IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v71y2001i1-3p177-193.html
   My bibliography  Save this article

Spare parts management at complex technology-based organizations: An agenda for research

Author

Listed:
  • Rustenburg, W. D.
  • van Houtum, G. J.
  • Zijm, W. H. M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Rustenburg, W. D. & van Houtum, G. J. & Zijm, W. H. M., 2001. "Spare parts management at complex technology-based organizations: An agenda for research," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 177-193, May.
  • Handle: RePEc:eee:proeco:v:71:y:2001:i:1-3:p:177-193
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(00)00117-1
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Stephen C. Graves, 1985. "A Multi-Echelon Inventory Model for a Repairable Item with One-for-One Replenishment," Management Science, INFORMS, vol. 31(10), pages 1247-1256, October.
    2. Diaz, Angel & Fu, Michael C., 1997. "Models for multi-echelon repairable item inventory systems with limited repair capacity," European Journal of Operational Research, Elsevier, vol. 97(3), pages 480-492, March.
    3. S. Christian Albright, 1989. "An approximation to the stationary distribution of a multiechelon repairable‐item inventory system with finite sources and repair channels," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(2), pages 179-195, April.
    4. Donald Gross, 1982. "On the Ample Service Assumption of Palm's Theorem in Inventory Modeling," Management Science, INFORMS, vol. 28(9), pages 1065-1079, September.
    5. R. M. Simon, 1971. "Stationary Properties of a Two-Echelon Inventory Model for Low Demand Items," Operations Research, INFORMS, vol. 19(3), pages 761-773, June.
    6. Maria Di Mascolo & Yannick Frein & Yves Dallery, 1996. "An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems," Operations Research, INFORMS, vol. 44(1), pages 50-64, February.
    7. Alan J. Kaplan, 1989. "Incorporating redundancy considerations into stockage models," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(5), pages 625-638, October.
    8. John A. Muckstadt, 1973. "A Model for a Multi-Item, Multi-Echelon, Multi-Indenture Inventory System," Management Science, INFORMS, vol. 20(4-Part-I), pages 472-481, December.
    9. Donald Gross & Leonidas C. Kioussis & Douglas R. Miller, 1987. "A Network Decomposition Approach for Approximating the Steady-State Behavior of Markovian Multi-Echelon Reparable Item Inventory Systems," Management Science, INFORMS, vol. 33(11), pages 1453-1468, November.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. R. Sundarraj, 2006. "A model for standardizing human decisions concerning service-contracts management," Annals of Operations Research, Springer, vol. 143(1), pages 171-189, March.
    2. Wang, Wenbin, 2012. "A stochastic model for joint spare parts inventory and planned maintenance optimisation," European Journal of Operational Research, Elsevier, vol. 216(1), pages 127-139.
    3. Vliegen, I.M.H. & Kleingeld, P.A.M. & van Houtum, G.J., 2010. "Separate tools or tool kits: An exploratory study of engineers' preferences," International Journal of Production Economics, Elsevier, vol. 125(1), pages 173-184, May.
    4. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    5. Hu, Qiwei & Boylan, John E. & Chen, Huijing & Labib, Ashraf, 2018. "OR in spare parts management: A review," European Journal of Operational Research, Elsevier, vol. 266(2), pages 395-414.
    6. Candas, Mehmet Ferhat & Kutanoglu, Erhan, 2020. "Integrated location and inventory planning in service parts logistics with customer-based service levels," European Journal of Operational Research, Elsevier, vol. 285(1), pages 279-295.
    7. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2005. "Using repair priorities to reduce stock investment in spare part networks," European Journal of Operational Research, Elsevier, vol. 163(3), pages 733-750, June.
    8. Sleptchenko, A. & van der Heijden, M. C. & van Harten, A., 2002. "Effects of finite repair capacity in multi-echelon, multi-indenture service part supply systems," International Journal of Production Economics, Elsevier, vol. 79(3), pages 209-230, October.
    9. A Sleptchenko & M C van der Heijden & A van Harten, 2003. "Trade-off between inventory and repair capacity in spare part networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 263-272, March.
    10. van Jaarsveld, Willem & Dekker, Rommert, 2011. "Spare parts stock control for redundant systems using reliability centered maintenance data," Reliability Engineering and System Safety, Elsevier, vol. 96(11), pages 1576-1586.
    11. van Jaarsveld, W.L. & Dekker, R., 2010. "Integrating Reliability Centered Maintenance and Spare Parts Stock Control," Econometric Institute Research Papers EI 2010-16, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    12. Wang, Wenbin & Syntetos, Aris A., 2011. "Spare parts demand: Linking forecasting to equipment maintenance," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 47(6), pages 1194-1209.
    13. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    14. Tsai, Shing Chih & Zheng, Ya-Xin, 2013. "A simulation optimization approach for a two-echelon inventory system with service level constraints," European Journal of Operational Research, Elsevier, vol. 229(2), pages 364-374.
    15. Joachim Arts & Rob Basten & Geert-Jan Van Houtum, 2016. "Repairable Stocking and Expediting in a Fluctuating Demand Environment: Optimal Policy and Heuristics," Operations Research, INFORMS, vol. 64(6), pages 1285-1301, December.
    16. El Saadany, Ahmed M.A. & Jaber, Mohamad Y., 2011. "A production/remanufacture model with returns' subassemblies managed differently," International Journal of Production Economics, Elsevier, vol. 133(1), pages 119-126, September.
    17. Eruguz, Ayse Sena & Sahin, Evren & Jemai, Zied & Dallery, Yves, 2016. "A comprehensive survey of guaranteed-service models for multi-echelon inventory optimization," International Journal of Production Economics, Elsevier, vol. 172(C), pages 110-125.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
    2. de Kok, Ton & Grob, Christopher & Laumanns, Marco & Minner, Stefan & Rambau, Jörg & Schade, Konrad, 2018. "A typology and literature review on stochastic multi-echelon inventory models," European Journal of Operational Research, Elsevier, vol. 269(3), pages 955-983.
    3. Qin, Xuwei & Jiang, Zhong-Zhong & Sun, Minghe & Tang, Liang & Liu, Xiaoran, 2021. "Repairable spare parts provisioning for multiregional expanding fleets of equipment under performance-based contracting," Omega, Elsevier, vol. 102(C).
    4. Guide, V. Daniel R. & Srivastava, Rajesh, 1997. "Repairable inventory theory: Models and applications," European Journal of Operational Research, Elsevier, vol. 102(1), pages 1-20, October.
    5. Izack Cohen & Morris A. Cohen & Elad Landau, 2017. "On sourcing and stocking policies in a two-echelon, multiple location, repairable parts supply chain," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(6), pages 617-629, June.
    6. Al-Rifai, Mohammad H. & Rossetti, Manuel D., 2007. "An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 195-213, September.
    7. D Nowicki & U D Kumar & H J Steudel & D Verma, 2008. "Spares provisioning under performance-based logistics contract: profit-centric approach," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(3), pages 342-352, March.
    8. Yunzeng Wang & Morris A. Cohen & Yu-Sheng Zheng, 2000. "A Two-Echelon Repairable Inventory System with Stocking-Center-Dependent Depot Replenishment Lead Times," Management Science, INFORMS, vol. 46(11), pages 1441-1453, November.
    9. Costantino, Francesco & Di Gravio, Giulio & Patriarca, Riccardo & Petrella, Lea, 2018. "Spare parts management for irregular demand items," Omega, Elsevier, vol. 81(C), pages 57-66.
    10. Graves, Stephen C., 1989. "A multi-echelon inventory model with fixed reorder intervals," Working papers 3045-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    11. de Haas, Harrie F. M. & Verrijdt, Jos H. C. M., 1997. "Target setting for the departments in an aircraft repairable item system," European Journal of Operational Research, Elsevier, vol. 99(3), pages 596-602, June.
    12. Rezaei Somarin, Aghil & Chen, Songlin & Asian, Sobhan & Wang, David Z.W., 2017. "A heuristic stock allocation rule for repairable service parts," International Journal of Production Economics, Elsevier, vol. 184(C), pages 131-140.
    13. Lau, Hoong Chuin & Song, Huawei & See, Chuen Teck & Cheng, Siew Yen, 2006. "Evaluation of time-varying availability in multi-echelon spare parts systems with passivation," European Journal of Operational Research, Elsevier, vol. 170(1), pages 91-105, April.
    14. Basten, R.J.I. & van der Heijden, M.C. & Schutten, J.M.J., 2012. "Joint optimization of level of repair analysis and spare parts stocks," European Journal of Operational Research, Elsevier, vol. 222(3), pages 474-483.
    15. Alfredsson, Patrik, 1997. "Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities," European Journal of Operational Research, Elsevier, vol. 99(3), pages 584-595, June.
    16. Chew, E. P. & Johnson, L. A., 1996. "Service level approximations for multiechelon inventory systems," European Journal of Operational Research, Elsevier, vol. 91(3), pages 440-455, June.
    17. Frank Schneider & Ulrich W. Thonemann & Diego Klabjan, 2018. "Optimization of Battery Charging and Purchasing at Electric Vehicle Battery Swap Stations," Transportation Science, INFORMS, vol. 52(5), pages 1211-1234, October.
    18. Rappold, James A. & Van Roo, Ben D., 2009. "Designing multi-echelon service parts networks with finite repair capacity," European Journal of Operational Research, Elsevier, vol. 199(3), pages 781-792, December.
    19. Selçuk, B., 2013. "An adaptive base stock policy for repairable item inventory control," International Journal of Production Economics, Elsevier, vol. 143(2), pages 304-315.
    20. Olof Stenius & Ayşe Gönül Karaarslan & Johan Marklund & A. G. de Kok, 2016. "Exact Analysis of Divergent Inventory Systems with Time-Based Shipment Consolidation and Compound Poisson Demand," Operations Research, INFORMS, vol. 64(4), pages 906-921, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:71:y:2001:i:1-3:p:177-193. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.