IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v48y1997i2p129-139.html
   My bibliography  Save this article

Analytical evaluation of heuristics performance for the single-level lot-sizing problem for products with constant demand

Author

Listed:
  • Ganas, Ioannis S.
  • Papachristos, Sotirios

Abstract

No abstract is available for this item.

Suggested Citation

  • Ganas, Ioannis S. & Papachristos, Sotirios, 1997. "Analytical evaluation of heuristics performance for the single-level lot-sizing problem for products with constant demand," International Journal of Production Economics, Elsevier, vol. 48(2), pages 129-139, January.
  • Handle: RePEc:eee:proeco:v:48:y:1997:i:2:p:129-139
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(96)00074-6
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Chand, Suresh, 1982. "Lot sizing for products with finite demand horizon and periodic review inventory policy," European Journal of Operational Research, Elsevier, vol. 11(2), pages 145-148, October.
    2. Harvey M. Wagner & Thomson M. Whitin, 1958. "Dynamic Version of the Economic Lot Size Model," Management Science, INFORMS, vol. 5(1), pages 89-96, October.
    3. Axsater, Sven, 1982. "Worst case performance for lot sizing heuristics," European Journal of Operational Research, Elsevier, vol. 9(4), pages 339-343, April.
    4. Gabriel R. Bitran & Thomas L. Magnanti & Horacio H. Yanasse, 1984. "Approximation Methods for the Uncapacitated Dynamic Lot Size Problem," Management Science, INFORMS, vol. 30(9), pages 1121-1140, September.
    5. Suresh Chand & Suresh P. Sethi & Jean-Marie Proth, 1990. "Existence of Forecast Horizons in Undiscounted Discrete-Time Lot Size Models," Operations Research, INFORMS, vol. 38(5), pages 884-892, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. van den Heuvel, W.J. & Wagelmans, A.P.M., 2008. "A holding cost bound for the economic lot-sizing problem with time-invariant cost parameters," Econometric Institute Research Papers EI 2008-10, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
    2. Massonnet, G. & Gayon, J.-P. & Rapine, C., 2014. "Approximation algorithms for deterministic continuous-review inventory lot-sizing problems with time-varying demand," European Journal of Operational Research, Elsevier, vol. 234(3), pages 641-649.
    3. Robert L. Smith & Rachel Q. Zhang, 1998. "Infinite Horizon Production Planning in Time-Varying Systems with Convex Production and Inventory Costs," Management Science, INFORMS, vol. 44(9), pages 1313-1320, September.
    4. Wilco Van den Heuvel & Albert P. M. Wagelmans, 2010. "Worst-Case Analysis for a General Class of Online Lot-Sizing Heuristics," Operations Research, INFORMS, vol. 58(1), pages 59-67, February.
    5. Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
    6. Rita Vachani, 1992. "Performance of heuristics for the uncapacitated lot‐size problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(6), pages 801-813, October.
    7. Chung-Yee Lee & Sila Çetinkaya & Wikrom Jaruphongsa, 2003. "A Dynamic Model for Inventory Lot Sizing and Outbound Shipment Scheduling at a Third-Party Warehouse," Operations Research, INFORMS, vol. 51(5), pages 735-747, October.
    8. Milind Dawande & Srinagesh Gavirneni & Yinping Mu & Suresh Sethi & Chelliah Sriskandarajah, 2010. "On the Interaction Between Demand Substitution and Production Changeovers," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 682-691, September.
    9. Dawande, Milind & Gavirneni, Srinagesh & Naranpanawe, Sanjeewa & Sethi, Suresh P., 2009. "Discrete forecast horizons for two-product variants of the dynamic lot-size problem," International Journal of Production Economics, Elsevier, vol. 120(2), pages 430-436, August.
    10. Archis Ghate & Robert L. Smith, 2009. "Optimal Backlogging Over an Infinite Horizon Under Time-Varying Convex Production and Inventory Costs," Manufacturing & Service Operations Management, INFORMS, vol. 11(2), pages 362-368, June.
    11. Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
    12. Milind Dawande & Srinagesh Gavirneni & Sanjeewa Naranpanawe & Suresh Sethi, 2007. "Forecast Horizons for a Class of Dynamic Lot-Size Problems Under Discrete Future Demand," Operations Research, INFORMS, vol. 55(4), pages 688-702, August.
    13. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    14. Chung-Yee Lee & Sila Çetinkaya & Albert P. M. Wagelmans, 2001. "A Dynamic Lot-Sizing Model with Demand Time Windows," Management Science, INFORMS, vol. 47(10), pages 1384-1395, October.
    15. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.
    16. Safer, Hershel M. & Orlin, James B., 1953-, 1995. "Fast approximation schemes for multi-criteria flow, knapsack, and scheduling problems," Working papers 3757-95., Massachusetts Institute of Technology (MIT), Sloan School of Management.
    17. Richter, Knut & Weber, Jens, 2001. "The reverse Wagner/Whitin model with variable manufacturing and remanufacturing cost," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 447-456, May.
    18. S. Bylka & S. Sethi & G. Sorger, 1992. "Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(4), pages 487-507, June.
    19. Battini, Daria & Persona, Alessandro & Sgarbossa, Fabio, 2014. "A sustainable EOQ model: Theoretical formulation and applications," International Journal of Production Economics, Elsevier, vol. 149(C), pages 145-153.
    20. Siao-Leu Phouratsamay & Safia Kedad-Sidhoum & Fanny Pascual, 2021. "Coordination of a two-level supply chain with contracts," 4OR, Springer, vol. 19(2), pages 235-264, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:48:y:1997:i:2:p:129-139. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.