IDEAS home Printed from https://ideas.repec.org/a/inm/ormnsc/v19y1972i4-part-1p391-405.html
   My bibliography  Save this article

An Analytical Model of a Two-Product, One-Machine, Production-Inventory System

Author

Listed:
  • Thom J. Hodgson

    (University of Florida)

Abstract

This paper is concerned with the modeling and analysis of a one-machine two-product, integrated production-inventory system. A semi-Markovian model is developed which incorporates a state dependent control system heretofore not used in integrated production-inventory models. Control optimization is achieved through the use of Markov-renewal programming. The model is exercised over a range of parameters in order to determine the characteristics of the system. An analysis of the experimental results leads to the following conjectures about the production-inventory system: 1. For the production-inventory system, the economic manufacturing quantity is greater than that seen in the deterministically derived EMQ. The increase results primarily from increases in expected overtime costs and expected setup costs rather than increases in stockout costs. This is important for applications, since overtime and setup costs are a good deal easier to quantify than stockout costs in a real system. 2. Under some conditions, deterministically derived rules for the application of overtime have merit in a stochastic system.

Suggested Citation

  • Thom J. Hodgson, 1972. "An Analytical Model of a Two-Product, One-Machine, Production-Inventory System," Management Science, INFORMS, vol. 19(4-Part-1), pages 391-405, December.
  • Handle: RePEc:inm:ormnsc:v:19:y:1972:i:4-part-1:p:391-405
    DOI: 10.1287/mnsc.19.4.391
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.19.4.391
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.19.4.391?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Seki, Yoichi & Kogure, Keiji, 1996. "Lot scheduling problem for continuous demand," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 7-15, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:19:y:1972:i:4-part-1:p:391-405. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.