IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v64y2000i1-3p21-36.html
   My bibliography  Save this article

The overlapping production planning: A new approach of bounded capacity management

Author

Listed:
  • Bahroun, Z.
  • Campagne, J. -P.
  • Moalla, M.

Abstract

No abstract is available for this item.

Suggested Citation

  • Bahroun, Z. & Campagne, J. -P. & Moalla, M., 2000. "The overlapping production planning: A new approach of bounded capacity management," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 21-36, March.
  • Handle: RePEc:eee:proeco:v:64:y:2000:i:1-3:p:21-36
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(99)00031-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chu, Sydney C. K., 1995. "A mathematical programming approach towards optimized master production scheduling," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 269-279, March.
    2. Gelders, Ludo F. & Van Wassenhove, Luk N., 1985. "Capacity planning in MRP, JIT and OPT: A critique," Engineering Costs and Production Economics, Elsevier, vol. 9(1-3), pages 201-209, April.
    3. Bloemen, R. & Maes, J., 1992. "A DSS for optimizing the aggregate production planning at Monsanto Antwerp," European Journal of Operational Research, Elsevier, vol. 61(1-2), pages 30-40, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Huang, Rong-Hwa & Yang, Chang-Lin, 2008. "Overlapping production scheduling planning with multiple objectives--An ant colony approach," International Journal of Production Economics, Elsevier, vol. 115(1), pages 163-170, September.
    2. Jiae Zhang & Jianjun Yang, 2016. "Flexible job-shop scheduling with flexible workdays, preemption, overlapping in operations and satisfaction criteria: an industrial application," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 4894-4918, August.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lee, L. H. & Chew, E. P. & Ng, T. S., 2005. "Production planning with approved vendor matrices for a hard-disk drive manufacturer," European Journal of Operational Research, Elsevier, vol. 162(2), pages 310-324, April.
    2. Antonio G. Martín & Manuel Díaz-Madroñero & Josefa Mula, 2020. "Master production schedule using robust optimization approaches in an automobile second-tier supplier," Central European Journal of Operations Research, Springer;Slovak Society for Operations Research;Hungarian Operational Research Society;Czech Society for Operations Research;Österr. Gesellschaft für Operations Research (ÖGOR);Slovenian Society Informatika - Section for Operational Research;Croatian Operational Research Society, vol. 28(1), pages 143-166, March.
    3. Yucesan, Enver & de Groote, Xavier, 2000. "Lead times, order release mechanisms, and customer service," European Journal of Operational Research, Elsevier, vol. 120(1), pages 118-130, January.
    4. Ng, T.S. & Lee, L.H. & Chew, E.P., 2006. "Build-pack planning for hard disk drive assembly with approved vendor matrices and stochastic demands," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1117-1140, December.
    5. Draman, Murat & Kuban Altinel, I & Bajgoric, Nijaz & Tamer Unal, Ali & Birgoren, Burak, 2002. "A clone-based graphical modeler and mathematical model generator for optimal production planning in process industries," European Journal of Operational Research, Elsevier, vol. 137(3), pages 483-496, March.
    6. Yenisey, Mehmet Mutlu, 2006. "A flow-network approach for equilibrium of material requirements planning," International Journal of Production Economics, Elsevier, vol. 102(2), pages 317-332, August.
    7. Tan Miller & Emmanuel Peters & Vijay Gupta & Oduntan Bode, 2013. "A logistics deployment decision support system at Pfizer," Annals of Operations Research, Springer, vol. 203(1), pages 81-99, March.
    8. Pürgstaller, Peter & Missbauer, Hubert, 2012. "Rule-based vs. optimisation-based order release in workload control: A simulation study of a MTO manufacturer," International Journal of Production Economics, Elsevier, vol. 140(2), pages 670-680.
    9. Fateme Akhoondi & M.M. Lotfi, 2016. "A heuristic algorithm for master production scheduling problem with controllable processing times and scenario-based demands," International Journal of Production Research, Taylor & Francis Journals, vol. 54(12), pages 3659-3676, June.
    10. Jochem, Patrick & Schönfelder, Martin & Fichtner, Wolf, 2015. "An efficient two-stage algorithm for decentralized scheduling of micro-CHP units," European Journal of Operational Research, Elsevier, vol. 245(3), pages 862-874.
    11. Benton, W. C. & Shin, Hojung, 1998. "Manufacturing planning and control: The evolution of MRP and JIT integration," European Journal of Operational Research, Elsevier, vol. 110(3), pages 411-440, November.
    12. Vijay Gupta & Emmanuel Peters & Tan Miller & Kelvin Blyden, 2002. "Implementing a Distribution-Network Decision-Support System at Pfizer/Warner-Lambert," Interfaces, INFORMS, vol. 32(4), pages 28-45, August.
    13. Jonsson, Patrik & Kjellsdotter Ivert, Linea, 2015. "Improving performance with sophisticated master production scheduling," International Journal of Production Economics, Elsevier, vol. 168(C), pages 118-130.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:64:y:2000:i:1-3:p:21-36. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.