Structure optimization for continuous production systems with buffers under reliability constraints
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- דבי עובדיה, 1989. "חונכות ילדי אסירים," Working Papers 144, National Insurance Institute of Israel.
- אסתר טולידנו, 1989. "מקבלי דמי אבטלה בשנת 1988," Working Papers 538, National Insurance Institute of Israel.
- אסתר טולידנו, 1996. "מקבלי דמי אבטלה בשנת 1995," Working Papers 509, National Insurance Institute of Israel.
- תמר אליאב, 1996. "גמלאות אמהות 1995-1992," Working Papers 395, National Insurance Institute of Israel.
- אסתר טולידנו, 1994. "מקבלי דמי אבטלה בשנת 1993," Working Papers 439, National Insurance Institute of Israel.
- הנק הבסי ובלהה זיסלין, 1996. "תב"ל - תעסוקת בית למרותקים," Working Papers 162, National Insurance Institute of Israel.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chen, Zhiwei & Zhang, Hao & Wang, Xinyue & Yang, Jinling & Dui, Hongyan, 2024. "Reliability analysis and redundancy design of satellite communication system based on a novel Bayesian environmental importance," Reliability Engineering and System Safety, Elsevier, vol. 243(C).
- Fitouhi, Mohamed-Chahir & Nourelfath, Mustapha & Gershwin, Stanley B., 2017. "Performance evaluation of a two-machine line with a finite buffer and condition-based maintenance," Reliability Engineering and System Safety, Elsevier, vol. 166(C), pages 61-72.
- Hamada, Michael & Martz, Harry F. & Berg, Eric C. & Koehler, Arthur J., 2006. "Optimizing the product-based availability of a buffered industrial process," Reliability Engineering and System Safety, Elsevier, vol. 91(9), pages 1039-1048.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Hinterhuber, Hans H. & Friedrich, Stephan A., 2002. "The technology dimension of strategic leadership : The leadership challenge for production economists," International Journal of Production Economics, Elsevier, vol. 77(3), pages 191-203, June.
- Portnov, Boris A. & Erell, Evyatar, 2004. "Interregional inequalities in Israel, 1948-1995: divergence or convergence?," Socio-Economic Planning Sciences, Elsevier, vol. 38(4), pages 255-289, December.
- Segelod, Esbjorn, 2002. "Resource allocation in a few industries: Determinants and trends," International Journal of Production Economics, Elsevier, vol. 77(1), pages 63-70, May.
- Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2014.
"Network DEA II,"
International Series in Operations Research & Management Science, in: Wade D. Cook & Joe Zhu (ed.), Data Envelopment Analysis, edition 127, chapter 0, pages 307-327,
Springer.
- Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2007. "Network DEA," Springer Books, in: Joe Zhu & Wade D. Cook (ed.), Modeling Data Irregularities and Structural Complexities in Data Envelopment Analysis, chapter 0, pages 209-240, Springer.
- Fare, Rolf & Grosskopf, Shawna, 2000. "Network DEA," Socio-Economic Planning Sciences, Elsevier, vol. 34(1), pages 35-49, March.
- Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
- Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
- Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
- Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo, 2002. "Inventory management in supply chains: a reinforcement learning approach," International Journal of Production Economics, Elsevier, vol. 78(2), pages 153-161, July.
- Hallikas, Jukka & Virolainen, Veli-Matti & Tuominen, Markku, 2002. "Risk analysis and assessment in network environments: A dyadic case study," International Journal of Production Economics, Elsevier, vol. 78(1), pages 45-55, July.
- Zhaohui Zeng, Amy & Hayya, Jack C., 1999. "The performance of two popular service measures on management effectiveness in inventory control," International Journal of Production Economics, Elsevier, vol. 58(2), pages 147-158, January.
- Hicks, C. & McGovern, T. & Earl, C. F., 2000. "Supply chain management: A strategic issue in engineer to order manufacturing," International Journal of Production Economics, Elsevier, vol. 65(2), pages 179-190, April.
- Homburg, Carsten, 2001. "Using data envelopment analysis to benchmark activities," International Journal of Production Economics, Elsevier, vol. 73(1), pages 51-58, August.
- Huiskonen, Janne & Pirttila, Timo, 2002. "Lateral coordination in a logistics outsourcing relationship," International Journal of Production Economics, Elsevier, vol. 78(2), pages 177-185, July.
- Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
- Kim, Bowon, 1998. "Optimal development of production technology when autonomous and induced learning are present," International Journal of Production Economics, Elsevier, vol. 55(1), pages 39-52, June.
- Motwani, Jaideep & Mirchandani, Dinesh & Madan, Manu & Gunasekaran, A., 2002. "Successful implementation of ERP projects: Evidence from two case studies," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 83-96, January.
- Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
- Manthou, Vassiliki & Vlachopoulou, Maro, 2001. "Bar-code technology for inventory and marketing management systems: A model for its development and implementation," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 157-164, May.
- Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
- Kavusturucu, Ayse & Gupta, Surendra M., 1999. "Manufacturing systems with machine vacations, arbitrary topology and finite buffers," International Journal of Production Economics, Elsevier, vol. 58(1), pages 1-15, January.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:70:y:2001:i:1:p:77-87. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.