear trend in demand and shortages in all cycles," International Journal of Production Economics, Elsevier, vol. 49(3), pages 205-213, May.
- Qiu, Ruozhen & Sun, Minghe & Lim, Yun Fong, 2017. "Optimizing (s, S) policies for multi-period inventory models with demand distribution uncertainty: Robust dynamic programing approaches," European Journal of Operational Research, Elsevier, vol. 261(3), pages 880-892.
- van den Heuvel, Wilco & Gutiérrez, José Miguel & Hwang, Hark-Chin, 2011.
"Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities","
European Journal of Operational Research, Elsevier, vol. 213(2), pages 455-457, September.
- van den Heuvel, W.J. & Gutierrez, J.M. & Hwang, H.C., 2010. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," Econometric Institute Research Papers EI 2010-70, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- van den Heuvel, W. & Gutierrez, J.M. & Hwang, H.C., 2011. "Note on "An efficient approach for solving the lot-sizing problem with time-varying storage capacities"," Econometric Institute Research Papers EI 2011-39, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Stan van Hoesel & H. Edwin Romeijn & Dolores Romero Morales & Albert P. M. Wagelmans, 2005. "Integrated Lot Sizing in Serial Supply Chains with Production Capacities," Management Science, INFORMS, vol. 51(11), pages 1706-1719, November.
- Sana, S. & Goyal, S. K. & Chaudhuri, K. S., 2004. "A production-inventory model for a deteriorating item with trended demand and shortages," European Journal of Operational Research, Elsevier, vol. 157(2), pages 357-371, September.
- Toy, Ayhan Özgür & Berk, Emre, 2013. "Dynamic lot sizing for a warm/cold process: Heuristics and insights," International Journal of Production Economics, Elsevier, vol. 145(1), pages 53-66.
- Tang, Lianhua & Li, Yantong & Bai, Danyu & Liu, Tao & Coelho, Leandro C., 2022. "Bi-objective optimization for a multi-period COVID-19 vaccination planning problem," Omega, Elsevier, vol. 110(C).
- Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
- Schwartz, Jay D. & Rivera, Daniel E., 2010. "A process control approach to tactical inventory management in production-inventory systems," International Journal of Production Economics, Elsevier, vol. 125(1), pages 111-124, May.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:98:y:2005:i:2:p:129-135. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.