IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v39y1995i3p243-253.html
   My bibliography  Save this article

An analysis of the diffusion of flexible manufacturing systems

Author

Listed:
  • Handfield, Robert B.
  • Pagell, Mark D.

Abstract

No abstract is available for this item.

Suggested Citation

  • Handfield, Robert B. & Pagell, Mark D., 1995. "An analysis of the diffusion of flexible manufacturing systems," International Journal of Production Economics, Elsevier, vol. 39(3), pages 243-253, May.
  • Handle: RePEc:eee:proeco:v:39:y:1995:i:3:p:243-253
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0925-5273(95)00026-K
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Dean M. Schroeder, 1990. "A dynamic perspective on the impact of process innovation upon competitive strategies," Strategic Management Journal, Wiley Blackwell, vol. 11(1), pages 25-41, January.
    2. Kathryn E. Stecke, 1983. "Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems," Management Science, INFORMS, vol. 29(3), pages 273-288, March.
    3. Eric von Hippel, 1986. "Lead Users: A Source of Novel Product Concepts," Management Science, INFORMS, vol. 32(7), pages 791-805, July.
    4. דליה גורדון ותמר אליאב, 1992. "משפחות חד הוריות, 1991," Working Papers 539, National Insurance Institute of Israel.
    5. Binswanger, Hans, 1986. "Agricultural Mechanization: A Comparative Historical Perspective," The World Bank Research Observer, World Bank, vol. 1(1), pages 27-56, January.
    6. Edwin Mansfield, 1993. "The Diffusion of Flexible Manufacturing Systems in Japan, Europe and the United States," Management Science, INFORMS, vol. 39(2), pages 149-159, February.
    7. Mitchell, Roger H. & Mabert, Vincent A., 1986. "Robotics for smaller manufacturers: Myths and realities," Business Horizons, Elsevier, vol. 29(4), pages 9-16.
    8. אסתר טולידנו, 1992. "מקבלי דמי אבטלה בשנת 1991," Working Papers 563, National Insurance Institute of Israel.
    9. Cainarca, Gian Carlo & Colombo, Massimo G. & Mariotti, Sergio, 1989. "An evolutionary pattern of innovation diffusion. The case of flexible automation," Research Policy, Elsevier, vol. 18(2), pages 59-86, April.
    10. Ray, George F., 1989. "Full circle: The diffusion of technology," Research Policy, Elsevier, vol. 18(1), pages 1-18, February.
    11. תמר אליאב ולאה ענבר, 1992. "גמלאות אמהות 1990/91," Working Papers 519, National Insurance Institute of Israel.
    12. Donald Gerwin, 1993. "Manufacturing Flexibility: A Strategic Perspective," Management Science, INFORMS, vol. 39(4), pages 395-410, April.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Castka, Pavel & Balzarova, Michaela A., 2008. "ISO 26000 and supply chains--On the diffusion of the social responsibility standard," International Journal of Production Economics, Elsevier, vol. 111(2), pages 274-286, February.
    2. Tomino, Takahiro & Park, Youngwon & Hong, Paul & Roh, James Jungbae, 2009. "Market flexible customizing system (MFCS) of Japanese vehicle manufacturers: An analysis of Toyota, Nissan and Mitsubishi," International Journal of Production Economics, Elsevier, vol. 118(2), pages 375-386, April.
    3. Belassi, W & Fadlalla, A, 1998. "An integrative framework for FMS diffusion," Omega, Elsevier, vol. 26(6), pages 699-713, December.
    4. Robert B. Handfield & James Aitken & Neil Turner & Tillmann Boehme & Cecil Bozarth, 2022. "Assessing Adoption Factors for Additive Manufacturing: Insights from Case Studies," Logistics, MDPI, vol. 6(2), pages 1-22, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Kalu, Timothy Ch. U., 1999. "Capital budgeting under uncertainty: An extended goal programming approach," International Journal of Production Economics, Elsevier, vol. 58(3), pages 235-251, January.
    2. Ginn, Martin E., 1998. "Underpinning professional career development through a systems analysis methodology," Socio-Economic Planning Sciences, Elsevier, vol. 32(1), pages 67-81, March.
    3. Gonzalez-Benito, Javier & Suarez-Gonzalez, Isabel & Spring, Martin, 2000. "Complementarities between JIT purchasing practices: An economic analysis based on transaction costs," International Journal of Production Economics, Elsevier, vol. 67(3), pages 279-293, October.
    4. Bal, F. & Button, K. J. & Nijkamp, P., 2002. "Ceteris paribus, meta-analysis and value transfer," Socio-Economic Planning Sciences, Elsevier, vol. 36(2), pages 127-138, June.
    5. Andersson, Jonas & Melchiors, Philip, 2001. "A two-echelon inventory model with lost sales," International Journal of Production Economics, Elsevier, vol. 69(3), pages 307-315, February.
    6. Shibuya, Takeshi & Dohi, Tadashi & Osaki, Shunji, 1998. "Optimal continuous review policies for spare part provisioning with random lead times," International Journal of Production Economics, Elsevier, vol. 55(3), pages 257-271, August.
    7. Kim, Kap Hwan, 1995. "Positioning of automated guided vehicles in a loop layout to minimize the mean vehicle response time," International Journal of Production Economics, Elsevier, vol. 39(3), pages 201-214, May.
    8. Ertugrul Karsak, E. & Tolga, Ethem, 2001. "Fuzzy multi-criteria decision-making procedure for evaluating advanced manufacturing system investments," International Journal of Production Economics, Elsevier, vol. 69(1), pages 49-64, January.
    9. Lai, K. K. & Xue, Jue & Zhang, Guoqing, 2002. "Layout design for a paper reel warehouse: A two-stage heuristic approach," International Journal of Production Economics, Elsevier, vol. 75(3), pages 231-243, February.
    10. Lessner, Lawrence, 2008. "HIV prevalence for New York State using Newborn Seroprevalence and AIDS Surveillance Data," Socio-Economic Planning Sciences, Elsevier, vol. 42(4), pages 286-299, December.
    11. Pennings, Enrico & Natter, Martin, 2001. "Strategic diversification and capacity utilization," International Journal of Production Economics, Elsevier, vol. 72(3), pages 261-272, August.
    12. Baker, Rose D., 2000. "Calculating the expected failure rate of complex equipment subject to hazardous repair," International Journal of Production Economics, Elsevier, vol. 67(1), pages 53-61, August.
    13. De Toni, Alberto & Nassimbeni, Guido, 2001. "A method for the evaluation of suppliers co-design effort," International Journal of Production Economics, Elsevier, vol. 72(2), pages 169-180, July.
    14. Branas, Charles C. & Revelle, Charles S., 2001. "An iterative switching heuristic to locate hospitals and helicopters," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 11-30, March.
    15. Eben-Chaime, Moshe & Pliskin, Nava, 1997. "Operations management of multiple machine automatic warehousing systems," International Journal of Production Economics, Elsevier, vol. 51(1-2), pages 83-98, August.
    16. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
    17. Lovell, Michael C., 1996. "Macroeconomic implications of S,s versus accelerator finished goods inventory strategies," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 55-64, August.
    18. Forza, Cipriano & Filippini, Roberto, 1998. "TQM impact on quality conformance and customer satisfaction: A causal model," International Journal of Production Economics, Elsevier, vol. 55(1), pages 1-20, June.
    19. Avella, Lucia & Fernandez, Esteban & Vazquez, Camilo J., 2001. "Analysis of manufacturing strategy as an explanatory factor of competitiveness in the large Spanish industrial firm," International Journal of Production Economics, Elsevier, vol. 72(2), pages 139-157, July.
    20. Song, D. P. & Hicks, C. & Earl, C. F., 2002. "Product due date assignment for complex assemblies," International Journal of Production Economics, Elsevier, vol. 76(3), pages 243-256, April.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:39:y:1995:i:3:p:243-253. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.